KIK TECHNOLOGIES LLC

$1,035,351.97 in contract dollars, fiscal year 2027Confirmed from the official record
Unique Entity ID (UEI)
VPYZEPJF8G85
Parent company
KIK TECHNOLOGIES LLC (this vendor is its own parent)
Registered address
PORT ORANGE, FL, district FL-07
Other names on record
KIK TECHNOLOGIES LLC; KIK TECHNOLOGIES, LLC

Dollars are contract obligations in the fiscal year, as USAspending adds them up from each award's transactions. A contract's full value can be larger and run over several years. A figure below zero is money taken back from contracts signed earlier.

Source: USAspending.gov, the Treasury’s public record of federal spending. Our copy was saved November 16, 2026.

The largest vendors

Which agencies pay this vendor, and where the work is done

Fiscal year 2027: $1,035,351.97

Contract dollars by awarding agency, Fiscal year 2027
AgencyContract dollars
Department of Veterans Affairs$1,035,351.97
Department of Transportation$0
Contract dollars by House district, Fiscal year 2027
District where the work is doneContract dollars
VA-03Robert C. "Bobby" Scott$1,035,351.97
DC-98Eleanor Holmes Norton$0

Fiscal year 2026: $9,826,201.72

Contract dollars by awarding agency, Fiscal year 2026
AgencyContract dollars
Department of Transportation$8,775,424.20
Department of Veterans Affairs$1,050,777.52
Contract dollars by House district, Fiscal year 2026
District where the work is doneContract dollars
DC-98Eleanor Holmes Norton$4,379,508.70
FL-07Cory Mills$2,673,208.22
NY-03Thomas R. Suozzi$1,748,554.13
VA-03Robert C. "Bobby" Scott$1,050,777.52
GA-05Nikema Williams$0
WA-03Marie Gluesenkamp Perez-$253.36
IL-13Nikki Budzinski-$1,574.64
NC-02Deborah K. Ross-$2,503.32
WA-10Marilyn Strickland-$9,322.53
IL-02Robin L. Kelly-$12,193

Largest awards

The largest contract awards with activity from October 1, 2025 to September 30, 2027, by each award's total amount over its whole life. 0 rows of the answer belong to related companies and are left out.

