GE RENEWABLES US LLC
- Unique Entity ID (UEI)
- TWA8Z4ANM3Y4
- Parent company
- GENERAL ELECTRIC COMPANY (UEI JRZ1WHXAKBM3)
- Registered address
- GREENWOOD VILLAGE, CO, district CO-06
- Other names on record
- ALSTOM RENEWABLE US LLC
Dollars are contract obligations in the fiscal year, as USAspending adds them up from each award's transactions. A contract's full value can be larger and run over several years. A figure below zero is money taken back from contracts signed earlier.
Source: USAspending.gov, the Treasury’s public record of federal spending. Our copy was saved November 19, 2026.
Which agencies pay this vendor, and where the work is done
Fiscal year 2027
USAspending lists no contract dollars for this vendor in fiscal year 2027 yet.
Fiscal year 2026: $69,838,581.05
| Agency | Contract dollars |
|---|---|
| Department of Defense | $69,788,446.39 |
| Department of the Interior | $50,134.66 |
| District where the work is done | Contract dollars |
|---|---|
| OR-02Cliff Bentz | $68,240,903.50 |
| WA-04Dan Newhouse | $1,292,770 |
| GA-10Mike Collins | $254,772.89 |
| CA-04Mike Thompson | $50,134.66 |
| NV-01Dina Titus | $0 |
Largest awards
The largest contract awards with activity from October 1, 2025 to September 30, 2027, by each award's total amount over its whole life. 0 rows of the answer belong to related companies and are left out.
| Award | Agency | Where the work is done | Award total | Start |
|---|---|---|---|---|
| W912EF18C0001IGF::OT::IGF REPLACEMENT OF MAIN UNIT GENERATOR TURBINE RUNNERS IN UNITS 1-14 AT MCNARY DAM POWERHOUSE, UMATILLA, OREGON, INCLUDING REWIND OF 3 MAIN UNIT GENERATORS. | Department of DefenseDepartment of the Army | UMATILLA, OR-02 | $159,268,051.78 | Ends March 17, 2036 |
| W912DW22C0009CHIEF JOSEPH DAM GENERATOR REWINDS (1-16) | Department of DefenseDepartment of the Army | BRIDGEPORT, WA-04 | $54,129,215.36 | Ends January 3, 2028 |
| 140R2022C0015NEW MELONES GENERATOR REWIND | Department of the InteriorBureau of Reclamation | SONOMA, CA-04 | $30,531,326.46 | Ends May 31, 2026 |
| W9127820C0025HARTWELL REWIND UNITS 3&4 | Department of DefenseDepartment of the Army | HARTWELL, GA-10 | $22,129,646.12 | Ends September 8, 2027 |
| 140R3021F0074130 MW GENERATOR (N3) ROTOR REPAIR OR REPLACEMENT | Department of the InteriorBureau of Reclamation | BOULDER CITY, NV-01 | $4,588,194.04 | Ends October 27, 2023 |
Subcontracts it reported
A prime contractor reports the subcontracts it gives under an award (first-tier subawards). These are the largest it reported under its three largest awards, from every year of each award.
Under award W912EF18C0001
| Subcontractor | What it is for, as reported | Amount | Date |
|---|---|---|---|
| ABS MACHINING INC | MACHINE SHOPS SERVICES. | $7,640,804.40 | |
| ABS MACHINING INC | MACHINE MANUFACTURING SERVICES. | $5,507,350.71 | |
| GROUPE LAR INC | MACHINE SHOPS | $3,196,923.54 | |
| CENTRE HYDRALIQUE HYDREP | ALL OTHER MISCELLANEOUS GENERAL PURPOSE MACHINERY MANUFACTURING SERVICES. | $3,003,151.51 | |
| S.A.F.A.S. SOCIETA' AZIONARIA FONDERIA ACCIAI SPECIALI - S.P.A. | STEEL FOUNDRIES (EXCEPT INVESTMENT) | $2,619,149.22 | |
| CRC DISTRIBUTION INC | ALL OTHER PLASTICS PRODUCT MANUFACTURING | $2,603,535.62 | |
| ACADIAN INDUSTRIES | MACHINE REPAIR SERVICES. | $2,448,812.52 | |
| VOESTALPINE GIESSEREI TRAISEN GMBH & CO KG | STEEL FOUNDRIES (EXCEPT INVESTMENT) | $2,034,080.87 | |
| ABS MACHINING INC | MACHINE MANUFACTURING SERVICES. | $2,022,097.38 | |
| LIAONING FU-AN HEAVY INDUSTRY CO.,LTD | RUNNER BLADES. | $1,958,919.17 |
More subcontracts are reported under this award; the 10 largest are listed.
