CENTRAL SOUTHERN CONSTRUCTION CORP.
- Unique Entity ID (UEI)
- GKU1XRD7BCX7
- Parent company
- CENTRAL SOUTHERN CONSTRUCTION CORP. (this vendor is its own parent)
- Registered address
- JACKSONVILLE, FL, district FL-04
- Other names on record
- CENTRAL SOUTHERN CONSTRUCTION CORP
Dollars are contract obligations in the fiscal year, as USAspending adds them up from each award's transactions. A contract's full value can be larger and run over several years. A figure below zero is money taken back from contracts signed earlier.
Source: USAspending.gov, the Treasury’s public record of federal spending. Our copy was saved November 17, 2026.
Which agencies pay this vendor, and where the work is done
Fiscal year 2027
USAspending lists no contract dollars for this vendor in fiscal year 2027 yet.
Fiscal year 2026: $14,911,707.61
| Agency | Contract dollars |
|---|---|
| Department of Transportation | $14,911,707.61 |
| District where the work is done | Contract dollars |
|---|---|
| TX-13Ronny Jackson | $10,492,605 |
| IN-01Frank J. Mrvan | $4,775,722.15 |
| NC-11Chuck Edwards | $1,140,123.50 |
| VA-10Suhas Subramanyam | $150,000 |
| MS-04Mike Ezell | $148,750 |
| DC-98Eleanor Holmes Norton | $146,480.76 |
| FL-01Jimmy Patronis | $0 |
| MS-02Bennie G. Thompson | $0 |
| FL-05John H. Rutherford | $0 |
| GA-01Earl L. "Buddy" Carter | $0 |
| GA-14Clay Fuller | $0 |
| MI-01Jack Bergman | $0 |
| NC-14Tim Moore | -$1,941,973.80 |
Largest awards
The largest contract awards with activity from October 1, 2025 to September 30, 2027, by each award's total amount over its whole life. 0 rows of the answer belong to related companies and are left out.
| Award | Agency | Where the work is done | Award total | Start |
|---|---|---|---|---|
| 693C7325F00023NPROJECT NC ERFO NP BLRI 2024-1(1): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES TWO SLIDE REPAIRS WITH REINFORCED SOIL SLOPE (RSS), DEEP PATCH, MINIMAL TREE REMOVAL FOR ACCESS, DITC | Department of TransportationFederal Highway Administration | ASHEVILLE, NC-11 | $14,661,421 | Ends December 31, 2027 |
| 69056726F00009NFUNDS CONSTRUCTION PROJECT TX NP MULTI PMS(1) ), PAVEMENT PRESERVATION TEXAS. THIS WORK CONSISTS OF CRACK SEALING, PATCHING, APPLICATION OF CHIP SEAL AND MICRO SURFACE TREATMENTS AND PAVEMENT MARKING. | Department of TransportationFederal Highway Administration | FRITCH, TX-13 | $10,492,605 | Ends September 3, 2026 |
| 693C7325C000012MS NP GUIS 15(4) THIS PROJECT CONSISTS OF THE CONSTRUCTION OF PAVED SHOULDERS, BOARDWALKS, CULVERT REPLACEMENT, AND GUARDRAIL REPLACEMENT. THE WORK INCLUDES THE INSTALLATION OF A BOTTOMLESS BOX CULVERT, GRADING, PAVING SHOULDERS, MICROSURFACING AND | Department of TransportationFederal Highway Administration | OCEAN SPRINGS, MS-04 | $9,271,935 | Ends January 14, 2028 |
| 693C7325C000007PROJECT MS ERFO NPS VICK 2020-1(2) THE PROJECT CONSISTS OF SLIDE REPAIRS ON GRANT AVENUE AND UNION AVENUE. THE WORK INCLUDES CLEARING AND GRUBBING, ROADWAY EXCAVATION AND EMBANKMENT CONSTRUCTION, GEOGRID, GABIONS, AGGREGATE BASE, MECHANICALLY COMPAC | Department of TransportationFederal Highway Administration | VICKSBURG, MS-02 | $8,933,610 | Ends March 31, 2028 |
| 693C7325C000014PROJECT DC NP ROCR 503(1), 24(2) THE PROJECT CONSISTS OF ROADWAY REPAIRS ON WATERSIDE DRIVE FROM THE SOUTHERN INTERSECTION WITH ROCK CREEK AND POTOMAC PARKWAY TO MASSACHUSETTS AVENUE NW, AND PINEY BRANCH PARKWAY FROM ARKANSAS AVENUE TO BEACH DRIVE | Department of TransportationFederal Highway Administration | WASHINGTON, DC-98 | $7,927,035.76 | Ends February 16, 2027 |
| 693C7325F00075NPROJECT NC ERFO NP BLRI 2024-1(5) THE PROJECT CONSISTS OF SLIDE REPAIRS, CULVERT REPLACEMENT, STONE MASONRY HEADWALL REPAIR, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK. | Department of TransportationFederal Highway Administration | MARION, NC-11 | $6,637,923.50 | Ends July 31, 2028 |
| 693C7325F00025NPROJECT NC ERFO NP BLRI 2024-1(3): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN | Department of TransportationFederal Highway Administration | BLACK MOUNTAIN, NC-14 | $4,866,161.20 | Ends November 30, 2027 |
| 69056726F00025NCONSTRUCTION SERVICES FOR PROJECT IN NP INDU PMS(1), PAVEMENT PRESERVATION INDIANA DUNES. THIS WORK CONSISTS OF CRACK SEALING, PATCHING, APPLICATION OF CHIP SEAL AND MICRO SURFACE TREATMENTS AND PAVEMENT MARKING. | Department of TransportationFederal Highway Administration | CHESTERTON, IN-01 | $4,775,722.15 | Ends July 24, 2026 |
