THE CORPORATION OF MERCER UNIVERSITY
- Unique Entity ID (UEI)
- CHM5ZAJTSS99
- Parent company
- THE CORPORATION OF MERCER UNIVERSITY (UEI FKLCLQFBA463)
- Registered address
- WARNER ROBINS, GA, district GA-08
- Other names on record
- CORPORATION OF MERCER UNIVERSITY THE; CORPORATION OF MERCER UNIVERSITY, THE; MERCER UNIVERSITY; THE CORPORATION OF MERCER UNIV
Dollars are contract obligations in the fiscal year, as USAspending adds them up from each award's transactions. A contract's full value can be larger and run over several years. A figure below zero is money taken back from contracts signed earlier.
Source: USAspending.gov, the Treasury’s public record of federal spending. Our copy was saved November 17, 2026.
Which agencies pay this vendor, and where the work is done
Fiscal year 2027
USAspending lists no contract dollars for this vendor in fiscal year 2027 yet.
Fiscal year 2026: $21,587,089.29
| Agency | Contract dollars |
|---|---|
| Department of Defense | $21,587,089.29 |
| District where the work is done | Contract dollars |
|---|---|
| GA-08Austin Scott | $14,573,560.59 |
| GA-02Sanford D. Bishop, Jr. | $7,013,528.70 |
Largest awards
The largest contract awards with activity from October 1, 2025 to September 30, 2027, by each award's total amount over its whole life. 0 rows of the answer belong to related companies and are left out.
| Award | Agency | Where the work is done | Award total | Start |
|---|---|---|---|---|
| FA855222F0006ROTARY WING INTEGRITY PROGRAMS TASK ORDER | Department of DefenseDepartment of the Air Force | WARNER ROBINS, GA-08 | $26,215,011.60 | Ends April 20, 2027 |
| FA855217C0006IGF::OT::IGF THE AIRCRAFT STRUCTURAL INTEGRITY PROGRAM (ASIP) AND MECHANICAL EQUIPMENT AND SUBSYSTEM PROGRAM (MESIP)ARE PART OF AN OVERALL AGING AIRCRAFT LIFE CYCLE MANAGEMENT SUSTAINMENT EFFORT FOR THE TH-1H, UH-1N, AND HH-60G UNITED STATES ROTARY WING. | Department of DefenseDepartment of the Air Force | WARNER ROBINS, GA-08 | $25,973,831 | Ends April 20, 2022 |
| FA857521F0003RSAF F-15 AIRCRAFT ENGINEERING SQUADRON EQUIPMENT AND TOOLING REQUIREMENTS | Department of DefenseDepartment of the Air Force | WARNER ROBINS, GA-08 | $23,298,518.35 | Ends June 30, 2030 |
| FA852322F0015ELECTRONIC WARFARE & AVIONICS INTEGRATION SUPPORT FACILITY (EWAISF) ENGINEERING SERVICES | Department of DefenseDepartment of the Air Force | WARNER ROBINS, GA-08 | $14,683,548.23 | Ends December 31, 2026 |
| FA850425FB004C-130 HERCULES DIVISION FUNCTIONAL SYSTEM INTEGRITY PROGRAM (FSIP). | Department of DefenseDepartment of the Air Force | MACON, GA-02 | $10,007,527 | Ends October 31, 2027 |
| FA852825FB003U-2 AIRCRAFT STRUCTURAL INTEGRITY PLAN ORDER CONTROL NUMBER: MC21-25-047 | Department of DefenseDepartment of the Air Force | WARNER ROBINS, GA-08 | $9,652,440.90 | Ends September 10, 2027 |
