Money · Federal contracts

VIGOR MARINE LLC

$50,000 in contract dollars, fiscal year 2027Confirmed from the official record
Unique Entity ID (UEI)
L7ZETMM4M9R3
Parent company
VIGOR INDUSTRIAL LLC (UEI V6JDW6UDK8J4)
Registered address
PORTLAND, OR, district OR-03
Other names on record
VIGOR MARINE; VIGOR MARINE LIMITED LIABILITY COMPANY

Dollars are contract obligations in the fiscal year, as USAspending adds them up from each award's transactions. A contract's full value can be larger and run over several years. A figure below zero is money taken back from contracts signed earlier.

Source: USAspending.gov, the Treasury’s public record of federal spending. Our copy was saved November 19, 2026.

The largest vendors

Which agencies pay this vendor, and where the work is done

Fiscal year 2027: $50,000

Contract dollars by awarding agency, Fiscal year 2027
AgencyContract dollars
Department of Homeland Security$50,000
Contract dollars by House district, Fiscal year 2027
District where the work is doneContract dollars
WA-07Pramila Jayapal$50,000

Fiscal year 2026: $724,277,859.17

Contract dollars by awarding agency, Fiscal year 2026
AgencyContract dollars
Department of Defense$688,724,589.64
Department of Homeland Security$34,003,297.16
Department of Transportation$1,549,972.37
Contract dollars by House district, Fiscal year 2026
District where the work is doneContract dollars
OR-03Maxine Dexter$606,474,907.29
WA-07Pramila Jayapal$120,089,340.61
DC-98Eleanor Holmes Norton$1,549,972.37
WA-02Rick Larsen-$3,836,361.10

Largest awards

The largest contract awards with activity from October 1, 2025 to September 30, 2027, by each award's total amount over its whole life. 0 rows of the answer belong to related companies and are left out.

