GENERAL DYNAMICS-OTS, INC.
- Unique Entity ID (UEI)
- KZK8C85C1T94
- Parent company
- GENERAL DYNAMICS CORP (UEI VF58HFRNGEL8)
- Registered address
- NICEVILLE, FL, district FL-01
- Other names on record
- GENERAL DYNAMICS O T S (NICEVI; GENERAL DYNAMICS O T S (NICEVILLE), INC; GENERAL DYNAMICS OTS (NICEVILLE), INC.; GENERAL DYNAMICS OTS (OTI), IN; ORLANDO TECHNOLOGY INC
Dollars are contract obligations in the fiscal year, as USAspending adds them up from each award's transactions. A contract's full value can be larger and run over several years. A figure below zero is money taken back from contracts signed earlier.
Source: USAspending.gov, the Treasury’s public record of federal spending. Our copy was saved November 19, 2026.
Which agencies pay this vendor, and where the work is done
Fiscal year 2027
USAspending lists no contract dollars for this vendor in fiscal year 2027 yet.
Fiscal year 2026: $287,630,533.30
| Agency | Contract dollars |
|---|---|
| Department of Defense | $287,630,533.30 |
| District where the work is done | Contract dollars |
|---|---|
| AR-04Bruce Westerman | $248,271,450.20 |
| FL-01Jimmy Patronis | $39,358,583.10 |
| AL-05Dale W. Strong | $500 |
| IA-01Mariannette Miller-Meeks | $0 |
| VT-00Becca Balint | $0 |
Largest awards
The largest contract awards with activity from October 1, 2025 to September 30, 2027, by each award's total amount over its whole life. 0 rows of the answer belong to related companies and are left out.
| Award | Agency | Where the work is done | Award total | Start |
|---|---|---|---|---|
| W15QKN23F0560UKRAINE- THE M1128 LAP IS FOR THE MANUFACTURE, TEST, PACKAGING, AND DELIVERY OF THE 155MM M1128 PROJECTILE. | Department of DefenseDepartment of the Army | NICEVILLE, FL-01 | $219,739,321.11 | Ends August 31, 2027 |
| W519TC24F0400ORDER W51TC24F0400 IS FOR THE CONTRACTOR TO LOAD, ASSEMBLE, AND PACK A QUANTITY OF 346,678 155MM M795 TNT LOADED PROJECTILES. | Department of DefenseDepartment of the Army | HAMPTON, AR-04 | $165,308,118.58 | Ends April 30, 2029 |
| W519TC25F0358ORDER W519TC25F0358 IS FOR THE CONTRACTOR TO LOAD, ASSEMBLE, AND PACK A QUANTITY OF 242,504 155MM M795 TNT PROJECTILES. | Department of DefenseDepartment of the Army | HAMPTON, AR-04 | $131,643,296.40 | Ends August 31, 2030 |
| W519TC23F0108MINIMUM GUARANTEE FOR THE CONTRACTOR TO STAND UP A 155MM PROJECTILE LOAD, ASSEMBLE, PACK PRODUCTION LINE AT THE CAMDEN, ARKANSAS FACILITY. | Department of DefenseDepartment of the Army | HAMPTON, AR-04 | $121,577,777.52 | Ends May 31, 2027 |
| FA868116C0002IMPROVED LETHAIITY WARHEAD (ILW) | Department of DefenseDefense Contract Management Agency | NICEVILLE, FL-01 | $105,927,302.38 | Ends November 6, 2019 |
| W15QKN25F0399DELIVERY ORDER W15QKN25F0399 IS FOR THE MANUFACTURE, ASSEMBLY, INSPECTION, PACKAGE, AND DELIVERY OF THE 155MM M1128 LOAD, ASSEMBLE, AND PACK. | Department of DefenseDepartment of the Army | NICEVILLE, FL-01 | $91,420,201.92 | Ends November 30, 2028 |
| W519TC26F0142ORDER W519TC26F0142 IS FOR THE CONTRACTOR TO LOAD, ASSEMBLE, AND PACK A QUANTITY OF 102,036 155MM TNT LOADED PROJECTILES. | Department of DefenseDepartment of the Army | HAMPTON, AR-04 | $62,055,234.12 | Ends July 31, 2030 |
| W15QKN24F0443UKRAINE: THE PURPOSE OF THIS DELIVERY ORDER (FMS FUNDS) IS FOR THE M232A2 MACS LAP FOR THE 155MM PROPELLING CHARGES. | Department of DefenseDepartment of the Army | HAMPTON, AR-04 | $62,047,687.15 | Ends May 31, 2030 |
| W15QKN23F0683UKRAINE: THIS DELIVERY ORDER IS FOR THE PURCHASE OF PRODUCTION QUANTITIES FOR THE M231 AND M232A2 MACS LAP PROPELLING CHARGES TO SUPPORT THE PRESIDENTIAL BUYBACK EFFORT. | Department of DefenseDepartment of the Army | HAMPTON, AR-04 | $55,801,329.54 | Ends March 31, 2028 |
