THE JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLC
- Unique Entity ID (UEI)
- C1HBCJ9RMBV3
- Parent company
- THE JOHNS HOPKINS UNIVERSITY (UEI FTMTDMBR29C7)
- Registered address
- LAUREL, MD, district MD-03
- Other names on record
- HOPKINS JOHNS UNIVERSITY; JOHN HOPKINS UNIVERSITY; JOHNS HOPKINS UNIV; JOHNS HOPKINS UNIVERSITY; JOHNS HOPKINS UNIVERSITY (5111); JOHNS HOPKINS UNIVERSITY (JHU); JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABO; JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLC THE; JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLC, THE; JOHNS HOPKINS UNIVERSITY, THE
Dollars are contract obligations in the fiscal year, as USAspending adds them up from each award's transactions. A contract's full value can be larger and run over several years. A figure below zero is money taken back from contracts signed earlier.
Source: USAspending.gov, the Treasury’s public record of federal spending. Our copy was saved November 20, 2026.
Which agencies pay this vendor, and where the work is done
Fiscal year 2027: $131,859,478.27
| Agency | Contract dollars |
|---|---|
| National Aeronautics and Space Administration | $131,860,119.92 |
| Department of Homeland Security | $0 |
| Executive Office of the President | -$641.65 |
| District where the work is done | Contract dollars |
|---|---|
| MD-03Sarah Elfreth | $131,860,119.92 |
| MD-05Steny H. Hoyer | -$641.65 |
Fiscal year 2026: $2,197,263,556.45
| Agency | Contract dollars |
|---|---|
| Department of Defense | $1,645,781,827.91 |
| National Aeronautics and Space Administration | $497,354,569.38 |
| Department of Homeland Security | $35,507,427.45 |
| Department of Health and Human Services | $10,211,513.25 |
| Department of Commerce | $4,208,653.74 |
| Department of Transportation | $2,651,965.45 |
| Department of State | $1,075,344.27 |
| Department of Energy | $472,255 |
| District where the work is done | Contract dollars |
|---|---|
| MD-03Sarah Elfreth | $2,011,591,770.17 |
| MD-05Steny H. Hoyer | $49,836,786.93 |
| DC-98Eleanor Holmes Norton | $42,459,457.95 |
| UT-01Blake D. Moore | $33,328,773.01 |
| AL-05Dale W. Strong | $31,155,782.23 |
| VA-08Donald S. Beyer, Jr. | $7,736,272.67 |
| CA-36Ted Lieu | $4,300,000 |
| CO-05Jeff Crank | $3,594,975 |
| MD-04Glenn Ivey | $3,555,762.51 |
| NM-01Melanie A. Stansbury | $3,285,000 |
| GA-05Nikema Williams | $2,249,573 |
| VA-11James R. Walkinshaw | $2,000,000 |
| VA-03Robert C. "Bobby" Scott | $1,500,000 |
| MD-07Kweisi Mfume | $251,470 |
| NE-01Mike Flood | $0 |
| FL-14Kathy Castor | $0 |
| PA-12Summer L. Lee | -$1,648.75 |
| PA-17Christopher R. Deluzio | -$1,863.99 |
| TX-37Lloyd Doggett | -$3,568.58 |
Largest awards
The largest contract awards with activity from October 1, 2025 to September 30, 2027, by each award's total amount over its whole life. 0 rows of the answer belong to related companies and are left out.