Largest contract awards, by each award's total over its life
AwardAgencyWhere the work is doneAward totalStart
N0002419C4447USS CHOSIN USS CAPE ST GEORGEDepartment of DefenseDepartment of the NavySEATTLE, WA-07$443,725,248.51Ends October 28, 2024
N0002425C4402USS KIDD (DDG 100) FY25 DEPOT MODERNIZATION PERIODDepartment of DefenseDepartment of the NavySEATTLE, WA-07$275,862,726Ends August 3, 2026
N0002426C4411USS SAMPSON (DDG 102) FY26 DMPDepartment of DefenseDepartment of the NavyPORTLAND, OR-03$252,871,467Ends March 31, 2028
N4523A24C0551TYCOM BASE WORK ITEMSDepartment of DefenseDepartment of the NavyEVERETT, WA-02$217,043,891.93Ends October 16, 2025
N0002424C4407USS JOHN S MCCAIN (DDG 56) DSRADepartment of DefenseDepartment of the NavyPORTLAND, OR-03$101,843,216.75Ends April 17, 2026
N0002425C4409USS GABRIELLE GIFFORDS (LCS 10) FY25 DSRADepartment of DefenseDepartment of the NavyPORTLAND, OR-03$96,052,261.13Ends December 18, 2026
N3220526C0006USNS MERCY (T-AH 19) REGULAR OVERHAUL/DRY DOCKINGDepartment of DefenseDepartment of the NavyPORTLAND, OR-03$90,327,306.07Ends September 20, 2026
N3220526C1223USS EMORY S. LAND REGULAR OVERHAUL/DRY-DOCKING FY26Department of DefenseDepartment of the NavyPORTLAND, OR-03$84,924,626.37Ends December 13, 2026
N0002425C4420USS SAVANNAH (LCS 28) FY25 DSRADepartment of DefenseDepartment of the NavyPORTLAND, OR-03$65,828,462.58Ends May 21, 2027
N3220525C2148USNS GUADALUPE FISCAL YEAR 2025 REGULAR OVERHAUL AND DRY-DOCKING AVAILABILITYDepartment of DefenseDepartment of the NavyPORTLAND, OR-03$46,695,549.80Ends February 25, 2026
N3220526C1201USNS WASHINGTON CHAMBERS REGULAR OVERHAUL AND DRY DOCK.Department of DefenseDepartment of the NavyPORTLAND, OR-03$45,568,770.13Ends June 10, 2026
N3220525C4008USNS EARL WARREN (T-AO 208) POST SHAKEDOWN AVAILIBILTY FISCAL YEAR 25Department of DefenseDepartment of the NavyPORTLAND, OR-03$40,800,965.50Ends March 19, 2026
N3220525C4115USNS MATTHEW PERRY FISCAL YEAR 2025 REGULAR OVERHAUL AND DRY-DOCKING AVAILABILITYDepartment of DefenseDepartment of the NavyPORTLAND, OR-03$37,553,000.73Ends September 30, 2025
N3220525C4039USNS MATTHEW PERRY LAY BERTH AND SHIP REPAIRDepartment of DefenseDepartment of the NavyPORTLAND, OR-03$31,909,581.63Ends September 30, 2026
N3220526C1230USNS GUADALUPE MID-TERM AVAILABILITYDepartment of DefenseDepartment of the NavyPORTLAND, OR-03$21,317,446.72Ends December 3, 2026
70Z08526FLREP0018TASK ORDER ONE AWARD UNDER BASE CONTRACT FOR HEALY DRY DOCK FISCAL YEAR 2026.Department of Homeland SecurityU.S. Coast GuardPORTLAND, OR-03$18,819,367.50Ends July 3, 2026
70Z08526FLREP0067THIS TASK ORDER IS FOR THE CGC POLAR STAR FY26 DRY-DOCK REPAIR - ORDERING PERIOD 1.Department of Homeland SecurityU.S. Coast GuardPORTLAND, OR-03$10,536,050.80Ends September 30, 2026
W9127N25FA047YAQUINA SHIPYARD OVERHAUL FY26Department of DefenseDepartment of the ArmyPORTLAND, OR-03$5,900,946.61Ends March 13, 2026
693JF724F00112NTO FUND MDA VESSEL LAYBERTHING BRIDGE CONTRACT 693JF724D000007Department of TransportationMaritime AdministrationWASHINGTON, DC-98$2,938,497.51Ends June 19, 2026
70Z08526FLREP0111NEW TASK ORDER TO INCORPORATE THE FOLLOWING CHANGE REQUESTS (CRS) INTO THE CONTRACT: 044, 045, 046, 047, 049, 050, 051, 052, 053, 054, 055, 057, 058, AND 059.Department of Homeland SecurityU.S. Coast GuardSEATTLE, WA-07$1,055,277Ends September 30, 2026
70Z08526FLREP0122TASK ORDER TO INCORPORATE THE FOLLOWING CHANGE REQUESTS (CRS) INTO USCGC POLAR STAR FY26 DD REPAIRS: 036, 037, 056, 060, 065, 067, 069, 070, 071, 072, 073, 075, 078, 079, 080, 081, 082, 083, AND 084.Department of Homeland SecurityU.S. Coast GuardSEATTLE, WA-07$1,046,923Ends September 30, 2026
70Z08526FLREP0125NEW TASK ORDER TO INCORPORATE CR-048 INTO USCGC POLAR STAR FY26 DD REPAIRSDepartment of Homeland SecurityU.S. Coast GuardSEATTLE, WA-07$973,084Ends October 24, 2026
693JF726F00034NLAYBERTH CONTRACT AND SERVICES FOR PACIFIC TRACKER AND PACIFIC COLLECTOR AT PORTLAND, ORDepartment of TransportationMaritime AdministrationWASHINGTON, DC-98$740,232.37Ends June 19, 2031
70Z08526FLREP0136TO ADD CRS 061, 062, 063, 064, 066, 068, 076, 077, 085, 086, 088, 090, 091, 092, 094 AND 095 TO MIDGETT FY26 DS REPAIRS. CR-64 ACTIVATE WI-39.Department of Homeland SecurityU.S. Coast GuardSEATTLE, WA-07$580,378Ends December 1, 2026
70Z08526FLREP0092THE PURPOSE OF THIS TASK ORDER IS TO INCORPORATE THE FOLLOWING CHANGE REQUESTS (CRS) INTO THE CONTRACT: CRS 1, 2, 3, 5, 6, 8, 10 , & 12.Department of Homeland SecurityU.S. Coast GuardPORTLAND, OR-03$530,600.86Ends September 30, 2026
70Z08526FLREP0107TASK ORDER TO INCORPORATE THE FOLLOWING CHANGE REQUEST (CRS) INTO THE CONTRACT: 14, 16, 17, 21, 22, 26, 30, 31, 32, 38, 39, 40, 41, AND 42.Department of Homeland SecurityU.S. Coast GuardSEATTLE, WA-07$313,043Ends September 30, 2026
70Z08526FLREP0101TASK ORDER TO INCORPORATE THE FOLLOWING CHANGE REQUESTS (CRS) INTO THE CONTRACT: 07, 09, 11, 13, 15, 18, 19, 20, 23, 24, 25, 27, 28, 33, AND 35Department of Homeland SecurityU.S. Coast GuardSEATTLE, WA-07$195,813Ends September 30, 2026
70Z08526PSEAT0023DISTILLED WATER FOR CGC HEALY'S BOILERS. CRITICAL FOR MISSION OPERATIONAL READINESS.Department of Homeland SecurityU.S. Coast GuardSEATTLE, WA-07$2,760Ends June 9, 2026
W912CH26FA069START OF WORK MEETINGDepartment of DefenseDepartment of the ArmyPORTLAND, OR-03$1,000Ends March 15, 2026

