ESTES BROS. CONST. INC.
- Unique Entity ID (UEI)
- YKVNGM329N76
- Parent company
- ESTES BROS. CONST. INC. (this vendor is its own parent)
- Registered address
- JONESVILLE, VA, district VA-09
- Other names on record
- ESTES BROS CONST INCORPORATED; ESTES BROS. CONST., INC.; ESTES BROTHERS CONSTRUCTION INC; ESTES BROTHERS CONSTRUCTION INC; ESTES BROTHERS CONSTRUCTION INCORPORATED; ESTES BROTHERS CONSTRUCTION, INC
Dollars are contract obligations in the fiscal year, as USAspending adds them up from each award's transactions. A contract's full value can be larger and run over several years. A figure below zero is money taken back from contracts signed earlier.
Source: USAspending.gov, the Treasury’s public record of federal spending. Our copy was saved November 16, 2026.
Which agencies pay this vendor, and where the work is done
Fiscal year 2027
USAspending lists no contract dollars for this vendor in fiscal year 2027 yet.
Fiscal year 2026: $25,209,139.14
| Agency | Contract dollars |
|---|---|
| Department of Transportation | $25,209,139.14 |
| District where the work is done | Contract dollars |
|---|---|
| NC-11Chuck Edwards | $13,176,296.22 |
| VA-09H. Morgan Griffith | $5,771,904.58 |
| TN-01Diana Harshbarger | $3,243,288.91 |
| TN-03Charles J. "Chuck" Fleischmann | $2,835,371.94 |
| MS-03Michael Guest | $182,277.65 |
| FL-26Mario Diaz-Balart | $0 |
| MS-02Bennie G. Thompson | -$0.16 |
Largest awards
The largest contract awards with activity from October 1, 2025 to September 30, 2027, by each award's total amount over its whole life. 0 rows of the answer belong to related companies and are left out.
| Award | Agency | Where the work is done | Award total | Start |
|---|---|---|---|---|
| 693C7323C000018PROJECT: NP NP BLRI 1L9, 1M22, ETC - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 24 MILES OF THE BLUE RIDGE PARKWAY (BLRI) BETWEEN MILEPOST (MP) 97 AND 121 IN BEDFORD, BOTETOURT, AND ROANOKE COUNTIES, VIRGINIA. THE WORK CONSISTS OF RE | Department of TransportationFederal Highway Administration | BEDFORD, VA-09 | $64,333,552.05 | Ends July 31, 2028 |
| 693C7325C000008NP NATR 3N18, 3H27, ETC - GEOTECHNICAL, PAVEMENT REHABILITATION, AND STRUCTURAL REPAIRS BETWEEN MP 121 AND MP 204 (PHASE 2), PROJECT MS NP NATR 3N18 3H27 ETC, SOLICITATION NUMBER 693C73-25-B-000003, LOCATED IN ATTALA, CHOCTAW, LEAKE, MADISON, AND WEB | Department of TransportationFederal Highway Administration | ETHEL, MS-02 | $32,592,743.94 | Ends June 10, 2027 |
| 693C7324C000009PROJECT NP NATR 3N17, 3H26, ETC. - THE PROJECT CONSISTS OF THE DRAINAGE IMPROVEMENTS OF THE NATCHEZ TRACE PARKWAY (NATR) FROM MILEPOST (MP) 121 TO MP 204 INCLUDING SOME PARKING AREAS. THE WORK CONSISTS OF DESIGN AND INSTALLATION OF DESIGNATED INLETS | Department of TransportationFederal Highway Administration | KOSCIUSKO, MS-02 | $23,064,070.64 | Ends January 31, 2028 |
| 693C7326F00007NPROJECT NC NP BLRI 2M30: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 342.7, 343.7 AND 343.8. THE WORK INCLUDES SLIDE REPAIRS, CULVERT REPLACEMENT AND CLEANING, STONE MASONRY HEADWALL INSTALLATION, RIPRAP PLACEMENT, CURB AND GUARDRAIL IN | Department of TransportationFederal Highway Administration | BURNSVILLE, NC-11 | $13,176,296.22 | Ends June 21, 2027 |