| W15QKN26F0178DELIVERY ORDER W15QKN26F0178 UNDER BASE CONTRACT W15QKN-19-D-0110 IS FUND GFM STORAGE CAPACITY INCREASE IN SUPPORT OF THE PRODUCTION OF THE MACS M231/M232 TYPE LAP FOR THE 155MM PROPELLING CHARGES. | Department of DefenseDepartment of the Army | HAMPTON, AR-04 | $54,811,658 | Ends September 30, 2028 |
| W15QKN22F0351THIS CAR IS FMS FUNDS FOR DELIVERY ORDER PURCHASE OF PRODUCTION QUANTITIES OF THE M231 AND M232A2 MACS LAP PROPELLING CHARGES | Department of DefenseDepartment of the Army | NICEVILLE, FL-01 | $17,447,802.40 | Ends July 31, 2026 |
| W15QKN23F0048THIS DELIVERY ORDER IS FOR THE PURCHASE OF THE MACS LAP M232A2 ADDITIONAL FIRST ARTICLE TEST (AFAT) AND PRODUCTION QUANTITIES FOR THE M232A2 PROPELLING CHARGES. | Department of DefenseDepartment of the Army | NICEVILLE, FL-01 | $15,511,977.75 | Ends July 31, 2026 |
| N0017425F1077FUZE KITS ORDER UNDER OPTION YEAR III | Department of DefenseDepartment of the Navy | WILLISTON, VT-00 | $306,257.68 | Ends November 30, 2026 |
| SPRRA226F0036COST FOR TRANSPORTATION OF GFP | Department of DefenseDefense Logistics Agency | NICEVILLE, FL-01 | $11,393 | Ends February 12, 2026 |
| HQ085926FF764SCALABLE HOMELAND INNOVATIVE ENTERPRISE LAYERED DEFENSE (SHIELD) INITIAL ORDER. | Department of DefenseMissile Defense Agency | HUNTSVILLE, AL-05 | $500 | Ends December 28, 2035 |
Subcontracts it reported
A prime contractor reports the subcontracts it gives under an award (first-tier subawards). These are the largest it reported under its three largest awards, from every year of each award.
Under award W15QKN23F0560
| Subcontractor | What it is for, as reported | Amount | Date |
|---|---|---|---|
| NAMMO DEFENSE SYSTEMS INC. | PROPELLANT GRAIN, ASSEMBLED; CASTING TABLES; PRODUCTION TOOLING MOLDS; AUTO X-RAY SYSTEM; PLANT 3 RESEARCH TOOLING | $132,279,040.21 | |
| NAMMO DEFENSE SYSTEMS INC. | IGNITER ASSEMBLY KITAND IGNITER CUP ASSEMBLY | $12,505,079.25 | |
| NAMMO DEFENSE SYSTEMS INC. | PROPELLANT GRAIN, ASSEMBLED | $9,905,842.40 | |
| INTEGRATED PRODUCTION SYSTEMS, INC. | AUTOMATION KETTLE SYSTEM | $7,455,907 | |
| WELDON MACHINE TOOL, INC. | ROBOTIC DRILL | $5,570,000 | |
| APEX CONTROL SYSTEMS INC | 155MM PROJECTILE CONTROLLED AIR-COOLING LINE | $3,760,000 | |
| DESIGN & ASSEMBLY CONCEPTS, INC | X-RAY CELL AUTOMATION | $1,745,000 | |
| ICOR CONSTRUCTION LLC | MOD TO BUILDING 47 TO SUPPORT M1128 PRODUCTION | $902,108 | |
| FAXON MACHINING, LLC | LINERS, SUPPLEMENTARY CHARGE, THREADED | $864,021.15 | |
| WELDON MACHINE TOOL, INC. | LINE 2 ROBOTIC DRILL | $776,506 |
More subcontracts are reported under this award; the 10 largest are listed.
Under award W519TC24F0400
| Subcontractor | What it is for, as reported | Amount | Date |
|---|---|---|---|
| PARAMOUNT ENTERPRISES INTERNATIONAL, INC. | TNT PER MIL-DTL-248D T-1, 25% DUE, LOAD BOAT 1ST SHIPMENT AND 25% DUE, LOAD BOAT 2ND SHIPMENT | $15,632,588.10 | |
| PARAMOUNT ENTERPRISES INTERNATIONAL, INC. | TNT PER MIL-DTL-248D T-1, 25% PAYMENT OF SHIPMENT 1 LOAD SHIP AND 25% PAYMENT OF SHIPMENT 2 LOAD SHIP | $9,764,620.58 | |
| PARAMOUNT ENTERPRISES INTERNATIONAL, INC. | TNT PER MIL-DTL-248D T-1 AND 25% PAYMENT OF SHIPMENT 1 LOAD SHIP | $5,735,376.30 | |
| THALER MACHINE COMPANY, LLC | LINERS, SUPPLEMENTARY CHARGE, THREADED | $2,736,000 | |
| TEXAMERICAS CENTER | NTE: TNT STORAGE LEASE AGREEMENT WITH ADD'L BUNKERS | $2,000,000 | |
| FAXON MACHINING, LLC | LINERS, SUPPLEMENTARY CHARGE, THREADED | $1,377,500 | |
| IGE PERFORMANCE CHEMICALS LLC | NITROTOLUENE 60, IMX ADDITIVE IMPROVING CAST QUALITY | $1,155,600 | |
| RPI MOLDING, LLC | OBTURATORS | $511,432.05 | |
| ICOR CONSTRUCTION LLC | B47 EXHAUST FANS FOR CHILLER/HEATER ROOM | $402,650 | |
| ICOR CONSTRUCTION LLC | B47 TUNNEL 3200-AMP ELECTRICAL SERVICE (80%) | $312,777.60 |
More subcontracts are reported under this award; the 10 largest are listed.