Subcontracts it reported

A prime contractor reports the subcontracts it gives under an award (first-tier subawards). These are the largest it reported under its three largest awards, from every year of each award.

Under award N0002419C4447

Subcontracts reported under award N0002419C4447
SubcontractorWhat it is for, as reportedAmountDate
TIMKEN GEARS & SERVICES INC.ACCOMPLISH THE REQUIREMENTS OF WI 311-30-500 RCC 137N GAS TURBINE GENERATOR (GTG) REDUCTION GEAR FLUSH; ACCOMPLISH; PARAGRAPH 3.3 PER THE WORK SCOPE DESCRIBED IN SUBMITTAL 137271 DATED 4/3/2020. TO INCLUDE LABOR, MATERIALS, SUPERVISION, QA AND SCHEDULING OF WORK INPUTS TO THE MASTER SCHEDULE.$830,166,257
IMIA, LLC110-11-003 STRUCTURAL REPAIR AND PRESERVATION (MMR1); ACCOMPLISH, 110-11-004 STRUCTURAL REPAIR AND PRESERVATION (MMR2, 110-11-005 STRUCTURAL REPAIR AND PRESERVATION (AMR1, 110-11-006 STRUCTURAL REPAIR AND PRESERVATION (AMR2), 110-11-007 STRUCTURAL REPAIR AND PRESERVATION (GEN ROOM NO 3, 110-11-008 S$9,973,701
JAG WELDING, FAB, & SERVICES, INCACCOMPLISH 130-11-001 FLIGHT DECK; REPAIR PARA. 3.1 009-09 PCP CREATION PARA. 3.2 - 3.6.1 INSTALLATION OF TIE DOWNS PERIOD OF PERFORMANCE - UPON AWARD TO 04/22/2022 IAW JAG SUBMITTAL RECEIVED 01/25/2021 REPLACES PO 178956$7,238,996.55
JAG WELDING, FAB, & SERVICES, INCACCOMPLISH 130-11-001 FLIGHT DECK; REPAIR PARA. 3.1 009-09 PCP CREATION PARA. 3.2 - 3.6.1 INSTALLATION OF TIE DOWNS PERIOD OF PERFORMANCE - UPON AWARD TO 04/22/2022 IAW JAG SUBMITTAL RECEIVED 01/25/2021$7,129,281.70
JAG INDUSTRIAL SERVICES, INCACCOMPLISH 130-11-001 FLIGHT DECK; REPAIR PARA. 3.1 009-09 PCP CREATION PARA. 3.2 - 3.6.1 INSTALLATION OF TIE DOWNS PERIOD OF PERFORMANCE - UPON AWARD TO 04/22/2022 IAW JAG SUBMITTAL RECEIVED 01/25/2021$6,907,172
TRIDENT MARITIME SYSTEMS, INC.WI 110-90-002 SHIPALT CG47-82409K, ADVANCED FOOD SERVICE; ACCOMPLISH - TRIDENT LLC / US JOINER DIVISION TO ACCOMPLISH PARA'S: 3.2 (2.2 - 2.19, 2.21) - 3.2.2, 3.4- 3.7.1, 3.10, 3.14-3.14.2 ASSIST. (LESS ABATEMENT, INSULATION, STAGING, CONTAINMENT, DECKING, DECK COVERING, NON-SKID, ONBOARD PAINTING, O$5,838,613
SOUTHCOAST WELDING & MANUFACTURING, LLC.150-90-501 RCC 168N SHIPALT CG47-83506.06K, SUPERSTRUCTURE FATIGUE AND SENSITIZATION MODIFICATIONS (AFT); ACCOMPLISH - PARA'S 3.1 THRU 3.1.1, 3.3 THRU 3.4.1, 3.6 THRU 3.9 REF 2.5 & 2.21, 3.9.1, 3.12 & 3.17 THRU 3.17.2 PER VIGOR€™S RFQ AND ATTACHED SUPPLIER€™S PRICING PROPOSAL , IN ACCORDANCE WITH$5,519,191.99
IMIA, LLC150-90-501 168N SHIPALT CG47-83506.06K, SUPERSTRUCTURE FATIGUE AND SENSITIZATION MODIFICATIONS (AFT); ACCOMPLISH. ACCOMPLISH 009-32 OF ALL REF DWG AND 3.14, 3.15.2-3.15.3, 3.18 PER VIGOR€™S RFQ AND ATTACHED SUPPLIER€™S PRICING PROPOSAL , IN ACCORDANCE WITH THE REQUIREMENTS SPECIFIED IN WORK IT$4,722,354
IMIA, LLCACCOMPLISH 123-11-005 COMPENSATED FUEL TANK GROUP 3 AND 4; PRESERVE (TOUCH UP) PARA'S 3.1 - 3.4, INCL TLI$4,581,505
SOUTHCOAST WELDING & MANUFACTURING, LLC.150-11-002 NAVIGATION LIGHT FOUNDATION; REPAIR - PARA'S PARA 3.1, REF'S 2.2, 2.3 PER ATTACHED SUPPLIER€™S PRICING PROPOSAL , IN ACCORDANCE WITH THE REQUIREMENTS SPECIFIED IN WORK ITEM 150-11-002, 150-90-001,150-90-002,150-90-004,150-90-005,167-90-001,168-11-003,168-90-002, 251-32-001,415-90-002,4$4,100,074.70

