Money · Federal contracts

MICHIGAN TECHNOLOGICAL UNIVERSITY

$10,613,369 in contract dollars, fiscal year 2026Confirmed from the official record
Unique Entity ID (UEI)
GKMSN3DA6P91
Parent company
MICHIGAN TECHNOLOGICAL UNIVERSITY (this vendor is its own parent)
Registered address
HOUGHTON, MI, district MI-01
Other names on record
MICH TECHNOLOGICAL UNIV; MICHIGAN TECH UNIV; MICHIGAN TECH UNIVERSITY; MICHIGAN TECHNOLOGICAL UNIV; MICHIGAN TECHNOLOGICAL UNIVERS; MICHIGAN TECHNOLOGICAL UNIVERSITY (INC); MICHIGAN TECHNOLOGICAL UNIVERSITY I

Dollars are contract obligations in the fiscal year, as USAspending adds them up from each award's transactions. A contract's full value can be larger and run over several years. A figure below zero is money taken back from contracts signed earlier.

Source: USAspending.gov, the Treasury’s public record of federal spending. Our copy was saved November 19, 2026.

The largest vendors

Which agencies pay this vendor, and where the work is done

Fiscal year 2027

USAspending lists no contract dollars for this vendor in fiscal year 2027 yet.

Fiscal year 2026: $10,613,369

Contract dollars by awarding agency, Fiscal year 2026
AgencyContract dollars
Department of Defense$10,613,369
Department of Transportation$0
Department of Homeland Security$0
Department of Health and Human Services$0
Contract dollars by House district, Fiscal year 2026
District where the work is doneContract dollars
MI-01Jack Bergman$10,583,369
MI-06Debbie Dingell$30,000

Largest awards

The largest contract awards with activity from October 1, 2025 to September 30, 2027, by each award's total amount over its whole life. 0 rows of the answer belong to related companies and are left out.

Largest contract awards, by each award's total over its life
AwardAgencyWhere the work is doneAward totalStart
W56HZV19C0053NEW FOLLOW-ON CONTRACT EFFORT: THE WORK DIRECTIVES ISSUED HEREUNDER SHALL INVOLVE RESEARCH AND DEVELOPMENT EFFORTS ON VARIOUS ASPECTS RELATED TO SURVIVABILITY, ASSURED MOBILITY, AND MANEUVER SUPPORT MATERIAL SOLUTIONS.Department of DefenseDepartment of the ArmyHOUGHTON, MI-01$31,126,406.22Ends January 30, 2026
W912CH24C0038TECHNICAL AND ENGINEERING SERVICES SUPPORT FOR ASSURED MOBILITY, SURVIVABILITY, AND MANEUVER SUPPORT MATERIAL SOLUTIONS FOR THE GROUND VEHICLE SYSTEMS CENTER GROUND VEHICLE SURVIVABILITY AND PROTECTION DIRECTORATEDepartment of DefenseDepartment of the ArmyHOUGHTON, MI-01$28,412,998.68Ends September 30, 2027
