KNIGHT CONST. & SUPPLY, INC
- Unique Entity ID (UEI)
- S6HKH3KV35N3
- Parent company
- KNIGHT CONST. & SUPPLY, INC (this vendor is its own parent)
- Registered address
- DEER PARK, WA, district WA-05
- Other names on record
- KNIGHT CONST. & SUPPLY INC.; KNIGHT CONST. & SUPPLY, INC.; KNIGHT CONSTRUCTION & SUPPLY I; KNIGHT CONSTRUCTION & SUPPLY INC; KNIGHT CONSTRUCTION AND SUPPLY INCORPORATED
Dollars are contract obligations in the fiscal year, as USAspending adds them up from each award's transactions. A contract's full value can be larger and run over several years. A figure below zero is money taken back from contracts signed earlier.
Source: USAspending.gov, the Treasury’s public record of federal spending. Our copy was saved November 19, 2026.
Which agencies pay this vendor, and where the work is done
Fiscal year 2027
USAspending lists no contract dollars for this vendor in fiscal year 2027 yet.
Fiscal year 2026: $63,402,774.81
| Agency | Contract dollars |
|---|---|
| Department of Defense | $63,402,774.81 |
| District where the work is done | Contract dollars |
|---|---|
| OR-02Cliff Bentz | $31,273,924.79 |
| ID-01Russ Fulcher | $21,473,992.02 |
| WA-05Michael Baumgartner | $10,654,858 |
Largest awards
The largest contract awards with activity from October 1, 2025 to September 30, 2027, by each award's total amount over its whole life. 0 rows of the answer belong to related companies and are left out.
| Award | Agency | Where the work is done | Award total | Start |
|---|---|---|---|---|
| W912EF22C0004MCNARY INTAKE GATES AND ISOPHSE BUS SYSTEMS | Department of DefenseDepartment of the Army | UMATILLA, OR-02 | $83,227,322.79 | Ends June 14, 2031 |
| W912EF24C0012LSR NAVLOCK TAINTER VALVES SYSTEM UPGRADES | Department of DefenseDepartment of the Army | DAYTON, WA-05 | $64,622,881 | Ends October 2, 2030 |
| W9127N19C0024MANUFACTURE AND DELIVER NEW CRANE | Department of DefenseDepartment of the Army | THE DALLES, OR-02 | $29,994,917 | Ends March 8, 2027 |
| W912DW26CA014DESCRIPTION OF WORK IN ACCORDANCE WITH THE ATTACHED SPECIFICATIONS AND PLANS. | Department of DefenseDepartment of the Army | OLDTOWN, ID-01 | $21,473,992.02 | Ends May 5, 2031 |
| W912EF26CA007ICE HARBOR DAM NAVIGATION LOCK UPSTREAM GATE FABRICATION | Department of DefenseDepartment of the Army | BURBANK, WA-05 | $3,857,861 | Ends July 15, 2027 |
| W912EF25F8001MNA SPILLWAY LIFT AUXILIARY BEAM (SLAB) | Department of DefenseDepartment of the Army | UMATILLA, OR-02 | $2,574,605 | Ends June 3, 2026 |
| W912EF25C0008MNA TURBINE MAINTENANCE PLATFORM | Department of DefenseDepartment of the Army | DEER PARK, WA-05 | $1,013,559 | Ends December 12, 2026 |
Subcontracts it reported
A prime contractor reports the subcontracts it gives under an award (first-tier subawards). These are the largest it reported under its three largest awards, from every year of each award.