| Award | Agency | Where the work is done | Award total | Start |
|---|---|---|---|---|
| 80MSFC22F0048DRAGONFLY EXTENDED PHASE B MISSION UNDER 80MSFC20D0004 AEROSPACE RESEARCH, DEVELOPMENT AND ENGINEERING SUPPORT (ARDES) II. | National Aeronautics and Space Administration | LAUREL, MD-03 | $1,414,827,399 | Ends August 31, 2028 |
| NNN10AA08TSOLAR PROBE PLUS (SPP) PHASE A ACTIVITIES THE CONTRACTOR SHALL PERFORM THE WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE CONTRACTING OFFICER. THE OVERALL SCOPE OF WORK TO BE PERFORMED WILL SUPPORT ALL OF NASA'S MISSION DIRECTORATES. THESE EFFORTS CAN BE CHARACTERIZED AS AEROSPACE RESEARCH, DE | National Aeronautics and Space Administration | LAUREL, MD-03 | $894,500,235 | Ends March 31, 2026 |
| 80MSFC21F0224INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) PHASE CD | National Aeronautics and Space Administration | LAUREL, MD-03 | $400,021,412 | Ends January 31, 2028 |
| HQ003419F0278POWER PROJECTION 2: PROVIDE ASSESSMENTS AND ALTERNATIVES OF OFFENSIVE CAPABILITIES WITHIN ABOVE DOMAINS, MISSIONS AND WARFARE AREAS | Department of DefenseWashington Headquarters Services | LAUREL, MD-03 | $398,272,491.90 | Ends May 30, 2024 |
| HQ003422F0001JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY WILL SUPPORT THE OFFICE OF THE UNDER SECRETARY OF DEFENSE FOR RESEARCH AND ENGINEERING WITH THIS POWER PROJECTION 3 TASK ORDER TO ESTABLISH AND MAINTAIN ESSENTIAL RESEARCH AND ENGINEERING EXPERTISE. | Department of DefenseWashington Headquarters Services | LAUREL, MD-03 | $346,693,601.52 | Ends June 29, 2027 |
| GSFC0199706DNAS597179TIMED PHASE C/D/E LETTER CONTRACT | National Aeronautics and Space Administration | LAUREL, MD-03 | $246,031,358.35 | Ends June 12, 2013 |
| HR001125F0008DARPA RESEARCH PROGRAM SUPPORT SERVICES | Department of DefenseDefense Advanced Research Projects Agency | LAUREL, MD-03 | $231,362,494 | Ends September 30, 2026 |
| NNN15AA05TIGF::CL::IGF ASTERIOD IMPACT AND DEFLECTION ASSESSMENT (AIDA) - DOUBLE ASTERIOD REDIRECTION TEST (DART) PHASE A STUDY THE CONTRACTOR SHALL PERFORM THE WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE CONTRACTING OFFICER. THE OVERALL SCOPE OF WORK TO BE PERFORMED WILL SUPPORT ALL OF NASA'S MISSIO | National Aeronautics and Space Administration | LAUREL, MD-03 | $222,014,202.96 | Ends August 15, 2022 |
| HQ014719F0023PROVIDE ANALYSIS TO INCLUDE DESIGN, DEVELOP, INTEGRATE, AND TEST AN AEGIS BMD MISSION PLANNER MODEL PROTOTYPE WHICH INCLUDES THE CERBERUS PROJECT IN ACCORDANCE WITH THE SOW, SECTION J, AND EXECUTING THE COMBAT SYSTEMS TASK ORDER TASKS. PSC AC23 EXPENDITURE TYPE 255.0 R&D | Department of DefenseMissile Defense Agency | LAUREL, MD-03 | $167,233,061.78 | Ends November 30, 2026 |
| 0018IGF::OT::IGF ENGINEERING AND TECHNICAL SUPPORT | Department of DefenseMissile Defense Agency | LAUREL, MD-03 | $166,701,571.89 | Ends April 30, 2018 |
| HQ014719F0012ENGINEERING AND TECH SUPPORT RDTE FUNDS | Department of DefenseMissile Defense Agency | LAUREL, MD-03 | $166,588,847.28 | Ends December 31, 2026 |
| FA820423F0028ENGINEERING SERVICES. | Department of DefenseDepartment of the Air Force | LAUREL, MD-03 | $164,989,791 | Ends July 23, 2026 |
| HQ014718F0043ENGINEERING AND TECH SUPPORT RDTE FUNDS IGF::OT::IGF | Department of DefenseMissile Defense Agency | LAUREL, MD-03 | $116,429,657.15 | Ends January 11, 2027 |