FA239424CB014COMPUTATIONALLY-DRIVEN NEXT GENERATION CARBON-CARBON COMPOSITE MATERIAL DEVELOPMENTDepartment of DefenseDepartment of the Air ForceHOUGHTON, MI-01$4,438,800Ends May 28, 2027
HR001124C0339DDARPA TRIAGE CHALLENGE (DTC) UNDER THE SIGNATURES OF TRAUMA FOR ALGORITHM-ASSISTED CLINICAL ASSESSMENT, TRIAGE, AND OBSERVATION (STACATO) PROGRAMDepartment of DefenseDefense Advanced Research Projects AgencyHOUGHTON, MI-01$1,747,579Ends December 15, 2026
FA875024CB074SUDOKUDepartment of DefenseDepartment of the Air ForceANN ARBOR, MI-06$1,052,526Ends June 29, 2027
W912HZ23C0022BAA 22-0014A WITH MICHIGAN TECHNOLOGICAL UNIVERSITY FOR R&D PROPOSAL SAR SIGNATURE MANAGEMENT. U438170Department of DefenseDepartment of the ArmyHOUGHTON, MI-01$800,000Ends May 21, 2028
W912CG24C0017OPFOR HIERARCHICAL AL FOR FIELD EXERCISES AND TRAINING DEMONSTRATIONS.Department of DefenseDepartment of the ArmyHOUGHTON, MI-01$639,790Ends March 21, 2027
N0001426C1117THIS PROJECT PROPOSES TO BRING TOGETHER MODERN GENERATIVE AI METHODS WITH EXPERT MODELS TO CREATE KINEMATIC AND RF BEHAVIOR SIMULATIONS FOR COMPLEX MARITIME SURFACE VESSEL ENGAGEMENTS AT LARGE SCALES.Department of DefenseDepartment of the NavyHOUGHTON, MI-01$500,000Ends March 23, 2028
693JJ622C000001WELD ENHANCED CAST STEEL COUPLER KNUCKLESDepartment of TransportationFederal Railroad AdministrationHOUGHTON, MI-01$500,000Ends December 27, 2025
693JJ622C000006ACQUISITION DESCRIPTION: A RISK INFORMED DECISION-MAKING FRAMEWORK FOR COASTAL RAILROAD SYSTEM SUBJECTED TO STORM HAZARDS AND SEA LEVEL RISE. IDENTIFY AND EVALUATE MITIGATION STRATEGIES FOR LIMITING IMPACT OF CLIMATE CHANGE ON RAIL EQUIPMENT. POTENTIDepartment of TransportationFederal Railroad AdministrationHOUGHTON, MI-01$439,306Ends August 1, 2025
75D30119C05527TEMPORAL AND SPATIAL CHARACTERIZATION OF RESPIRABLE COAL MINE DUST (RCMD)Department of Health and Human ServicesCenters for Disease Control and PreventionHOUGHTON, MI-01$293,614Ends April 30, 2022
N0001426C1122AUTOMATIC GENERATION OF WAVEFORM DESCRIPTION VECTORS WITH CONTEXT SENSITIVE STATISTICALLY NOISE DECOMPOSITIONSDepartment of DefenseDepartment of the NavyHOUGHTON, MI-01$200,000Ends May 27, 2029
70Z02325CMER00005THE OBJECTIVE IS TO CONDUCT AND ADVANCE RESEARCH, DEVELOPMENT, TESTING, AND EVALUATION OF OIL SPILL RESPONSE KNOWLEDGE, TECHNIQUES, AND TACTICS IN FRESHWATER AND ICY WATER ENVIRONMENTSDepartment of Homeland SecurityU.S. Coast GuardANN ARBOR, MI-06$120,138Ends January 5, 2026