| FA852325FB001TO PROVIDE FUNDING AND SUPPORT TOWARDS ENGINEERING SERVICES WITH MERC ON CONTRACT FA8530-20-D-0001, AGING BOMBER (POP - 31 JAN 25 - 30 JULY 2028). MC-24-040 | Department of DefenseDepartment of the Air Force | WARNER ROBINS, GA-08 | $6,686,611.81 | Ends January 30, 2027 |
| FA850925FB017TO EXERCISE OPTION 1 IN SUPPORT OF SUSTAINING ENGINEERING SOF/PR C130 FOR CONTRACT FA8509-25-D-0005 | Department of DefenseDepartment of the Air Force | WARNER ROBINS, GA-08 | $4,030,000 | Ends February 26, 2027 |
| FA850926FB023TASK ORDER IN SUPPORT OF SUSTAINING ENGINEERING SOF/PR C130 FOR CONTRACT FA8509-24-D-0005 | Department of DefenseDepartment of the Air Force | WARNER ROBINS, GA-08 | $2,970,000 | Ends June 30, 2027 |
| FA850426FB017THIS SUSTAINING ENGINEERING EFFORT PROVIDES SUPPORT FOR THE C-130 HERCULES DIVISIONS (AFLCMC/WLNE) INDIVIDUAL AIRCRAFT TRACKING PROGRAM (IATP). SUSTAINMENT, REPAIR, AND DEMODIFICATION OF THE C-130H L/ESS SYSTEM IS SUPPORTED BY THIS IATP EFFORT. | Department of DefenseDepartment of the Air Force | WARNER ROBINS, GA-02 | $2,565,944.71 | Ends May 29, 2030 |
| N0001925C0002NON-RECURRING ENGINEERING | Department of DefenseDepartment of the Navy | WARNER ROBINS, GA-08 | $2,356,950.91 | Ends March 31, 2027 |
| FA850925FB021AMATS ORDER FOR MERC ERR 2025-010 AND ERR 2025-011. | Department of DefenseDepartment of the Air Force | WARNER ROBINS, GA-08 | $1,970,000 | Ends February 26, 2027 |
| FA853824F0059ESSENTIAL ENGINEERING SERVICES IN SUPPORT OF ROBINS AFB. | Department of DefenseDepartment of the Air Force | WARNER ROBINS, GA-08 | $1,469,610.45 | Ends March 22, 2027 |
| FA850924F0026SUSTAINMENT ENGINEERING SERVICES | Department of DefenseDepartment of the Air Force | WARNER ROBINS, GA-08 | $1,314,721.04 | Ends March 11, 2026 |
| FA855325FB007ENGINEERING SERVICES TO SUPPORT DEPARTMENT OF DEFENSE NATIONAL POLICY FOR DEFENSE SECURITY COOPERATIONS IN ACCORDANCE WITH DOD 5000.1. THIS CAPABILITY WILL SUPPORT PARTNER NATIONSAS MEMBERS OF THE USAF C-130 TECHNICAL COORDINATION GROUP. | Department of DefenseDepartment of the Air Force | WARNER ROBINS, GA-08 | $919,883.62 | Ends May 14, 2027 |
| FA852320F0047KC-46 DEFENSIVE SYSTEMS MISSION DATA FILE DEVELOPMENT | Department of DefenseDepartment of the Air Force | WARNER ROBINS, GA-08 | $778,360.40 | Ends July 21, 2022 |
| FA852625FB011SUPPORT AND SUSTAIN THE AIRWORTHINESS/CONFIGURATION MANAGEMENT WEB-BASED TOOL (AWCM) FOR THE C-17 PROGRAM OFFICE | Department of DefenseDepartment of the Air Force | WARNER ROBINS, GA-08 | $561,974.03 | Ends September 29, 2026 |
| FA857526F0004AIRCAT | Department of DefenseDepartment of the Air Force | WARNER ROBINS, GA-08 | $186,937.11 | Ends April 6, 2030 |
Subcontracts it reported
A prime contractor reports the subcontracts it gives under an award (first-tier subawards). These are the largest it reported under its three largest awards, from every year of each award.