Largest contract awards, by each award's total over its life
AwardAgencyWhere the work is doneAward totalStart
36C24625F0007INFRASTRUCTURE CABLINGDepartment of Veterans AffairsHAMPTON, VA-03$3,118,584.02Ends September 30, 2027
693JJ325F00135NTHE PURPOSE OF THIS TASK ORDER UNDER KIK IDIQ 693JJ322D00009 IS A FOLLOW ON TASK ORDER FOR THE COE BASELINE AND STENNIS TASK ORDER. THIS AWARD PROVIDES INCREMENTAL FUNDING THROUGH 10/31/2025. NEED BY: 7/1/2025 THIS AMENDMENT CORRECTS THE LINE ODepartment of TransportationFederal Highway AdministrationWASHINGTON, DC-98$3,039,781.60Ends June 30, 2026
693JJ323F00278NTHE PURPOSE OF THIS REQUISITION IS TO INITIATE THE FOLLOW-ON TASK ORDER FOR THE COE BASELINE AND STENNIS FOR KIK TECHNOLOGIES LLC CONTRACTDepartment of TransportationFederal Highway AdministrationWASHINGTON, DC-98$2,594,700.09Ends August 29, 2024
693JJ326F00117NNON-CORE TELECOMMUNICATIONS SUPPORT FOR COE/WCF/BASELINEDepartment of TransportationFederal Highway AdministrationPORT ORANGE, FL-07$2,581,389.88Ends June 30, 2027
693JK425F96009NDOT HQ DATA CENTER AUTOMATIC TRANSFER SWITCH (ATS) & TRIPPLITE-EATON POWER DISTRIBUTION UNIT (PDU) COMPLIANCE UPGRADE SUPPORT FOR THE OFFICE OF SECRETARY, OFFICE OF FINANCIAL MANAGEMENT.Department of TransportationImmediate Office of the Secretary of TransportationWASHINGTON, DC-98$2,449,483.45Ends September 30, 2026
693JJ322F00354NTHIS PURPOSE OF THIS REQUISITION IS TO ISSUE A NEW TASK ORDER UNDER KIK TECHNOLOGIES IDIQ 693JJ322D000009 FOR THE DOT'S "NON-CORE" TELECOMMUNICATION ENVIRONMENT, ITS ASSETS, AND INFRASTRUCTURE ENVIRONMENT'S O&M SUPPORT SERVICEDepartment of TransportationFederal Highway AdministrationWASHINGTON, DC-98$1,927,143.99Ends August 29, 2023
693JJ324F00319NTASK ORDER UNDER KIK TECHNOLOGIES IDIQ 693JJ322D000009 FOR WLAN UPGRADES AT DOT HQ. THIS ORDER IS A RESULT OF KIK TECHNOLOGIES' QUOTE #K0415 AND AWARDS $1,319,721.88 FOR POP OF 9/9/2024 TO 5/9/2025.Department of TransportationFederal Highway AdministrationWASHINGTON, DC-98$1,319,721.88Ends November 8, 2026
693JJ126F00110NNON-CORE TELECOM SERVICES AND MATERIALS FOR INSTALLING CABLING INFRASTRUCTURE FOR THE DOT HQ 2W/7W/8W/9W BUILD-OUT.Department of TransportationFederal Highway AdministrationWASHINGTON, DC-98$1,096,872.59Ends September 22, 2027
693JJ325F00181NTHIS IS A NEW TASK ORDER UNDER KIK TECHNOLOGIES ("KIK") IDIQ 693JJ322D000009. THIS ORDER WILL PROCURE LABOR AND MATERIALS REQUIRED TO INSTALLING THE CABLE INFRASTRUCTURE FOR THE UPGRADE OF THE CURRENT WAN/LAN/WLAN ENVIRONMENT WITHIN THE U.SDepartment of TransportationFederal Highway AdministrationWASHINGTON, DC-98$615,108.85Ends February 15, 2027
693JK425F95026NDOT CCTV SYSTEM & KIK CABLING AND ELECTRICAL LABOR (DOTHQ)Department of TransportationImmediate Office of the Secretary of TransportationWASHINGTON, DC-98$582,830.76Ends March 29, 2027
693JJ126F00066NTHE PURPOSE OF THIS AWARD IS FOR THE DOT HQ FAA 4TH & 5TH FLOOR EAST WAN/LAN BUILDOUT UNDER KIK IDIQ. THIS AMENDMENT ADDS AN ADDITIONAL CLIN FOR ELECTRICAL LABOR WORK ORDER: VCW260XXDepartment of TransportationFederal Highway AdministrationWASHINGTON, DC-98$426,915.56Ends June 25, 2027
