OLSSON INDUSTRIAL ELECTRIC, INC
- Unique Entity ID (UEI)
- GH6DAYLK9EV1
- Parent company
- ITOCHU CORPORATION (UEI PRRXANJSLS26)
- Registered address
- SPRINGFIELD, OR, district OR-04
- Other names on record
- OLSSON INDUSTRIAL ELECTRIC INC.; OLSSON INDUSTRIAL ELECTRIC INCORPORATED; OLSSON INDUSTRIAL ELECTRIC, INC.
Dollars are contract obligations in the fiscal year, as USAspending adds them up from each award's transactions. A contract's full value can be larger and run over several years. A figure below zero is money taken back from contracts signed earlier.
Source: USAspending.gov, the Treasury’s public record of federal spending. Our copy was saved November 19, 2026.
Which agencies pay this vendor, and where the work is done
Fiscal year 2027
USAspending lists no contract dollars for this vendor in fiscal year 2027 yet.
Fiscal year 2026: $98,855,571.65
| Agency | Contract dollars |
|---|---|
| Department of the Interior | $68,735,483 |
| Department of Defense | $30,120,088.65 |
| District where the work is done | Contract dollars |
|---|---|
| CA-01James Gallagher | $68,735,483 |
| MT-01Ryan K. Zinke | $18,576,611.65 |
| WA-04Dan Newhouse | $7,962,658 |
| OR-02Cliff Bentz | $3,580,819 |
Largest awards
The largest contract awards with activity from October 1, 2025 to September 30, 2027, by each award's total amount over its whole life. 0 rows of the answer belong to related companies and are left out.
| Award | Agency | Where the work is done | Award total | Start |
|---|---|---|---|---|
| 140R2026C0001TRD GSU TRANSFORMER REPLACEMENTS | Department of the InteriorBureau of Reclamation | REDDING, CA-01 | $68,735,483 | Ends April 9, 2034 |
| W912EF21C0010MCNARY EXCITERS, GOVERNORS, AND POWERHOUSE CONTROLS UPGRADES | Department of DefenseDepartment of the Army | UMATILLA, OR-02 | $50,798,080.04 | Ends November 19, 2026 |
| W912DW24C0010LIBBY DAM UNIT 6 INSTALLATION | Department of DefenseDepartment of the Army | LIBBY, MT-01 | $28,744,468.18 | Ends May 26, 2027 |
| W912DW25C0003REPLACEMENT, DEMOLITION, INSTALLATION, AND/OR REFURBISHMENT OF ISOLATED PHASE BUS SECTIONS AT CHIEF JOSEPH DAM, BRIDGEPORT, WA. | Department of DefenseDepartment of the Army | BRIDGEPORT, WA-04 | $14,126,566 | Ends May 3, 2028 |
Subcontracts it reported
A prime contractor reports the subcontracts it gives under an award (first-tier subawards). These are the largest it reported under its three largest awards, from every year of each award.
Under award W912EF21C0010
| Subcontractor | What it is for, as reported | Amount | Date |
|---|---|---|---|
| ABB INC. | DESIGN, MANUFACTURE AND SUPPLY MCNARY DAM EXCITATION SYSTEM EQUIPMENT | $4,311,980 | |
| THOMPSON CONSTRUCTION GROUP INC | SUPPLY OF EXCITATION WORK BASE ITEMS AND INSTALLATION OF COLLECTOR RING ASSEMBLY | $1,244,159.73 | |
| APOLLO INC | ADDITION OF MECHANICAL DESIGN OF PIPING AND CHANGE MATERIAL TO STAINLESS STEEL | $713,807 | |
| APOLLO INC | SUPPLY LABOR, MATERIALS, AND EQUIPMENT FOR THE GOVERNOR AIR SYSTEM | $602,694 | |
| AMERICAN GOVERNOR COMPANY | DIGITAL GOVERNOR COMMISSIONING AND SUPPORT SERVICES | $584,617 | |
| S2 INDUSTRIAL INC | GOVERNOR MECHANICAL SYSTEM FOR UNITS 11 & 12 | $573,529 | |
| S2 INDUSTRIAL INC | GOVERNOR MECHANICAL SYSTEM FOR UNITS 13 & 14 | $549,236 | |
| NRC ENVIRONMENTAL SERVICES INC. | PIPE PIGGING, TANK CLEANING, TRANSPORT AND DISPOSAL OF WASTE AT MCNARY DAM | $457,477.86 | |
| CIRCOR PUMPS NORTH AMERICA, LLC | MANUFACTURE AND FURNISH 12 GOVERNOR OIL PUMP PACKAGES AND SUPPORTING DOCUMENTATION | $441,931 | |
| CALVERT COMPANY, INC., THE | MANUFACTURE AND SUPPLY NON-SEGREGATED PHASE BUS | $364,727 |
More subcontracts are reported under this award; the 10 largest are listed.
Under award W912DW24C0010
| Subcontractor | What it is for, as reported | Amount | Date |
|---|---|---|---|
| NATIONAL ELECTRIC COIL CO., L.P. | PERFORM WORK ON UNIT 6 TEST STATOR SECTIONS, NEUTRAL CURRENT TRANSFORMERS, PARTIAL DISCHARGE ANALYSIS SYSTEM, POLES, COLLECTOR RINGS, SHAFT, LEADS, BRUSHES AND BRUSH RIGGING, AND ROTORS | $4,340,261.92 | |
| AMERICAN HYDRO LLC | UNIT 6 TURBINE DISASSEMBLY, UNIT ALIGNMENT, AND COMMISSIONING SUPPORT | $4,185,652 | |
| GREENBERRY INDUSTRIAL LLC | UNIT 6 SUPPLY AND INSTALL MECHANICAL AND PIPING SYSTEM | $1,995,645 | |
| PHOENIX ELECTRIC CORP. | 15KV OUTDOOR HVR-63XS GENERATOR CIRCUIT BREAKER CUBICLE RETROFIT | $982,000 | |
| CALVERT COMPANY, INC., THE | DESIGN AND FURNISH ISOLATED PHASE BUS AND SURGE/PT CUBICLE | $736,694 | |
| ABB INC | DESIGN, FABRICATE, FACTORY TEST, AND DELIVER ONE (1) EXCITATION SYSTEM | $541,649 | |
| EMERSON PROCESS MANAGEMENT POWER & WATER SOLUTIONS, INC. | DIGITAL GOVERNOR PLC RETROFIT AND COMMISSIONING SUPPORT | $384,490 | |
| HITACHI ENERGY USA INC. | SUPPLY CONTRACT FOR GENERATOR CIRCUIT BREAKER, SF6 GAS AND REGULATOR, AND CONTROL CABLES | $234,764 | |
| CONSOLIDATED ELECTRICAL DISTRIBUTERS | SUPPLY MOTOR CONTROL CENTERS. | $94,500 |
Lobbying reports and campaign receipts that name this vendor
No lobbying report, organization page or FEC receipt in our saved records has this vendor’s name or its parent company’s name.
A name is matched only when it is the same name under the exact-name rule: letters and numbers alike, "&" read as "and", a leading "the" and one closing legal form (Inc, LLC, Corp, Corporation, Co, LP, LLP) set aside. A near name is never a match. Each match says which name matched.