Under award FA855222F0006
| Subcontractor | What it is for, as reported | Amount | Date |
|---|---|---|---|
| QTEC, INC. | ENGINEERING SERVICES TO PERFORM ENGINEERING INVESTIGATIONS AND ANALYSES, FORMULATE DEFICIENCY RESOLUTION CONCEPTS, DESIGN PROOF OF CONCEPTS, AND DEVELOP FINALIZED ENGINEERING CHANGE PROPOSALS FOR MAINTAINING THE OPERATIONAL LIFE CYCLE READINESS AND ENSURING THE SAFETY OF THE RW FLEETS (HH-60G, HH-60 | $1,453,861.30 | |
| QTEC, INC. | ENGINEERING SERVICES TO PERFORM ENGINEERING INVESTIGATIONS AND ANALYSES, FORMULATE DEFICIENCY RESOLUTION CONCEPTS, DESIGN PROOF OF CONCEPTS, AND DEVELOP FINALIZED ENGINEERING CHANGE PROPOSALS FOR MAINTAINING THE OPERATIONAL LIFE CYCLE READINESS AND ENSURING THE SAFETY OF THE RW FLEETS (HH-60G, HH-60 | $167,725.51 | |
| CURTISS-WRIGHT DS, INC. | REPLACEMENT PARTS REQUIRED FOR ON-GOING SUPPORT OF THE L/ESS. | $71,266 |
Under award FA855217C0006
| Subcontractor | What it is for, as reported | Amount | Date |
|---|---|---|---|
| QTEC, INC. | PROVIDE THE USAF H-60 PROGRAM OFFICE TECHNICAL SUPPORT SERVICES FOR THE PURPOSES OF PROVIDING IVHMS SUBJECT MATTER AND LOGISTICS EXPERTISE, DATA ANALYSIS, AND FIELDED SYSTEM SUPPORT. | $870,000 | |
| QTEC, INC. | PROVIDE THE USAF H-60 PROGRAM OFFICE TECHNICAL SUPPORT SERVICES FOR THE PURPOSES OF PROVIDING IVHMS SUBJECT MATTER AND LOGISTICS EXPERTISE, DATA ANALYSIS, AND FIELDED SYSTEM SUPPORT. | $870,000 | |
| QTEC, INC. | ENGINEERING SERVICES TO PROVIDE THE USAF HH-60 PROGRAM OFFICE IVHMS SUBJECT MATTER AND LOGISTIC EXPERTISE, DATA ANALYSIS, AND FIELDED SUPPORT. | $870,000 | |
| QTEC, INC. | SUBJECT MATTER EXPERTISE SUPPORT FOR HH-60G IVHMS SYSTEM. | $870,000 | |
| QTEC, INC. | SUBJECT MATTER EXPERTISE SUPPORT FOR HH-60G IVHMS SYSTEM. | $869,999 | |
| QTEC, INC. | ENGINEERING SERVICES TO PROVIDE THE USAF HH-60 PROGRAM OFFICE IVHMS SUBJECT MATTER AND LOGISTIC EXPERTISE, DATA ANALYSIS, AND FIELDED SUPPORT. | $620,579.49 | |
| QTEC, INC. | SUBJECT MATTER EXPERTISE SUPPORT FOR HH-60G IVHMS SYSTEM. | $526,000 | |
| DELL MARKETING L.P. | ENGINEERING SERVICES TO ESTABLISH THE REQUIRED SUSTAINING ENGINEERING SERVICES (SES) IN THE AREAS OF ASIP AND MECSIP TO PERFORM ENGINEERING INVESTIGATIONS AND ANALYSES, FORMULATE DEFICIENCY RESOLUTION CONCEPTS, DESIGN PROOF OF CONCEPTS, AND DEVELOP FINALIZED ENGINEERING CHANGE PROPOSALS FOR MAINTAIN | $109,499.16 | |
| HONEYWELL INTERNATIONAL INC. | ENGINEERING SERVICES FOR SUPPORT OF THE UH-1N HUMS ON-BOARD TESTING AND SYSTEM DEVELOPMENT. | $51,896 | |
| TOM BRUSSAT ENGINEERING LLC | ADDITIONAL SOW FOR TH-1H, UH-1N ANALYSIS. | $50,000 |
More subcontracts are reported under this award; the 10 largest are listed.