| 693C7326C000004PROJECT VA NP BLRI 1K1: THE PROJECT CONSISTS OF PAVEMENT REHABILITATION FROM MP 86 TO MP 89 ON THE BLUE RIDGE PARKWAY. THE WORK INCLUDES FULL DEPTH RECLAMATION, DRAINAGE IMPROVEMENT, SIGNAGE, AND OTHER MISCELLANEOUS WORK. | Department of TransportationFederal Highway Administration | BEDFORD, VA-09 | $5,975,688.62 | Ends January 29, 2027 |
| 693C7322F00109NPROJECT NP-BISC 10(2): THE PROJECT CONSISTS OF DESIGNING AND REHABILITATION/RECONSTRUCTION OF THE ROADWAY AND PARKING AREAS, PAVEMENT MARKING, DEVELOPMENT AND IMPLEMENTATION OF A TRAFFIC CONTROL PLAN, INSTALLATION OF EROSION AND SEDIMENT CONTROL MEA | Department of TransportationFederal Highway Administration | HIALEAH, FL-26 | $3,689,240.56 | Ends September 30, 2025 |
| 693C7326F00004NTN NP GRSM 11(6): THE PROJECT CONSISTS OF REPAIRING PAVEMENT EDGE DROP-OFFS, REMOVING OR PAVING GRAVEL PULL-OFF AREAS AND REPLACING TIMBER GUARDRAIL. THE WORK INCLUDES SHOULDER HARDENING, WHICH CONSISTS OF CONSTRUCTING A 2-FOOT WIDE ASPHALT PAVED SH | Department of TransportationFederal Highway Administration | GATLINBURG, TN-01 | $3,245,515.90 | Ends September 30, 2028 |
| 693C7325F00013NPROJECT TN ERFO FS 2019-1(2): THE PROJECT CONSISTS OF RECONSTRUCTING SINK MOUNTAIN LAUNCH ROAD AND CONSTRUCTING A NEW PARKING AREA. THE WORK INCLUDES CLEARING AND GRUBBING, EMBANKMENT CONSTRUCTION, ASPHALT PAVEMENT, REINFORCED CONCRETE BOX CULVERT I | Department of TransportationFederal Highway Administration | SHADY VALLEY, TN-01 | $3,181,074.58 | Ends May 26, 2026 |
| 693C7325F00010NPROJECT MS NP NATR 3P27: THE PROJECT CONSISTS OF MILLING AND OVERLAY OF MULTI-USE TRAILS, ASPHALT CONCRETE REHABILITATION, AGGREGATE SURFACING, MINOR TRAIL PROFILE ADJUSTMENTS, AND OTHER MISCELLANEOUS WORK. | Department of TransportationFederal Highway Administration | MADISON, MS-03 | $2,903,555.90 | Ends September 30, 2027 |
| 693C7326F00075NPROJECT TN ERFO FS CHRKE804 2021-1(2): THE PROJECT CONSISTS OF DESIGN SERVICES, SLOPE STABILIZATION, ROADWAY RECONSTRUCTION, ASPHALT CONCRETE PAVEMENT, AND OTHER MISCELLANEOUS WORK. | Department of TransportationFederal Highway Administration | RELIANCE, TN-03 | $2,835,371.94 | Ends January 17, 2028 |
| 693C7324F00088NPROJECT NP BLRI PVT PRES FY24(1): THE PROJECT CONSISTS OF PAVEMENT PRESERVATION ON THE BLUE RIDGE PARKWAY MAINLINE FROM MILEPOST 121 TO MILEPOST 143. THE WORK INCLUDES PLACEMENT OF CHIP SEAL AND FOG SEAL, PATCHING, CRACK CLEANING AND SEALING, PAVEME | Department of TransportationFederal Highway Administration | BENT MOUNTAIN, VA-09 | $2,423,182.46 | Ends May 8, 2026 |
Subcontracts it reported
A prime contractor reports the subcontracts it gives under an award (first-tier subawards). These are the largest it reported under its three largest awards, from every year of each award.
No subcontract is reported under this vendor’s largest awards.
Lobbying reports and campaign receipts that name this vendor
No lobbying report, organization page or FEC receipt in our saved records has this vendor’s name or its parent company’s name.
A name is matched only when it is the same name under the exact-name rule: letters and numbers alike, "&" read as "and", a leading "the" and one closing legal form (Inc, LLC, Corp, Corporation, Co, LP, LLP) set aside. A near name is never a match. Each match says which name matched.