Subcontracts it reported

A prime contractor reports the subcontracts it gives under an award (first-tier subawards). These are the largest it reported under its three largest awards, from every year of each award.

Under award W56HZV19C0053

Subcontracts reported under award W56HZV19C0053
SubcontractorWhat it is for, as reportedAmountDate
LOCKHEED MARTIN CORPORATIONTHE GROUND VEHICLE SYSTEMS CENTER (GVSC) AND PRODUCT MANAGER VEHICLE PROTECTION SYSTEMS (PDM VPS) HAVE A CURRENT REQUIREMENT TO DEVELOP A PROTOTYPE SOLUTION FOR A PRIMARY PROCESSOR CARD THAT SLOTS INTO THE VPS BASE KIT (VBK) CONTROLLER.$2,002,222.23
MSC.SOFTWARE CORPORATIONTHE WORK OUTLINED HEREIN PROVIDES A HOLISTIC VIEW OF THE DEFENSE MOBILITY SYSTEM - PHASE 1 SCOPE. THE WORK TO SUPPORT THE DELIVERABLES OF THIS PROJECT WILL BE CONDUCTED BY A TEAM MADE UP OF THE FOLLOWING ORGANIZATIONS: MICHIGAN TECHNOLOGICAL UNIVERSITY (MTU) KEWEENAW RESEARCH CENTER MSC SOFTWARE COR$1,688,605
SYSTIMA TECHNOLOGIES INCTASK 1: HARDWARE MANUFACTURABILITY SUPPORT THIS TASK COVERS THE SUPPORT OF THE US ARMY COMBAT CAPABILITIES DEVELOPMENT COMMAND WITH THE MANUFACTURABILITY OF ADVANCED SURVIVABILITY SYSTEMS. THIS COVERS THE PROGRAMMATIC AND TECHNICAL SUPPORT AS OUTLINED IN THE SOW PROVIDED AS PART OF THE RFP. SYSTIMA$857,898.63
BAE SYSTEMS LAND AND ARMAMENTS L.P.3.0 SUBCONTRACT: THE CONTRACTOR SHALL SUBCONTRACT A QUALIFIED ENGINEERING FIRM TO ASSIST IN EXECUTING THIS SCOPE OF WORK IN SUPPORT OF THE SENSORS FOR ADAPTIVE ARMOR PROJECT. CCDC GVSC HAS SELECTED BAE SYSTEMS AS THE PREFERRED VENDOR FOR THIS EXECUTION. 4.0 DELIVERABLES SHALL BE SENT TO THE FOLLOWIN$789,000
BAE SYSTEMS LAND AND ARMAMENTS L.P.3.0 SUBCONTRACT: THE CONTRACTOR SHALL SUBCONTRACT A QUALIFIED ENGINEERING FIRM TO ASSIST IN EXECUTING THIS SCOPE OF WORK IN SUPPORT OF THE SENSORS FOR ADAPTIVE ARMOR PROJECT. CCDC GVSC HAS SELECTED BAE SYSTEMS AS THE PREFERRED VENDOR FOR THIS EXECUTION. 4.0 DELIVERABLES SHALL BE SENT TO THE FOLLOWIN$752,688
BAE SYSTEMS LAND & ARMAMENTS L.P.THE PURPOSE OF THIS EFFORT IS TO CONTINUE OUR TECHNOLOGY DEVELOPMENT EFFORTS FROM PREVIOUS AAST CONTRACTS TO FURTHER DEVELOP A FIRE CONTROL SYSTEM THAT WORKS IN AN ADAPTIVE ARMOR SYSTEM (AAS). THIS FIRE CONTROL SYSTEM SHALL CONFORM TO THE LATEST MODULAR ACTIVE PROTECTION SYSTEM FRAMEWORK (MAF) RELEA$670,567.92
CONCURRENT TECHNOLOGIES CORPTHE PURPOSE OF THIS EFFORT IS TO UTILIZE PROPRIETARY PROCESSES AND KNOWLEDGE TO ENSURE MANUFACTURABILITY OF ADVANCED SURVIVABILITY SYSTEMS THROUGH ITERATIVE PRODUCTION FOR INSPECTION AND TESTING. THE HARDWARE AND MANUFACTURING PROCESSES THAT THE CONTRACTOR WILL FURTHER DEVELOP SHALL CONFORM TO THE R$574,243.60
PRATT & MILLER ENGINEERING & FABRICATION, LLCTHE PAM WORK CONSISTS OF TWO PHASES WHICH TOGETHER WILL ADVANCE THE STATE-OF-THE-ART FOR INTEGRATED CONTROL OF GROUND VEHICLE ACTIVE CHASSIS SYSTEMS. THE FIRST PHASE CONTINUALLY INTEGRATES ADAPTIVE VEHICLE EFFECTORS ONTO THE IMDC VEHICLE WITH ON-BOARD INTEGRATED CONTROL REFINEMENTS AND LEVERAGES REM$551,989
DORNERWORKS, LLCDORNERWORKS IS PROPOSING DEVELOPING THE SAA SENSOR HEAD IN THREE PHASES. THE FIRST PHASE IS SYSTEM DESIGN IN WHICH WE DEVELOP A PLAN FOR WHAT WE ARE GOING TO DEVELOP AND HOW TO TEST IT. THE SECOND PHASE WILL FOR A SINGLE SENSOR PROTOTYPE, THIS PHASE WILL FOCUS ON GETTING A SENSOR UP AND RUNNING TO P$498,125
PRATT & MILLER ENGINEERING & FABRICATION, LLCTHE PAM WORK CONSISTS OF TWO PHASES WHICH TOGETHER WILL ADVANCE THE STATE-OF-THE-ART FOR INTEGRATED CONTROL OF GROUND VEHICLE ACTIVE CHASSIS SYSTEMS. THE FIRST PHASE CONTINUALLY INTEGRATES ADAPTIVE VEHICLE EFFECTORS ONTO THE IMDC VEHICLE WITH ON-BOARD INTEGRATED CONTROL REFINEMENTS AND LEVERAGES REM$375,574

More subcontracts are reported under this award; the 10 largest are listed.