6923G226F00074NIT INFRASTRUCTURE BUILD-OUT IN CLEVELAND HALL, UNITED STATES MERCHANT MARINE ACADEMY, KINGS POINT, NEW YORKDepartment of TransportationMaritime AdministrationGREAT NECK, NY-03$419,585.50Ends September 29, 2027
693JJ324F00275NTASK ORDER UNDER KIK IDIQ 693JJ322D000009 FOR ITS UPGRADES IN FHWA ATLANTA. THIS ORDER IS A RESULT OF KIK TECHNOLOGIES' QUOTE #RFTO K0421 AND AWARDS $417,972.16 FOR A POP OF 8/26/24 TO 4/25/25.Department of TransportationFederal Highway AdministrationATLANTA, GA-05$417,972.16Ends February 23, 2027
6923G226F00002NINSTALL AND INTEGRATE IT, DATA, AND TELECOMMUNICATIONS HARDWARE, SOFTWARE, AND ANCILLARY EQUIPMENT AT THE UNITED STATES MERCHANT MARINE ACADEMY CAMPUS BUILDINGS (A) FURUSETH HALL, SECONDARY DATA CENTER, AND (B) MURPHY HALL TELECOMMUNICATION ROOMS.Department of TransportationMaritime AdministrationGREAT NECK, NY-03$413,610.69Ends June 30, 2026
6923G226F00061NIT BUILD-OUT AT BARRY HALL, UNITED STATES MERCHANT MARINE ACADEMY (USMMA), KINGS POINT, NEW YORK TO INCLUDE RETROFIT AND STANDARDIZATION OF IT INFRASTRUCTURE, TELECOM ROOMS, AND STRUCTURED CABLING SYSTEMS.Department of TransportationMaritime AdministrationGREAT NECK, NY-03$390,889.52Ends September 29, 2027
6923G226F00059NIT BUILD-OUT OF JONES HALL AT THE UNITED STATES MERCHANT MARINE ACADEMY, KINGS POINT, NEW YORK.Department of TransportationMaritime AdministrationGREAT NECK, NY-03$389,156.74Ends September 29, 2027
693JK425F95019NDOT CCTV CABLING AND ELECTRICAL LABOR (DOTHQ)Department of TransportationImmediate Office of the Secretary of TransportationWASHINGTON, DC-98$317,330.89Ends March 7, 2027
693JJ323F00151NTHE PURPOSE OF THIS REQUISITION IS TO PROCURE UPGRADING THE FHWA VTC LAN ON THE 6TH, 7TH, AND 8TH FLOORSDepartment of TransportationFederal Highway AdministrationWASHINGTON, DC-98$299,297.31Ends December 23, 2024
693JJ323F00163NTHE PURPOSE OF THE REQUISITION IS TO ISSUE A NEW TASK ORDER UNDER KIK TECHNOLOGIES TELECOMMUNICATIONS OPERATIONS AND MAINTENANCE (O&M) IDIQ: 693JJ322D000009 FOR THE UPGRADE OF THE CURRENT (9) TELECOMMUNICATIONS ROOMS THAT SUPPORT THE CFL LAKEWODepartment of TransportationFederal Highway AdministrationWASHINGTON, DC-98$284,133.60Ends December 26, 2024
693JJ324F00226NTHE PURPOSE OF THIS REQUISITION IS TO ISSUE A NEW TASK ORDER UNDER KIK TECHNOLOGIES IDIQ 693JJ322D000009 FOR DAS O&M SUPPORT WITH ON-SITE AND REMOTE MONITORING, PREVENTATIVE MAINTENANCE, HEALTH CHECKS, SOFTWARE UPDATES, AND CELLULAR BACKUP FOR S1Department of TransportationFederal Highway AdministrationWASHINGTON, DC-98$204,782.43Ends July 25, 2027
693JJ126F00049NNEW TASK ORDER UNDER KIK TECHNOLOGIES IDIQ 693JJ322D000009. THIS ORDER PROCURES LABOR AND MATERIALS REQUIRED FOR INSTALLING CABLE INFRASTRUCTURE FOR THE UPGRADE OF THE CURRENT WAN/LAN/WLAN ENVIRONMENT WITHIN THE U.S. DEPARTMENT OF TRANSPORTATION WESTDepartment of TransportationFederal Highway AdministrationWASHINGTON, DC-98$200,971.69Ends April 26, 2027
693JJ126F00071NTHE PURPOSE OF THIS REQUEST IS TO PROCURE SERVICES FOR DOT HQ FRA/FTA WEST BUILDING 3RD FLR RECONFIGURATION. INFRASTRUCTURE BUILD-OUT PHASES 1&2Department of TransportationFederal Highway AdministrationWASHINGTON, DC-98$186,202.26Ends June 30, 2027