| 693C7325F00085NPROJECT NC ERFO NP BLRI 2024-1(6) THE PROJECT CONSISTS OF SLIDE REPAIRS, GUARDRAIL REPLACEMENT, REPLACEMENT AND/OR CLEANING OF CULVERTS, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK. | Department of TransportationFederal Highway Administration | MARION, NC-11 | $4,309,500 | Ends June 30, 2028 |
| 693C7324F00045NPROJECT NP SLBE 5109(1): THE PROJECT CONSISTS OF CONSTRUCTING LEFT AND RIGHT TURNING LANES ON SOUTH DUNE HIGHWAY (M-109) AT DUNE CLIMB PARKING AREA (ROUTE 920). THE WORK INCLUDES GRADING; AGGREGATE BASE; ASPHALT PAVEMENT MILLING; CONCRETE PAVING; MS | Department of TransportationFederal Highway Administration | EMPIRE, MI-01 | $2,592,162.81 | Ends December 2, 2025 |
| 693C7321F000087FL ERFO NPS GUIS 2020-1(1) THE PROJECT CONSISTS OF THE REPAIR STORM DAMAGE ON J. EARLE BOWDEN WAY, FORT PICKENS ROAD, JOHNSON BEACH ROAD, AND BEACH PARKING #6 WITHIN THE GULF ISLANDS NATIONAL SEASHORE, FLORIDA DISTRICT. THE WORK INCLUDES ASPHALT PA | Department of TransportationFederal Highway Administration | PENSACOLA, FL-01 | $2,534,155.95 | Ends September 30, 2023 |
| 693C7325F00021NNC ERFO NP BLRI 2024-1(2): THE PROJECT CONSISTS OF STABILIZING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES STABILIZING AN EMBANKMENT WITH NC DOT SHOT ROCK, INSTALLING GEOMEMBRANE WITH SANDBAGS, PLACING BARRIERS TO | Department of TransportationFederal Highway Administration | LINVILLE, NC-11 | $2,279,350 | Ends October 31, 2027 |
| 693C7325F00093NGA NP CHCH MULTI (2): THE PROJECT CONSISTS OF THE REHABILITATION OF 0.44 MILES OF SNODGRASS ROAD AND 0.76 MILES OF DYER ROAD, INCLUDING PARKING AREAS AND PULL-OFFS. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL, ROADBED RECONDITIONING, GRADING, AGGREG | Department of TransportationFederal Highway Administration | FORT OGLETHORPE, GA-14 | $1,843,125 | Ends May 31, 2028 |
| 693C7325F00008NPROJECT NP SER PMS FY24(3): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS INCLUDING PARKING AREAS. THE WORK INCLUDES THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, SAMI, FULL DEPTH PATCHING, AND OTHER MISCELLANEOUS WORK. | Department of TransportationFederal Highway Administration | BLOOMINGDALE, GA-01 | $1,703,080 | Ends March 31, 2028 |
| 693C7325F00007NPROJECT NP SER PMS FY24(2): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS INCLUDING PARKING AREAS. THE WORK INCLUDES THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, SAMI, FULL DEPTH PATCHING, AND OTHER MISCELLANEOUS WORK. | Department of TransportationFederal Highway Administration | SAINT AUGUSTINE, FL-05 | $1,582,756 | Ends January 31, 2028 |
| 693C7319C000003SOEN: EMERGENCY REPAIR STORM-DAMAGED ON FORT PICKERNS ROAD AND J.E. BOWDEN WAY LOCATED IN GULF ISLAND NATIONAL SEASHORE AND ESCAMBIA COUNTY, FLORIDA. | Department of TransportationFederal Highway Administration | PENSACOLA, FL-01 | $910,000 | Ends June 22, 2020 |
| 693C7325F00055NPROJECT NC ERFO FS NFNC811 2020-1(1): THE PROJECT CONSISTS OF THE REPAIR OF A FILL SLOPE FAILURE ON TUNI GAP ROAD (RTE 440). THE WORK INCLUDES GRADING, DRAINAGE, GEOFOAM LIGHTWEIGHT FILL EMBANKMENT, AGGREGATE SURFACE COURSE, AND OTHER MISCELLANEOU | Department of TransportationFederal Highway Administration | BRASSTOWN, NC-11 | $662,370 | Ends February 28, 2027 |
| 693C7325F00080NPROJECT NC ERFO NP BLRI 2024-1(7) THE PROJECT CONSISTS OF SLIDE REPAIRS, GUARDRAIL REPLACEMENT, REPLACEMENT AND/OR CLEANING OF CULVERTS, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK. | Department of TransportationFederal Highway Administration | SPRUCE PINE, NC-11 | $477,370 | Ends May 31, 2027 |
| 693C7326P000005PROJECT - VA NP GWMP MVT(4) - STIPEND FEE FOR UNSUCCESSFUL FIRM | Department of TransportationFederal Highway Administration | ASHBURN, VA-10 | $150,000 | Ends February 27, 2026 |
Subcontracts it reported
A prime contractor reports the subcontracts it gives under an award (first-tier subawards). These are the largest it reported under its three largest awards, from every year of each award.
Under award 693C7325C000012
| Subcontractor | What it is for, as reported | Amount | Date |
|---|---|---|---|
| HUEY P STOCKSTILL LLC | SUPPLIER HMA ST 9.5MM | $49,343.75 |
Lobbying reports and campaign receipts that name this vendor
No lobbying report, organization page or FEC receipt in our saved records has this vendor’s name or its parent company’s name.
A name is matched only when it is the same name under the exact-name rule: letters and numbers alike, "&" read as "and", a leading "the" and one closing legal form (Inc, LLC, Corp, Corporation, Co, LP, LLP) set aside. A near name is never a match. Each match says which name matched.