| HQ014718F0024ENGINEERING AND TECH SUPPORT RDTE FUNDS IGF::OT::IGF | Department of DefenseMissile Defense Agency | LAUREL, MD-03 | $104,864,151.54 | Ends December 30, 2026 |
| HQ003419F0407CYBER STUDIES AND ANALYSIS | Department of DefenseWashington Headquarters Services | LAUREL, MD-03 | $102,621,853.47 | Ends September 29, 2024 |
| HQ014719F0008ENGINEERING AND TECH SUPPORT RDTE FUNDS IGF::OT::IGF | Department of DefenseMissile Defense Agency | LAUREL, MD-03 | $100,778,679.61 | Ends May 31, 2026 |
| HQ014719F0005ENGINEERING AND TECH SUPPORT RDTE FUNDS | Department of DefenseMissile Defense Agency | LAUREL, MD-03 | $93,358,582.38 | Ends January 11, 2027 |
| FA881920F1005DEVELOPMENT OF A CAPABILITY THAT LEVERAGES PHYSICS-BASED MODELING, SIMULATION, AND ANALYSIS | Department of DefenseDepartment of the Air Force | LAUREL, MD-03 | $89,874,207 | Ends May 10, 2025 |
| N0002423F8009S3119-SSBN SECURITY TECHNOLOGY | Department of DefenseDepartment of the Navy | LAUREL, MD-03 | $67,450,314 | Ends September 30, 2026 |
| HQ003423F0471STUDIES AND ANALYSES SUPPORT | Department of DefenseWashington Headquarters Services | LAUREL, MD-03 | $66,182,446 | Ends September 19, 2026 |
| N0002423F8051AIR AND MISSILE DEFENSE POWER PROJECTION | Department of DefenseDepartment of the Navy | LAUREL, MD-03 | $65,028,813 | Ends June 5, 2026 |
| N0002423F8129NAVY CONVENTIONAL PROMPT STRIKE PROGRAM | Department of DefenseDepartment of the Navy | LAUREL, MD-03 | $62,165,858 | Ends March 31, 2027 |
| 70B02C23C00000035U.S. CUSTOMS AND BORDER PROTECTION HAS A REQUIREMENT FOR MISSION ENGINEERING AND OPERATIONAL RESEARCH (MEOR) SUPPORT SERVICES INCLUDING OPERATIONAL ANALYTICS AND OTHER TECHNICAL SUPPORT ACTIVITIES. | Department of Homeland SecurityU.S. Customs and Border Protection | LAUREL, MD-03 | $61,684,761.05 | Ends May 17, 2027 |
| HQ014718F0062ENGINEERING AND TECH SUPPORT RDTE FUNDS IGF::OT::IGF | Department of DefenseMissile Defense Agency | LAUREL, MD-03 | $57,525,835.67 | Ends October 30, 2025 |
| NNN16AA09TIGF::CL::IGF VAN ALLEN PROBE PHASE E EXTENDED MISSION THE CONTRACTOR SHALL PERFORM THE WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE CONTRACTING OFFICER. THE OVERALL SCOPE OF WORK TO BE PERFORMED WILL SUPPORT ALL OF NASA'S MISSION DIRECTORATES. THESE EFFORTS CAN BE CHARACTERIZED AS AEROSPACE | National Aeronautics and Space Administration | LAUREL, MD-03 | $57,394,471.09 | Ends November 30, 2021 |
| FA865623FA001AIR WARFARE SYSTEMS | Department of DefenseDepartment of the Air Force | LAUREL, MD-03 | $55,188,444.56 | Ends July 31, 2026 |
| FA881919F1003DEEP SPACE ADVANCE RADAR CONCEPT PROTOTYPES | Department of DefenseDepartment of the Air Force | LAUREL, MD-03 | $54,286,896.84 | Ends September 30, 2021 |
| FA881926FB001SPACE-BASED INTERCEPTOR (SBI) PROGRAM- PROVIDE TECHNICAL DEVELOPMENT EXPERTISE, SYSTEMS ENGINEERING AND ANALYSIS, MODELING AND SIMULATION, AND HARDWARE AND SOFTWARE PROTOTYPING. | Department of DefenseDepartment of the Air Force | LAUREL, MD-03 | $53,525,276 | Ends February 28, 2030 |
| FA865023C9302JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY SUPPORT TO THE INTEGRATED CAPABILITIES DIRECTORATE | Department of DefenseDepartment of the Air Force | LAUREL, MD-03 | $52,681,308.38 | Ends March 23, 2027 |
| FA945318F0007SMALLSAT SUPPORT TASK | Department of DefenseDepartment of the Air Force | LAUREL, MD-03 | $51,942,512.62 | Ends December 31, 2026 |