More subcontracts are reported under this award; the 10 largest are listed.

Under award N0002425C4402

Subcontracts reported under award N0002425C4402
SubcontractorWhat it is for, as reportedAmountDate
JAG WELDING, FAB, & SERVICES, INC"167-11-001 STRUCTURAL DOOR; REPLACE (OPTION ITEM) PARAGRAPHS: ALL (EXCEPT 3.1.6 - POWDER COAT)"$22,929,315.76
IMIA, LLC"116-11-001 STEERING GEAR RM VERTICAL KEEL AND SHELL IMIA - PAINT: 3.1, 3.5 "$13,126,298
IMIA, LLC"116-11-001 STEERING GEAR RM VERTICAL KEEL AND SHELL IMIA - PAINT: 3.1, 3.5 "$12,439,148
WASHINGTON MARINE CLEANING LLC"WORK ITEM 110-11-001, UNDERWATER HULL; INSPECT AND REPAIR (OPTION ITEM) PARAGRAPH 3.1 - 3.1.1"$8,305,033.75
IMIA, LLC"110-11-001 UNDERWATER HULL; INSPECT AND REPAIR FRONT LOAD IMIA STRUC: 3.6-3.8 "$7,566,281
DELPHINUS ENGINEERING LLCWORK ITEM 637-11-001 TRASH DISPOSAL ROOM SHEATHING; REPLACE (SUPPLEMENTAL PKG - OPTION ITEM)$7,289,678.48
JAG WELDING, FAB, & SERVICES, INCWORK ITEM: 259-10-002, RCC 226G, PARAGRAPHS 3.6.2 AND 3.6.3 - ENGINE ROOM NUMBER 2 GAS TURBINE UPTAKE; REPAIR (OPTION ITEM) – ACCOMPLISH THE REQUIREMENTS OF PARAGRAPHS LISTED ABOVE, (SEE NOTE 4.5)$5,710,403
BENDER CCP, INC."234-10-001 GAS TURBINE MAIN (GTM) ENGINE FLEXIBLE HOSE ASSEMBLY; REPLACE "$5,516,189.72
JAG WELDING, FAB, & SERVICES, INC"167-11-001 STRUCTURAL DOOR; REPLACE (OPTION ITEM) PARAGRAPHS: ALL (EXCEPT 3.1.6 - POWDER COAT)"$4,376,379
MARISCO, LTD.243-11-001 STARBOARD STERN TUBE SHAFT SEAL; OVERHAUL (OPTION ITEM)$4,204,891.40

More subcontracts are reported under this award; the 10 largest are listed.