693JK426F95017NDOTHQ KIK REPLACEMENT OF VULNERABLE IP CAMERAS & MAILROOM HALLWAY MONITORINGDepartment of TransportationImmediate Office of the Secretary of TransportationWASHINGTON, DC-98$170,590.79Ends November 17, 2026
693JJ126F00045NNEW TASK ORDER UNDER KIK TECHNOLOGIES IDIQ 693JJ322D000009. THIS ORDER PROCURES LABOR AND MATERIALS REQUIRED FOR INSTALLING CABLE INFRASTRUCTURE FOR THE UPGRADE OF THE CURRENT WAN/LAN/WLAN ENVIRONMENTDepartment of TransportationFederal Highway AdministrationWASHINGTON, DC-98$162,842.31Ends April 23, 2027
693JJ325F00044NTHIS PR IS FOR PROCURING AND INSTALLING CABLE INFRASTRUCTURE FOR THE UPGRADE OF THE CURRENT DOT HEADQUARTERS TELEVISION DISTRIBUTIONDepartment of TransportationFederal Highway AdministrationWASHINGTON, DC-98$160,089.23Ends January 22, 2026
6923G226F00039NUSMMA INTERNAL PASSIVE WIRELESS UPGRADE ASSESSMENT SURVEY PROPOSAL $140,563.00Department of TransportationMaritime AdministrationGREAT NECK, NY-03$135,311.68Ends December 16, 2026
693JK423F95032NFAA 10A CCTV MODERNIZATION PROJECTDepartment of TransportationImmediate Office of the Secretary of TransportationWASHINGTON, DC-98$125,792.47Ends May 24, 2024
693JJ126F00031NTHE PURPOSE OF THIS PR IS TO BUILD0OUT THE IT INFRASTRUCTURE FOR FAA OFFICES ON THE 7TH AND 8TH FLOORS FOR THE MOVE TO THE DOT HEADQUARTERS EAST BUILDING. THIS PR OUTLINES FAA'S REQUEST TO HAVE KIK TECHNOLOGIES PROCURE AND INSTALL CABLE INFRASTRDepartment of TransportationFederal Highway AdministrationWASHINGTON, DC-98$121,732.55Ends March 11, 2027
693JJ323F00090NTO ISSUE A NEW TASK ORDER UNDER THE KIK TECHNOLOGIES TELECOMMUNICATIONS OPERATIONS AND MAINTENANCE IDIQ:693JJ322D000009 FOR PROCURING AND INSTALLING CABLE INFRASTRUCTURE FOR THE UPGRADE OF THE CURRENT WAN/LAN/WLAN ENVIRONMENT WITHIN THE U.S. DEPARTMEDepartment of TransportationFederal Highway AdministrationOLYMPIA, WA-10$120,835.77Ends December 15, 2023
693JJ325F00165NTHE PURPOSE OF THIS TASK ORDER IS TO PROCURE AND INSTALL THE CABLE INFRASTRUCTURE FOR THE OST HQ SPINE LEAF ARCHITECTURAL UPGRADE PHASE 2 AT DOT HEADQUARTERS UNDER KIK TECHNOLOGIES 693JJ322D000009.Department of TransportationFederal Highway AdministrationWASHINGTON, DC-98$92,253.43Ends February 3, 2027
693JK426F95039NKIK DOTHQ SERVICE CORRIDOR PACS BUILD-OUT PROJECTDepartment of TransportationImmediate Office of the Secretary of TransportationPORT ORANGE, FL-07$91,818.34Ends June 30, 2027
693JJ126F00030NTHE PURPOSE OF THIS NEW TASK ORDER IS FOR THE RENEWAL COVERAGE OF TMETRICS. THIS AMENDMENT ADDS ADDITIONAL FUNDS BASED OFF THE APPROVED QUOTE RECEIVED. TMETRICS APPLICATION PLATFORM SUPPORTS CONTACT CENTER SYSTEM AND PROVIDES MAINTENANCE, HARDWAREDepartment of TransportationFederal Highway AdministrationWASHINGTON, DC-98$90,562.25Ends March 11, 2027
693JJ126F00104NTHE PURPOSE OF THIS OF AMENDMENT IS TO INCREASE FUNDING FOR FHWA TO UPGRADE EXISTING WLAN ENVIRONMENT AT SAN JUAN, PUERTO RICO. POP 8/21/2026-8/20/2027 ASSOCIATED WO: VCW:26026Department of TransportationFederal Highway AdministrationWASHINGTON, DC-98$86,555.99Ends September 1, 2027