| 75A50122C00052TO DEVELOP RITCA AS AN ONLINE AND MOBILE PHONE-BASED APPLICATION. RITCA WILL SERVE AS A DISASTER RESPONSE TOOL FOR A REGIONAL AREA WITHIN THE BROAD RANGE OF THE MEDICAL RESPONDER COMMUNITY. THIS APPLICATION WILL ALLOW FOR SYNCHRONOUS AND ASYNCHR | Department of Health and Human ServicesOffice of Assistant Secretary for Preparedness and Response | LAUREL, MD-03 | $49,215,931 | Ends September 30, 2028 |
| HR001125F0450DARPA RESEARCH PROGRAM SUPPORT SERVICES | Department of DefenseDefense Advanced Research Projects Agency | LAUREL, MD-03 | $47,709,796.53 | Ends October 10, 2026 |
| HQ085420F0056ENGINEERING AND TECH SUPPORT RDTE FUNDS | Department of DefenseMissile Defense Agency | LAUREL, MD-03 | $46,151,575.88 | Ends June 30, 2025 |
| FA881925FB019JHU/APL SHALL PROVIDE A BROAD RANGE OF EXPERTISE AND EXPERIENCE TO ACCOMPLISH TECHNICAL SUPPORT AND ADVISORY SERVICES TO ASSIST THE SPACE WARFIGHTING ANALYSIS CENTER AND ITS MISSION AREAS. | Department of DefenseDepartment of the Air Force | LAUREL, MD-03 | $43,362,184.28 | Ends April 14, 2029 |
| HR001125F0451DARPA RESEARCH PROGRAM SUPPORT SERVICES | Department of DefenseDefense Advanced Research Projects Agency | LAUREL, MD-03 | $42,142,751.47 | Ends July 28, 2026 |
| HQ014719F5079ENGINEERING AND TECH SUPPORT RDTE FUNDS | Department of DefenseMissile Defense Agency | LAUREL, MD-03 | $41,726,764.85 | Ends October 31, 2025 |
| 80MSFC27F7003SPACE REACTOR-1 FREEDOM HEAT REJECTION SYSTEM | National Aeronautics and Space Administration | LAUREL, MD-03 | $39,254,898.92 | Ends December 31, 2027 |
| 80MSFC21F0242THE PAYLOADS AND RESEARCH INVESTIGATIONS ON THE SURFACE OF THE MOON (PRISM) TASK ORDER UNDER AEROSPACE RESEARCH, DEVELOPMENT AND ENGINEERING SUPPORT (ARDES) II 80MSFC20D0004. | National Aeronautics and Space Administration | LAUREL, MD-03 | $37,767,544 | Ends June 30, 2027 |
| N0002424F8187INITEGRATED FUN WEAPON SYSTEMS AND COMMAND AND CONTROL | Department of DefenseDepartment of the Navy | LAUREL, MD-03 | $37,495,592 | Ends September 24, 2027 |
| 80MSFC20F0155MARS-MOON EXPLORATION WITH GAMMA RAYS AND NEUTRONS (MEGANE) PHASE C/D - TASK ORDER UNDER AEROSPACE RESEARCH, DEVELOPMENT, AND ENGINEERING SUPPORT (ARDES) II CONTRACT 80MSFC20D0004 | National Aeronautics and Space Administration | LAUREL, MD-03 | $35,008,876 | Ends November 30, 2030 |
Subcontracts it reported
A prime contractor reports the subcontracts it gives under an award (first-tier subawards). These are the largest it reported under its three largest awards, from every year of each award.
Under award 80MSFC22F0048
| Subcontractor | What it is for, as reported | Amount | Date |
|---|---|---|---|
| HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC | HARDWARE BUILD | $43,221,719 | |
| LOCKHEED MARTIN CORP | SUBCONTRACT FUNDING | $42,814,869 | |
| LOCKHEED MARTIN CORPORATION | DVELOPMENTAL SUPPORT OF PHASE B | $18,450,364 | |
| LOCKHEED MARTIN CORP | SUBCONTRACT FUNDING | $9,300,000 | |
| LOCKHEED MARTIN CORP | HARDWARE | $7,138,059 | |
| LOCKHEED MARTIN CORP | SUPPORT FOR SPECIAL STUDIES | $6,556,575 | |
| LOCKHEED MARTIN CORP | DRAGONFLY PHASE B FOLLOW-ON | $6,293,196 | |
| LOCKHEED MARTIN CORP | DEVELOPMENTAL WORK | $5,500,000 | |
| LAKENHEATH ELECTRONICS DESIGN, LLC | DRAGONFLY EPS GSE FOLLOW-ON | $4,537,891 | |
| LAKENHEATH ELECTRONICS DESIGN, LLC | DESIGN OF GROUND SUPPORT EQUIPMENT | $4,537,891 |
More subcontracts are reported under this award; the 10 largest are listed.