Under award W912CH24C0038

Subcontracts reported under award W912CH24C0038
SubcontractorWhat it is for, as reportedAmountDate
LOCKHEED MARTIN CORPORATIONGVSP AND PDM VPS STARDUST$9,423,694
CONCURRENT TECHNOLOGIES CORPCTC ACKNOWLEDGES THE FOLLOWING PROJECT TECHNICAL TASKS: DETAILED REVIEW OF DRAWINGS, CAD, AND/OR HARDWARE AS APPLICABLE. DEVELOP MANUFACTURING PROCESSES AND PROCEDURES THAT ENSURE SCALABILITY. REVIEW THE MRL (MANUFACTURING READINESS LEVEL) OF THE HARDWARE AND MAKE RECOMMENDATIONS FOR DESIGN FOR MANU$1,931,562
SYSTIMA TECHNOLOGIES INCSYSTIMA$1,291,000
LOCKHEED MARTIN CORPORATIONVEHICLE BASE KIT (VBK) COMMON SOFT-KILL (SK) LAYERED SUPPORT$1,051,905
WAUKESHA FOUNDRY INCMATERIAL MATURATION$352,218
DETROIT DEFENSE, INC.INTRODUCTION/BACKGROUND MICHIGAN TECHNOLOGICAL UNIVERSITY (MICHIGAN TECH) KEWEENAW RESEARCH CENTER (KRC) IS ACTIVE ACROSS A BROAD SPECTRUM OF VEHICLE DEVELOPMENT. ORIGINALLY ESTABLISHED BY THE US ARMY FOR DEEP SNOW MOBILITY TESTING, KRC HAS BEEN INVOLVED IN MILITARY, INDUSTRIAL, AND COMMERCIAL VEHIC$310,927

Under award FA239424CB014

Subcontracts reported under award FA239424CB014
SubcontractorWhat it is for, as reportedAmountDate
FLORIDA STATE UNIVERSITYTHE FSU TEAM WILL CARRY OUT EXPERIMENTAL STUDIES OF THE MOLECULAR AND MORPHOLOGY TRANSFORMATION AS WELL AS DETAILED MICROSTRUCTURE EVALUATION OF THE SELECTED RESIN PRECURSORS DURING CARBON FIBER FABRICS C/C COMPOSITE MANUFACTURING USING ADVANCED CHARACTERIZATION TOOLS, INCLUDING AFM-IR, AFM-DMA TO U$1,998,040
THE TRUSTEES OF COLUMBIA UNIVERSITY IN THE CITY OF NEW YORKTASK 3: PROCESS MODELING OF C/C COMPOSITES THIS TASK AIMS TO UNDERSTAND THE FUNDAMENTAL MECHANISMS OF RESIDUAL STRESS FORMATION AND PYROLYSISINDUCED RESIDUAL STRESS IN C/C COMPOSITE MATERIALS FOR HIGH-TEMPERATURE AND HIGH-STRENGTH APPLICATIONS THROUGH EXPERIMENTALLY VALIDATED PROCESS MODELING. A NOV$600,000
RXFF CONSULTING LLCDFT CALCULATIONS (MONTH 1-MONTH 18). IN COLLABORATION WITH THE ODEGARD GROUP, WE WILL PERFORM DFT CALCULATIONS TO DESCRIBE REACTION ENERGIES, GEOMETRIES AND REACTION BARRIERS ASSOCIATED WITH THE CARBON COMPOSITE FORMATION PROCESS 2) FORCE FIELD TRAINING (MONTH 1- MONTH 24). WE WILL ORGANIZE THE DFT$399,946

Lobbying reports and campaign receipts that name this vendor

A name is matched only when it is the same name under the exact-name rule: letters and numbers alike, "&" read as "and", a leading "the" and one closing legal form (Inc, LLC, Corp, Corporation, Co, LP, LLP) set aside. A near name is never a match. Each match says which name matched.

Lobbying reports that name MICHIGAN TECHNOLOGICAL UNIVERSITY

How it matched: vendor name, exact name: the name in the lobbying report as client.

Lobbying reports
RegistrantClientAmount for the whole quarterQuarterFiledReport
DYKEMA GOSSETT PLLCMICHIGAN TECHNOLOGICAL UNIVERSITY$10,000reported as incomeThird quarter of 2026Open the report
Suggest a tool

Suggest a tool

A person reads each idea before it appears. Links are not accepted. Do not include personal information.

See all ideas and vote