Under award W912DW22C0009
| Subcontractor | What it is for, as reported | Amount | Date |
|---|---|---|---|
| PREFORMED WINDINGS LIMITED | MOTOR AND GENERATOR MANUFACTURING | $7,594,793.51 | |
| ENSCICON CORP | TEMPORARY HELP SERVICES. | $2,282,500 | |
| ENSCICON CORP | U1 BASE SCOPE LABOR | $1,687,467.93 | |
| G.R.T. GENESIS INC | GROUPING FOR WEDGES, SPACERS, INSULATING SUPPORT AND M&N INSULATING PARTS | $1,495,300.08 | |
| G.R.T. GENESIS INC | GROUPING FOR WEDGES, SPACERS, INSULATING SUPPORT AND M&N INSULATING PARTS | $1,495,300.08 | |
| DELSTAR ENERGIE INC. | MANUFACTURING STATOR CONNECTIONS AND GROUPINGS | $1,251,180.78 | |
| 3075109 CANADA INC | AIR COOLER MANUFACTURING | $1,095,671.92 | |
| ALCO-TMI INC. | FABRICATED PIPE AND PIPE FITTING MANUFACTURING | $1,025,058.33 | |
| ALCO-TMI INC. | FABRICATED PIPE AND PIPE FITTING MANUFACTURING | $1,014,423.40 | |
| ALCO-TMI INC. | FABRICATED PIPE AND PIPE FITTING MANUFACTURING | $1,007,577.41 |
More subcontracts are reported under this award; the 10 largest are listed.
Under award 140R2022C0015
| Subcontractor | What it is for, as reported | Amount | Date |
|---|---|---|---|
| ENSCICON CORP | TEMPORARY HELP SERVICES | $2,316,671 | |
| ENSCICON CORP | TEMPORARY HELP SERVICES | $1,735,000 | |
| ENSCICON CORP | TEMPORARY HELP SERVICES | $781,000 | |
| ENSCICON CORP | TEMPORARY HELP SERVICES | $650,000 | |
| 9150-6584 QUEBEC INC. | CIRCUIT RING SEGMENT | $536,888.50 | |
| 9150-6584 QUEBEC INC. | CIRCUIT RING SEGMENT MACHINING | $528,026.32 | |
| ENSCICON CORP | TEMPORARY HELP SERVICES | $522,090.96 | |
| 9150-6584 QUEBEC INC. | STATOR CONNECTIONS, GROUPING FOR COPPER PARTS, MISSING NEUTRAL LEADS | $503,356.13 | |
| 9150-6584 QUEBEC INC. | ALL OTHER MISCELLANEOUS MANUFACTURING - STATOR CONNECTIONS, GROUPING, NEUTRAL LEADS | $490,358.44 | |
| ALCO-TMI INC. | FABRICATED PIPE AND PIPE FITTING MANUFACTURING | $419,255.36 |
More subcontracts are reported under this award; the 10 largest are listed.
Lobbying reports and campaign receipts that name this vendor
A name is matched only when it is the same name under the exact-name rule: letters and numbers alike, "&" read as "and", a leading "the" and one closing legal form (Inc, LLC, Corp, Corporation, Co, LP, LLP) set aside. A near name is never a match. Each match says which name matched.
Lobbying reports that name GENERAL ELECTRIC COMPANY
How it matched: parent company name, exact name: the name in the lobbying report as client.
| Registrant | Client | Amount for the whole quarter | Quarter | Filed | Report |
|---|---|---|---|---|---|
| ELEVATE GOVERNMENT AFFAIRS, LLC | GENERAL ELECTRIC COMPANY | $50,000reported as income | Third quarter of 2026 | Open the report |