R.A. BURCH CONSTRUCTION CO., INC.
- Unique Entity ID (UEI)
- PBCXB1D4K1C9
- Parent company
- R.A. BURCH CONSTRUCTION CO., INC. (this vendor is its own parent)
- Registered address
- RAMONA, CA, district CA-48
- Other names on record
- BURCH R A CONSTRUCTION CO INC; BURCH R A CONSTRUCTION COMPANY INCORPORATED; R A BURCH CONSTRUCTION COMPAN; R.A. BURCH CONSTRUCTION CO. INC.; RA BURCH CONSTRUCTION CO INC; RA BURCH CONSTRUCTION COMPANY IN
Dollars are contract obligations in the fiscal year, as USAspending adds them up from each award's transactions. A contract's full value can be larger and run over several years. A figure below zero is money taken back from contracts signed earlier.
Source: USAspending.gov, the Treasury’s public record of federal spending. Our copy was saved November 19, 2026.
Which agencies pay this vendor, and where the work is done
Fiscal year 2027
USAspending lists no contract dollars for this vendor in fiscal year 2027 yet.
Fiscal year 2026: $69,781,704.32
| Agency | Contract dollars |
|---|---|
| Department of Defense | $69,781,704.32 |
| District where the work is done | Contract dollars |
|---|---|
| CA-50Scott H. Peters | $34,989,935.83 |
| CA-49Mike Levin | $29,345,240 |
| CA-23Jay Obernolte | $3,967,879.26 |
| CA-08John Garamendi | $888,969 |
| CA-52Juan Vargas | $419,213 |
| CA-26Julia Brownley | $170,467.23 |
Largest awards
The largest contract awards with activity from October 1, 2025 to September 30, 2027, by each award's total amount over its whole life. 0 rows of the answer belong to related companies and are left out.
| Award | Agency | Where the work is done | Award total | Start |
|---|---|---|---|---|
| N6247323F5203P-924, RANGE SIMULATION TRAINING & OPERATIONS FACILITY | Department of DefenseDepartment of the Navy | TWENTYNINE PALMS, CA-23 | $86,554,016 | Ends September 7, 2027 |
| N6247321F5351P510 - AERIAL PORT SQUADRON MATERIEL WAREHOUSE | Department of DefenseDepartment of the Navy | TRAVIS AFB, CA-08 | $68,253,724.88 | Ends July 21, 2024 |
| W912PL23C0004SIMS CENTER - COMPLETE | Department of DefenseDepartment of the Army | FORT IRWIN, CA-23 | $46,944,604.66 | Ends May 31, 2026 |
| N6247324F4063DB P2401 CHILD DEVELOPMENT CENTER, CPEN | Department of DefenseDepartment of the Navy | CAMP PENDLETON, CA-49 | $40,936,961.15 | Ends November 24, 2027 |
| N6247323F5360(DHA) ELEVATOR MODERNIZATION PROJECT, NMCSD | Department of DefenseDepartment of the Navy | SAN DIEGO, CA-52 | $38,847,143 | Ends June 11, 2027 |
| W912PL25CA019W81EYN52532630 | Department of DefenseDepartment of the Army | FORT IRWIN, CA-23 | $37,825,200 | Ends December 30, 2026 |
| N6247324F4887(CON TO) RM09-0333, RENOVATE POOR CONDITIONS UH PH-1519 | Department of DefenseDepartment of the Navy | PORT HUENEME CBC BASE, CA-26 | $35,994,977.23 | Ends August 14, 2026 |
| N6247323F5035X307 P636 - CHILD DEVELOPMENT CENTER LARGE FACILITY AT NAVAL BASE POINT LOMA, SAN DIEGO, CA | Department of DefenseDepartment of the Navy | SAN DIEGO, CA-50 | $35,313,150.68 | Ends October 6, 2026 |
| N6247326F0054THIS PROJECT INCLUDES REPAIR THROUGH REPLACEMENT OF B169 COMBAT TRAINING TANK AND B164 SUPPORT BUILDING IS LOCATED ON THE BAY SIDE OF NAVAL AMPHIBIOUS BASE, CORONADO, CA. | Department of DefenseDepartment of the Navy | SAN DIEGO, CA-50 | $29,920,980 | Ends February 15, 2028 |
| N6247326F0052PE2017M - REPAIR RECRUIT BARRACKS BLDG. 31614 AT MARINE CORPS BASE (MCB) CAMP PENDLETON, OCEANSIDE, CALIFORNIA | Department of DefenseDepartment of the Navy | CAMP PENDLETON, CA-49 | $29,261,176 | Ends December 30, 2027 |