693JJ323F00035NTHE PURPOSE OF THIS REQUISITION IS TO ISSUE A NEW TASK ORDER UNDER THE EXISTING TELECOMMUNICATIONS OPERATIONS AND MAINTENANCE (O&M) IDIQ: 693JJ322D000009 TO PROCURE AND INSTALL CABLE INFRASTRUCTURE FOR THE RELOCATION, RETROFIT, INSTALLATION, ANDDepartment of TransportationFederal Highway AdministrationWASHINGTON, DC-98$78,578.83Ends September 22, 2023
693JJ322F00413NNEW KIK TO FOR FHWA ALBANY NETWORK CABLING INFRASTRUCTURE BUILD-OUTDepartment of TransportationFederal Highway AdministrationWASHINGTON, DC-98$72,744.57Ends September 21, 2023
693JJ324F00181NTHE PURPOSE OF THIS DELIVERY ORDER SHALL CONSIST OF FURNISHING ALL LABOR, EQUIPMENT, MATERIALS, AND SUPPLIES AS WELL AS PERFORMING ALL OPERATIONS NECESSARY TO COMPLETE THE PROPOSED NETWORK INFRASTRUCTURE INSTALLATION FOR THE UPGRADE OF THE FHWA CENTRDepartment of TransportationFederal Highway AdministrationWASHINGTON, DC-98$71,867.51Ends June 30, 2025
693JJ324F00031NTHE PURPOSE OF THIS REQUISITION IS FOR A TASK ORDER TO PROVIDE ALL NECESSARY LABOR, EQUIPMENT, MATERIALS, AND SUPPLIES, AND TO CARRY OUT ALL OPERATIONS REQUIRED FOR THE INSTALLATION, CERTIFICATION, AND UPGRADE OF A COMPLETE WIRELESS NETWORK CABLING SDepartment of TransportationFederal Highway AdministrationWASHINGTON, DC-98$66,137.03Ends August 14, 2024
693JJ126F00063NTHE PURPOSE OF THIS TASK ORDER IS TO ACQUIRE EXISTING TELECOMMUNICATIONS OPERATIONS AND MAINTENANCE (O&M), IDIQ: 693JJ322D000009 FOR THE DOT HQ CONSOLIDATION INFRASTRUCTURE DECOMMISSIONING.Department of TransportationFederal Highway AdministrationWASHINGTON, DC-98$62,558.16Ends June 30, 2027
693JJ323F00141NTHE PURPOSE OF THIS REQUISITION IS FOR A NEW KIK TASK ORDER FOR OCIO IMAGING/PREP STATIONS BUILD-OUT. THE OCIO HAS A REQUIREMENT TO PURCHASE NON-CORE TELECOMMUNICATION SUPPORT FOR CABLE BUILD-OUT AND IT SUPPORT FOR THE IMAGING/PREP STATIONS REDESIGNDepartment of TransportationFederal Highway AdministrationWASHINGTON, DC-98$56,659.45Ends June 7, 2024
693JK426F55015NNEW TASK AGAINST KIK TECHNOLOGIES LLC IDIQ# 693JJ322D000009 TO PROVIDE PHYSICAL ACCESS CONTROL SYSTEM (PACS)AND SECURITY INFRASTRUCTURE BUILD-OUT FOR THE DEPARTMENT OF TRANSPORTATION HEADQUARTERS (E87 FAA TRANSITION), AS PART OF DOT HQ CONSOLIDATIONDepartment of TransportationImmediate Office of the Secretary of TransportationWASHINGTON, DC-98$53,870.91Ends October 14, 2026

Subcontracts it reported

A prime contractor reports the subcontracts it gives under an award (first-tier subawards). These are the largest it reported under its three largest awards, from every year of each award.

No subcontract is reported under this vendor’s largest awards.

Lobbying reports and campaign receipts that name this vendor

No lobbying report, organization page or FEC receipt in our saved records has this vendor’s name or its parent company’s name.

A name is matched only when it is the same name under the exact-name rule: letters and numbers alike, "&" read as "and", a leading "the" and one closing legal form (Inc, LLC, Corp, Corporation, Co, LP, LLP) set aside. A near name is never a match. Each match says which name matched.

Suggest a tool

Suggest a tool

A person reads each idea before it appears. Links are not accepted. Do not include personal information.

See all ideas and vote