Under award FA857521F0003
| Subcontractor | What it is for, as reported | Amount | Date |
|---|---|---|---|
| MODELS & TOOLS INC. | FABRICATION SERVICES TO COMPLETE CANOPY OVERHAUL FRAME AND ALIGNMENT KIT HARDWARE ITEMS | $925,130 | |
| MODELS & TOOLS INC. | FABRICATION SERVICES. | $905,510 | |
| MODELS & TOOLS INC. | MANUFACTURE AND ASSEMBLY OF WING LUGS REAM KIT PORTIONS. | $422,835 | |
| FUTURAMIC TOOL & ENGINEERING CO | FABRICATION OF HORIZONTAL STABILIZERS | $422,598.16 | |
| S. F. INDUSTRIAL, INC. | ENGINEERING SERVICES FOR REVERSE ENGINEERING AND MECHANICAL PROTOTYPING FOR THE ROYAL SAUDI AIR FORCE (RSAF) FOR EQUIPMENT AND TOOLING REQUIREMENTS, AS WELL AS FABRICATING FIXTURES, THAT WILL BE USED TO VALIDATE A TECHNICAL DATA PACKAGE (TDP) AND DELIVER THE EQUIPMENT AND TOOLING TO THE RSAF. | $271,386.45 | |
| S. F. INDUSTRIAL, INC. | ENGINEERING SERVICES FOR REVERSE ENGINEERING AND MECHANICAL PROTOTYPING FOR EQUIPMENT AND TOOLING REQUIREMENTS, AS WELL AS FABRICATING FIXTURES, THAT WILL BE USED TO VALIDATE A TECHNICAL DATA PACKAGE (TDP) AND DELIVER THE EQUIPMENT AND TOOLING | $269,241.45 | |
| PRIME MACHINE, INC. | ENGINEERING SERVICES FOR REVERSE ENGINEERING AND MECHANICAL PROTOTYPING FOR THE ROYAL SAUDI AIR FORCE (RSAF) FOR EQUIPMENT AND TOOLING REQUIREMENTS, AS WELL AS FABRICATING FIXTURES, THAT WILL BE USED TO VALIDATE A TECHNICAL DATA PACKAGE (TDP) AND DELIVER THE EQUIPMENT AND TOOLING TO THE RSAF. | $266,588 | |
| UNITED DRILL BUSHING CORPORATION | ENGINEERING SERVICES FOR REVERSE ENGINEERING AND MECHANICAL PROTOTYPING FOR THE ROYAL SAUDI AIR FORCE (RSAF) FOR EQUIPMENT AND TOOLING REQUIREMENTS, AS WELL AS FABRICATING FIXTURES, THAT WILL BE USED TO VALIDATE A TECHNICAL DATA PACKAGE (TDP) AND DELIVER THE EQUIPMENT AND TOOLING TO THE RSAF. | $204,544 | |
| UNITED DRILL BUSHING CORPORATION | ENGINEERING SERVICES FOR REVERSE ENGINEERING AND MECHANICAL PROTOTYPING FOR THE ROYAL SAUDI AIR FORCE (RSAF) FOR EQUIPMENT AND TOOLING REQUIREMENTS, AS WELL AS FABRICATING FIXTURES, THAT WILL BE USED TO VALIDATE A TECHNICAL DATA PACKAGE (TDP) AND DELIVER THE EQUIPMENT AND TOOLING TO THE RSAF. | $203,343.95 | |
| PRIME MACHINE, INC. | ENGINEERING SERVICES FOR REVERSE ENGINEERING AND MECHANICAL PROTOTYPING FOR THE ROYAL SAUDI AIR FORCE (RSAF) FOR EQUIPMENT AND TOOLING REQUIREMENTS, AS WELL AS FABRICATING FIXTURES, THAT WILL BE USED TO VALIDATE A TECHNICAL DATA PACKAGE (TDP) AND DELIVER THE EQUIPMENT AND TOOLING TO THE RSAF. | $177,476 |
More subcontracts are reported under this award; the 10 largest are listed.
Lobbying reports and campaign receipts that name this vendor
No lobbying report, organization page or FEC receipt in our saved records has this vendor’s name or its parent company’s name.
A name is matched only when it is the same name under the exact-name rule: letters and numbers alike, "&" read as "and", a leading "the" and one closing legal form (Inc, LLC, Corp, Corporation, Co, LP, LLP) set aside. A near name is never a match. Each match says which name matched.