| N6247319F4738P-1018 CONSTRUCTION OF FORKLIFT REWORK FACILITY, NAVAL BASE CORONADO, NASNI, SAN DIEGO, CA | Department of DefenseDepartment of the Navy | SAN DIEGO, CA-50 | $21,477,600.78 | Ends January 26, 2025 |
| N6247323F4080DB CONSTRUCTION MACC TO M2R2 PE15118M REPAIR/RENOVATE BEQ 210705 AT MCB CPEN | Department of DefenseDepartment of the Navy | CAMP PENDLETON, CA-49 | $21,236,998.13 | Ends June 15, 2026 |
| N6247323F4799(CON TO) DB - B1331 REPAIR ENLISTED DORMITORY | Department of DefenseDepartment of the Navy | TRAVIS AFB, CA-08 | $20,025,897.36 | Ends January 25, 2026 |
| N6247325F0121N62473-20-D-1126-N6247325F0121 NBPL-419 TRANSDEC RENOVATION CONSTRUCTION | Department of DefenseDepartment of the Navy | SAN DIEGO, CA-50 | $18,359,528.54 | Ends November 4, 2027 |
| N6247325F0593CONSTRUCT A NEW AMMUNITION STORAGE RC BOX AT TRAVIS AIR FORCE BASE. THIS FACILITY WILL BE DESIGNED FOR A 7-BAR, 5 SLIDING BLAST DOORS AND 5 STORAGE BAYS USING REINFORCED CONCRETE FOR THE SHELL. | Department of DefenseDepartment of the Navy | TRAVIS AFB, CA-08 | $16,471,888 | Ends March 15, 2027 |
| N6247324F4730OBLIGATE MINIMUM GUARANTEE | Department of DefenseDepartment of the Navy | SAN DIEGO, CA-50 | $0 | Ends June 12, 2029 |
Subcontracts it reported
A prime contractor reports the subcontracts it gives under an award (first-tier subawards). These are the largest it reported under its three largest awards, from every year of each award.
Under award N6247323F5203
| Subcontractor | What it is for, as reported | Amount | Date |
|---|---|---|---|
| PORGES ELECTRICAL GROUP INC | COMPLETE INSTALLATION OF ALL ELECTRICAL, COMMUNICATIONS, SECURITY SITE LIGHTING AND SITE COMMUNICATION AND SECURITY | $13,840,138 | |
| BURCH CONSTRUCTION CO INC | METAL FRAMING, AIR BARRIER SYSTEM, INSULATED WALL PANELS ASSEMBLIES, GYPSUM BOARD ACOUSTICAL CEILINGS, ACOUSTICAL WALL PANELS | $9,610,800 | |
| CHAPMAN AIR SYSTEMS, INC. | GENERAL SYSTEM REQUIREMENTS (AS APPLICABLE) AIR DISTIBUTION, HEATING & COOLING (AS APPLICABLE) EXHAUST SYSTEMS HVAC COMMISSIONING (PARTICIPATION ONLY) ALL LABOR, MATERIALS, AND EQUIPMENT NECESARY OR INCIDENTAL FOR COMPLETE INSTALLATION OF THE HVAC (MECHANICAL SYSTEMS - DRY) INSTALLATION OF DUCT SMOK | $6,820,752 | |
| PATRIOT ARC LLC | STRUCTURAL STEEL, STEEL DECKS, METAL STAIRS | $4,864,103 | |
| HUDSON P. DAVIS, INC. | FIRESTOPPING (FOR OWN SCOPE OF WORK) JOINT SEALANTS (FOR OWN SCOPE OF WORK) PLUMBING, GENERAL PURPOSE VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT TESTING, ADJUSTING AND BALANCING FOR HVAC(COORDINATION & SUPPORT) THERMAL INSULATION FOR MECHANICAL SYSTEMS (AS APPLIES) COMMISSIONING OF | $3,779,494 | |
| DEMCON CONCRETE CONTRACTORS INC | PROVIDE AND INSTALL CAST IN PLACE CONCRETE. | $2,708,187 | |
| VASQUEZ MARSHALL ARCHITECTS | ARCHITECT/ENGINEER ARCHITECTURAL DESIGN COORDINATION OF STRUCTURAL, CIVIL, ELECTRICAL, MECHANICAL,LANDSCAPE, FIRE PROTECTION INTERIOR DESIGNER, AUDIO VISUAL CONSULTANT AND IT ENGINEER. COORDINATE WITH LEED PROFESSIONAL AND 3RD PARTY CERTIFICATION REQUIREMENTS | $1,806,130 | |
| TECTA AMERICA CORP | POLYVINYL CHLORIDE ROOFING | $1,357,705 | |
| PERFORMANCE AUTOMATION SOLUTIONS, INC. | INSTRUMENTATION AND CONTROL FOR HVAC ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY OR INCIDENTAL FOR COMPLETE INSTALLATION OF A NEW INSTRUMENTATION AND CONTROL OF HVAC PROVIDE JCI METASYS BACNET DDC SYSTEM PER UFGS 23 09 00 AND UFGS 23 09 23.02 AND MCAS 29 PALMS AEG GUIDELINES | $1,270,470 | |
| ITZKO GLASS & METAL INC | ALUMINUM WINDOWS, CURTAIN WALL AND GLAZED ASSEMBLIES, GLAZING, ALUMINUM FRAMED ENTRANCES AND STOREFRONTS | $1,117,280 |
More subcontracts are reported under this award; the 10 largest are listed.