Under award W912EF22C0004
| Subcontractor | What it is for, as reported | Amount | Date |
|---|---|---|---|
| INNOVATIVE HYDRAULICS LLC | PROVIDING CYCLINDERS | $11,396,300 | |
| KOONTZ ELECTRIC COMPANY, INCORPORATED | HIGH VOLTAGE ELECTRICAL WORK | $3,761,485 | |
| PIW TSG, LLC | HEAVY INDUSTRIAL MACHINING; GUIDE ROLLER, PINS, GATE CYLINDER SUPPORT AND ALIGNMENT BLOCKS | $2,588,758 | |
| FABRICATION PRODUCTS INC | SUPPLY MCNARY SUPPORT BEAMS, ASSEMBLIES AND PRODUCT TESTING. | $2,260,000 | |
| INNOVATIVE HYDRAULICS LLC | CYLINDER TESTING | $726,769 | |
| FARWEST CORROSION CONTROL CO | ANODE VERIFICATION TESTING | $240,542 | |
| UNI-SYSTEMS ENGINEERING, PC | FABRICATING SUPPORT BEAMS | $75,103 | |
| MADDOX INDUSTRIAL TRANSFORMER, LLC | ELECTRICAL COMPONENTS | $48,775 | |
| HASKINS STEEL CO INC | CYLINDER STORAGE STRUCTURE MATERIALS | $45,891.14 |
Under award W912EF24C0012
| Subcontractor | What it is for, as reported | Amount | Date |
|---|---|---|---|
| FABRICATION PRODUCTS INC | FABRICATE AND PROVIDE TAINTER VALVES | $11,532,871.21 | |
| ETS AUTOMATION, INC. | INDUSTRIAL CONTROLS SYSTEM | $4,491,855 | |
| FOSS MARITIME COMPANY, LLC. | VALVE OPERATING MACHINERY | $4,407,010 | |
| CR GUTTING INDUSTRIES LLC | VALVE OPERATING MACHINERY ASSEMBLIES | $1,244,691 | |
| DANFOSS, LLC | SUPPLY HYDRAULIC CYLINDERS AND PARTS. | $1,139,750.50 | |
| SEATTLE NUT AND BOLT LLC | SUPPLIER FOR FASTENERS, SUPPORT HARDWARE AND ACCESSORIES. | $68,408.07 |
Under award W9127N19C0024
| Subcontractor | What it is for, as reported | Amount | Date |
|---|---|---|---|
| WASHINGTON EQUIPMENT MANUFACTURING COMPANY, INC. | SUPPLY OF A 480 TON INTAKE GANTRY CRANE | $11,001,300 | |
| KOONTZ ELECTRIC COMPANY, INCORPORATED | HIGH VOLTAGE ELECTRICAL | $284,413 | |
| STONEWAY ELECTRIC SUPPLY CO | SUPPLY VISIONAIRE LIGHTING | $171,600 | |
| IRS ENVIRONMENTAL OF WASHINGTON, INC. | SURVEY FOR HAZARDOUS MATERIALS; ASBESTOS ABATEMENT, LEAD PAINT REMOVAL. | $103,095 | |
| MAXIM CRANE WORKS, L.P. | CRANE AND OPERATOR RENTAL. | $102,774.70 | |
| WESTINGHOUSE AIR BRAKE TECHNOLOGIES CORP | SUBCONTRACTOR WILL PROVIDE OCS WIRE OF OVER 50 FEET PER REEL. A SATISFACTORY OUT COME IS EXPECTED. | $79,600 | |
| I.S.S.C., INC. | SUPPLY STEEL; FABRICATE TUBE ANGLE BAR PLATE | $62,592 | |
| WASHINGTON EQUIPMENT MANUFACTURING COMPANY, INC. | CRANE 2 OVER 2 COLLECTOR | $56,617.21 | |
| MACON SUPPLY, INC. | GROUT AND MORTER SUPPLIES | $47,694.87 | |
| WASHINGTON EQUIPMENT MANUFACTURING COMPANY, INC. | SUPPLY AGREEMENT FOR ACCESS MODIFICATIONS AND FLEX CABLES FOR THE GANTRY CRANE. | $44,491 |
More subcontracts are reported under this award; the 10 largest are listed.
Lobbying reports and campaign receipts that name this vendor
No lobbying report, organization page or FEC receipt in our saved records has this vendor’s name or its parent company’s name.
A name is matched only when it is the same name under the exact-name rule: letters and numbers alike, "&" read as "and", a leading "the" and one closing legal form (Inc, LLC, Corp, Corporation, Co, LP, LLP) set aside. A near name is never a match. Each match says which name matched.