Under award N0002426C4411

Subcontracts reported under award N0002426C4411
SubcontractorWhat it is for, as reportedAmountDate
TECNICO CORPORATION"SHIPALT DDG51-81670D, OFFICER BERTHING INCREASE; ACCOMPLISH 641-80-001 PARAGRAPHS 3.1 - 3.15 GENERAL EXCEPTIONS DOCUMENT RECEIVED"$10,984,168
IMIA, LLC"FRONT LOAD - COMPENSATED FUEL TANK GROUP ONE; REPAIR 123-11-001 PARAGRAPHS: 3.2-3.2.4"$6,412,740
WASHINGTON MARINE CLEANING LLC"UNDERWATER HULL; INSPECT AND REPAIR 110-11-001A PARAGRAPHS: 3.1 - 3.1.1, 3.2.1"$6,060,501
IMIA, LLC"DRAIN WELL; REPAIR 113-11-001 PARAGRAPHS: 3.6, 3.11, 3.18"$4,293,930
MARISCO, LTD."STARBOARD WATERBORNE PROPULSION SHAFTING REPLACEMENT; ACCOMPLISH 243-11-001 PARAGRAPHS: 3.1-3.2.1, 3.2.4-3.8.3, 3.11.3-3.12.1, 3.12.3-3.12.4, 3.13-3.13.2, 3.14.1-3.14.5.1, 3.15-3.16.2"$4,164,478
PERFORMANCE CONTRACTING INC"ENGINE ROOM NUMBER 2 STRUCTURE; REPAIR 123-41-004 PARAGRAPHS: 3.5-3.5.1, 3.5.3"$4,041,305
AMP UNITED LLC"DDG51 CLASS AER 95870, BRIDGE WINDOW FRAME REPLACEMENT; ACCOMPLISH 150-80-001 PARAGRAPHS: 3.4 - 3.5, 3.7"$3,924,704
BENDER CCP, INC."NUMBER 2 AND NUMBER 4 CENTRALIZED SEAWATER COOLING PUMP CLASS B OVERHAUL; ACCOMPLISH 256-70-001 PARAGRAPHS: 3.2 - 3.2.5, 3.3 - 3.9"$3,032,890.77
POSEIDON INDUSTRIAL LLC"SURFACE ELECTRONIC WARFARE IMPROVEMENT PROGRAM (SEWIP) BLOCK 3 HARDWARE UPGRADE; ACCOMPLISH (E1) SHIPALT DDG51-79521K, AN/SLQ-32 (V)7 PARAGRAPHS: 3.6, 3.6.1 - 3.6.4.1, 3.6.9, 3.8, 3.33, 3.33.2 - 3.33.23, 3.43, 3.51"$2,951,472
MACDONALD-MILLER FACILITY SOLUTIONS LLC"SHIPALT DDG51-92394K, STRUCTURAL MODIFICATIONS TO MITIGATE CRACKING AT FRAME 106; ACCOMPLISH 130-90-001 PARAGRAPHS: (3.1, 2.4, 2.9) 3.1.1, 3.2"$2,809,505

More subcontracts are reported under this award; the 10 largest are listed.

Lobbying reports and campaign receipts that name this vendor

No lobbying report, organization page or FEC receipt in our saved records has this vendor’s name or its parent company’s name.

A name is matched only when it is the same name under the exact-name rule: letters and numbers alike, "&" read as "and", a leading "the" and one closing legal form (Inc, LLC, Corp, Corporation, Co, LP, LLP) set aside. A near name is never a match. Each match says which name matched.

Suggest a tool

Suggest a tool

A person reads each idea before it appears. Links are not accepted. Do not include personal information.

See all ideas and vote