Under award N6247321F5351
| Subcontractor | What it is for, as reported | Amount | Date |
|---|---|---|---|
| LODIGE USA INC | MECHANIZED MATERIAL HANDLING SYSTEM | $22,774,111.50 | |
| LISTER CONSTRUCTION INC | CAST IN PLACE CONCRETE, EXCAVATION AND FILL, ASPHALT CONCRETE FOR VEHICULAR TRAFFIC | $7,140,119.79 | |
| J.B. STEEL, LLC | STRUCTURAL STEEL FOR PALLET RACKING | $4,227,410 | |
| MARTIN'S METAL FABRICATION & WELDING, INC | STRUCTURAL STEEL, METAL DECKING, MISCELLANEOUS METAL FABRICATIONS | $4,046,406.96 | |
| HELIX ELECTRIC, INC. | ELECTRICAL POWER/LIGHTING/FIRE PROTECTION | $3,373,522.22 | |
| DK ENTERPRISES, INC. | ROOFING | $2,096,813 | |
| CLAUSS CONSTRUCTION | DEMOLITION AND HAZARDOUS ABATEMENT | $1,250,024 | |
| MILLENNIUM FIRE PROTECTION CORPORATION | FIRE PROTECTION, WET-PIPE SPRINKLER SYSTEMS, STANDALONE FABRICATED FIRE PUMP HOUSE | $1,219,377 | |
| VASQUEZ MARSHALL ARCHITECTS | ARCHITECT | $731,973.41 | |
| AMERICAN EQUIPMENT SYSTEMS LLC | DESIGN, FURNISH, INSTALL AND FIELD LOAD TEST - ONE 50 TON CRANE | $621,750 |
More subcontracts are reported under this award; the 10 largest are listed.
Under award W912PL23C0004
| Subcontractor | What it is for, as reported | Amount | Date |
|---|---|---|---|
| PORGES ELECTRICAL GROUP INC | ELECTRICAL | $8,423,883.78 | |
| BURCH CONSTRUCTION CO INC | DRYWALL | $5,611,195 | |
| CHAPMAN AIR SYSTEMS, INC. | DRY MECHANICAL | $3,500,000 | |
| HUDSON P. DAVIS, INC. | PLUMBING/WET MECHANICAL | $2,433,170 | |
| GT COMMERCIAL CONCRETE, INC. | CAST-IN-PLACE CONCRETE (AS APPLIES TO SITE CONCRETE AGGREGATE BASE COURSES (AS APPLIES TO SITE CONCRETE CONCRETE CURBS, GUTTERS AND SIDEWALKS | $2,106,995 | |
| ADAMS & SMITH INC | STRUCTURAL STEEL (SHOP PRIMED/GALVANIZED AS REQUIRED) STEEL JOIST FRAMING STEEL DECKS MISCELLANEOUS METAL FABRICATION *8"DIAMETER PIPE BOLLARDS (12EA) (D8/C-505 FURNISH ONLY METAL RAILING *GUARDRAIL, FURNISH ONLY *HANDRAIL, FURNISH ONLY FURNISH ONLY FURNISH ONLY FURNISH ONLY FURNISH ONLY FURNISH ONL | $1,881,045.28 | |
| PRO STRUCTURAL INC | UNIT MASONRY | $1,451,825 | |
| COOLEY CONSTRUCTION, INC. | DEMOLITION, HAZMAT ABATEMENT | $1,374,265 | |
| CHALLENGER SHEET METAL, INC. | INSULATION, METAL WALL PANELS, COMPOSITE WALL | $1,367,039 | |
| CHALLENGER SHEET METAL, INC. | FLASHING & SHEET METAL | $1,367,039 |
More subcontracts are reported under this award; the 10 largest are listed.
Lobbying reports and campaign receipts that name this vendor
No lobbying report, organization page or FEC receipt in our saved records has this vendor’s name or its parent company’s name.
A name is matched only when it is the same name under the exact-name rule: letters and numbers alike, "&" read as "and", a leading "the" and one closing legal form (Inc, LLC, Corp, Corporation, Co, LP, LLP) set aside. A near name is never a match. Each match says which name matched.