Under award NNN10AA08T
| Subcontractor | What it is for, as reported | Amount | Date |
|---|---|---|---|
| SMITHSONIAN INSTITUTION | RESEARCH AND DEVELOPMENT | $80,889,628.86 | |
| REGENTS OF THE UNIVERSITY OF CALIFORNIA, THE | SERVICES | $614,378 | |
| REGENTS OF THE UNIVERSITY OF CALIFORNIA, THE | SERVICES | $153,588 | |
| REGENTS OF THE UNIVERSITY OF CALIFORNIA, THE | SERVICES | $153,588 | |
| ANSYS GOVERNMENT INITIATIVES, LLC | MATERIALS | $82,840 | |
| IP DATASYSTEMS INC | MATERIALS | $81,066.58 | |
| DELL FEDERAL SYSTEMS L.P | MATERIALS | $78,800 |
Under award 80MSFC21F0224
| Subcontractor | What it is for, as reported | Amount | Date |
|---|---|---|---|
| UNIVERSITY SYSTEM OF NEW HAMPSHIRE | SUBCONTRACT FUNDING | $29,905,545 | |
| UNIVERSITY SYSTEM OF NEW HAMPSHIRE | SUBCONTRACT FUNDING | $26,705,858 | |
| SOUTHWEST RESEARCH INSTITUTE | COMPLETE ELECTRONICS BOX | $5,284,579 | |
| SOUTHWEST RESEARCH INSTITUTE | ENGINEERING SERVICES | $3,596,761 | |
| SOUTHWEST RESEARCH INSTITUTE | SUBCONTRACT FUNDING | $3,037,323 | |
| SIERRA NEVADA COMPANY, LLC | IMAP | $2,964,486 | |
| UNIVERSITY SYSTEM OF NEW HAMPSHIRE | SUBCONTRACT FUNDING | $2,500,000 | |
| UNIVERSITY SYSTEM OF NEW HAMPSHIRE | DETAILED DESIGN ACTIVITIES AND SUPPORT OF INTEGRATION | $2,364,484 | |
| SOUTHWEST RESEARCH INSTITUTE | HARDWARE | $2,337,949 | |
| UNIVERSITY SYSTEM OF NEW HAMPSHIRE | SUBCONTRACT FUNDING | $1,800,000 |
More subcontracts are reported under this award; the 10 largest are listed.
Lobbying reports and campaign receipts that name this vendor
A name is matched only when it is the same name under the exact-name rule: letters and numbers alike, "&" read as "and", a leading "the" and one closing legal form (Inc, LLC, Corp, Corporation, Co, LP, LLP) set aside. A near name is never a match. Each match says which name matched.
Lobbying reports that name THE JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLC
How it matched: vendor name, exact name: the name in the lobbying report as client.
| Registrant | Client | Amount for the whole quarter | Quarter | Filed | Report |
|---|---|---|---|---|---|
| ACTUM I, LLC | THE JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLC | $100,000reported as income | Third quarter of 2026 | Open the report |
Lobbying reports that name THE JOHNS HOPKINS UNIVERSITY
How it matched: parent company name, exact name: the name in the lobbying report as client.
| Registrant | Client | Amount for the whole quarter | Quarter | Filed | Report |
|---|---|---|---|---|---|
| JOHNS HOPKINS UNIVERSITY | JOHNS HOPKINS UNIVERSITY | $340,000reported as expenses | Third quarter of 2026 | Open the report | |
| CORNERSTONE GOVERNMENT AFFAIRS, INC. | JOHNS HOPKINS UNIVERSITY | $60,000reported as income | Third quarter of 2026 | Open the report |
FEC receipts that name THE JOHNS HOPKINS UNIVERSITY as the employer
How it matched: parent company name, exact name, as the employer of itemized receipts from individuals (FEC).
- Sean Casten: 1 itemized receipt, $3,500
Only the 25 largest itemized receipts of each committee are saved, so this counts those receipts and no others. An employer is the contributor's own answer on the form.