Under award W519TC25F0358
| Subcontractor | What it is for, as reported | Amount | Date |
|---|---|---|---|
| PARAMOUNT ENTERPRISES INTERNATIONAL, INC. | TNT PER MIL-DTL-248D T-1 | $48,813,425.92 | |
| PARAMOUNT ENTERPRISES INTERNATIONAL, INC. | TNT PER MIL-DTL-248D T-1 | $1,614,990.61 | |
| IGE PERFORMANCE CHEMICALS LLC | NITROTOLUENE 60, IMX ADDITIVE IMPROVING CAST QUALITY | $808,920 | |
| THE PRODUCTIVITY TEAM LLC | PROGRAM EXECUTIVE SUPPORT,SR. AUTOMATTION ENGINEER 1,SR. AUTOMATTION ENGINEER 2,T&M EXPENSES ESTIMATE | $204,298 | |
| WILLRICH PRECISION INSTRUMENT COMPANY, INC | LINE 1 - DESIGN & REBUILD GAGING MODULE CONTROLS, ETC,LINE 1 - MATERIALS, CUSTOM PROGRAM INSTALL,LINE 1 - ONSITE SUPPORT FOR 2 TECHS,LINE 2 - BUILD REPLACEMENT GAGING MODULE CONTROLS, ETC,LINE 2 - MATERIALS, CUSTOM PROGRAM INSTALL, DEBUG,LINE 2 - ONSITE SUPPORT FOR 2 TECHS | $133,800 | |
| THE PRODUCTIVITY TEAM LLC | INCREASE LABOR, TRAVEL AND EXPENSES | $102,149.40 |
Lobbying reports and campaign receipts that name this vendor
A name is matched only when it is the same name under the exact-name rule: letters and numbers alike, "&" read as "and", a leading "the" and one closing legal form (Inc, LLC, Corp, Corporation, Co, LP, LLP) set aside. A near name is never a match. Each match says which name matched.
GENERAL DYNAMICS: its page on this site
How it matched: parent company name, exact name, in our table of organizations named in lobbying reports.
Lobbying reports that name GENERAL DYNAMICS CORP
How it matched: parent company name, exact name: the name in the lobbying report as client.
| Registrant | Client | Amount for the whole quarter | Quarter | Filed | Report |
|---|---|---|---|---|---|
| GENERAL DYNAMICS CORP | GENERAL DYNAMICS CORP | $3,320,000reported as expenses | Third quarter of 2026 | Open the report | |
| INNOVATIVE FEDERAL STRATEGIES, LLC | GENERAL DYNAMICS | $40,000reported as income | Third quarter of 2026 | Open the report | |
| HARBINGER STRATEGIES, LLC | GENERAL DYNAMICS | $50,000reported as income | Third quarter of 2026 | Open the report | |
| VAN SCOYOC ASSOCIATES | GENERAL DYNAMICS | $40,000reported as income | Third quarter of 2026 | Open the report | |
| AMERICAN DEFENSE INTERNATIONAL | GENERAL DYNAMICS | $50,000reported as income | Third quarter of 2026 | Open the report | |
| FIFESTRATEGIES, LLC | GENERAL DYNAMICS | $70,000reported as income | Third quarter of 2026 | Open the report | |
| THE NICKLES GROUP, LLC | GENERAL DYNAMICS | $60,000reported as income | Third quarter of 2026 | Open the report | |
| DB3, LLC (FKA THE DASCHLE GROUP) | GENERAL DYNAMICS | $50,000reported as income | Third quarter of 2026 | Open the report | |
| PRASAM | GENERAL DYNAMICS | $50,000reported as income | Third quarter of 2026 | Open the report | |
| C. BAKER CONSULTING, INC. | GENERAL DYNAMICS CORPORATION | $30,000reported as income | Third quarter of 2026 | Open the report | |
| MELTSNER STRATEGIES, LLC | GENERAL DYNAMICS CORPORATION | $12,500reported as income | Third quarter of 2026 | Open the report |
FEC receipts that name GENERAL DYNAMICS CORP as the employer
How it matched: parent company name, exact name, as the employer of itemized receipts from individuals (FEC).
- Joe Courtney: 1 itemized receipt, $2,000
- John Hoeven: 1 itemized receipt, $500
- Dan Newhouse: 1 itemized receipt, $100
Only the 25 largest itemized receipts of each committee are saved, so this counts those receipts and no others. An employer is the contributor's own answer on the form.