CIANBRO CORPORATION
- Unique Entity ID (UEI)
- S175L3H4MKV1
- Parent company
- THE CIANBRO COMPANIES (UEI DKNUHVKSM6J3)
- Registered address
- PITTSFIELD, ME, district ME-02
- Other names on record
- None listed
Dollars are contract obligations in the fiscal year, as USAspending adds them up from each award's transactions. A contract's full value can be larger and run over several years. A figure below zero is money taken back from contracts signed earlier.
Source: USAspending.gov, the Treasury’s public record of federal spending. Our copy was saved November 19, 2026.
Which agencies pay this vendor, and where the work is done
Fiscal year 2027: $122,431
| Agency | Contract dollars |
|---|---|
| Department of the Interior | $122,431 |
| District where the work is done | Contract dollars |
|---|---|
| DC-98Eleanor Holmes Norton | $122,431 |
Fiscal year 2026: $20,606,723.26
| Agency | Contract dollars |
|---|---|
| Department of Defense | $20,606,723.26 |
| District where the work is done | Contract dollars |
|---|---|
| ME-01Chellie Pingree | $19,060,068 |
| VA-03Robert C. "Bobby" Scott | $1,915,852 |
| MD-03Sarah Elfreth | -$369,196.74 |
Largest awards
The largest contract awards with activity from October 1, 2025 to September 30, 2027, by each award's total amount over its whole life. 0 rows of the answer belong to related companies and are left out.
| Award | Agency | Where the work is done | Award total | Start |
|---|---|---|---|---|
| N4008524C0001DRY DOCK 4 REFUELING COMPLEX | Department of DefenseDepartment of the Navy | PORTSMOUTH, VA-03 | $120,316,733 | Ends July 1, 2026 |
| 140P2023C0037NAMA 318722 REHABILITATE SEAWALLS AND SHORELINE DESIGN-BUILD SOLICITATION 140P2023R0020 | Department of the InteriorDepartmental Offices | WASHINGTON, DC-98 | $112,882,431 | Ends February 1, 2027 |
| N6247025C4000PRE-CONSTRUCTION SERVICES PORTSMOUTH NAVAL SHIPYARD DRY DOCK 2 COMPLEX | Department of DefenseDepartment of the Navy | KITTERY, ME-01 | $99,859,863.96 | Ends July 21, 2027 |
| N4008022C0011SEAWALL REPAIR FARRAGUT FIELD & SANTEE BASIN, USNA, MD | Department of DefenseDepartment of the Navy | ANNAPOLIS, MD-03 | $37,159,503.26 | Ends December 31, 2024 |
| N4008523C0043BRIDGE 2 STRUCTURAL REPAIRS, PNSY, KITTERY, ME | Department of DefenseDepartment of the Navy | KITTERY, ME-01 | $14,027,431.82 | Ends July 15, 2026 |
Subcontracts it reported
A prime contractor reports the subcontracts it gives under an award (first-tier subawards). These are the largest it reported under its three largest awards, from every year of each award.
Under award N4008524C0001
| Subcontractor | What it is for, as reported | Amount | Date |
|---|---|---|---|
| WARWICK PLUMBING & HEATING CORP | PROVIDE ALL LABOR, MATERIALS, SUPERVISION, ENGINEERING AND DESIGN, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING, AND TRAINING REQUIRED FOR THE COMPLETE PLUMBING HVAC SYSTEMS AND RETRACTABLE ROOFS FOR RAIL ENCLOSURES #1 AND #2; CLEAN ENCLOSURES #1 AND #2; AS WELL AS THE MECHANICAL COMPONENTS THA | $12,353,583 | |
| DAVE STEEL CO, INC | FURNISH ALL SUBMITTALS, STRUCTURAL STEEL, AND MISCELLANEOUS STEEL FOR THE RAILCAR ENCLOSURES (RCE), CLEAN ENCLOSURES (CE), AND PASSAGEWAYS IN ACCORDANCE WITH THE PRIME CONTRACT AND PURCHASE ORDER DOCUMENTS. | $10,365,000 | |
| BLACKWATER ELECTRIC CO INC | PROVIDE ALL LABOR, MATERIALS, SUPERVISION, ENGINEERING AND DESIGN, SUBMITTALS, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING, AND TRAINING REQUIRED FOR THE ELECTRICAL SYSTEMS FOR THE RAIL ENCLOSURES #1 AND #2; CLEAN ENCLOSURES #1 AND #2; AS WELL AS THE MOCK-UP. | $4,584,885 | |
| CRANE TECHNOLOGIES GROUP, INC. | PROVIDE ALL LABOR, MATERIALS, SUPERVISION, ENGINEERING AND DESIGN, FABRICATION, DELIVERY, INSTALLATION, TESTING, INSPECTION, COMMISSIONING, AND TRAINING REQUIRED FOR THE FOUR (4) 5T SPECIAL PURPOSE SERVICE OVERHEAD ELECTRIC TRAVELING BRIDGE CRANES. | $3,026,664 | |
| PRECISION ENVIRONMENTS INC | PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND INCIDENTALS TO FURNISH AND INSTALL ALL PLASCORE WALL PANELS, CEILING PANELS AND CLEAN ROOM DOORS IN ACCORDANCE WITH THE CONTRACT DRAWINGS AND SPECIFICATIONS | $2,176,074.29 | |
| PROFESSIONALS HIR LLC | PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, AND SUPERVISION, TO FURNISH AND INSTALL STRUCTURAL CONCRETE WORK - SLABS AND RAIL BED IN-FILLS AT THE RAILCAR ENCLOSURE, SPREAD FOUNDATIONS AT THE ELEVATED PASSAGEWAYS, SLAB, TOPPING SLAB, RAIL BED-IN-FILLS, CAP EXTENSIONS, AND PIT WALL/SLAB AT THE CLEAN ENCL | $1,874,310 | |
| NICHOLSON CONSTRUCTION COMPANY | NICHOLSON CONSTRUCTION IS RESPONSIBLE FOR FURNISHING ALL DESIGN, MATERIALS, PRODUCTS, ACCESSORIES, TOOLS, EQUIPMENT, SERVICES, TRANSPORTATION, LABOR, SUPERVISION AND MANUFACTURING TECHNIQUES REQUIRED FOR DESIGN, INSTALLATION, AND TESTING OF MICROPILES, PILE ATTACHMENTS AS WELL AS COMPACTION GROUTING | $1,709,826.52 | |
| BULLOCK CONSTRUCTION INC | PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, AND SUPERVISION, TO FURNISH AND INSTALL RAILROAD TRACK AND ACCESSORIES AT THE PROJECT SITE. ALL WORK AND DELIVERABLES TO COMPLY WITH THE PRIME CONTRACT AND SUBCONTRACT DOCUMENTS. SCOPE INCLUDES, BUT IS NOT LIMITED TO, FURNISHING AND INSTALLING EPOXY ANCHORS, | $1,635,190 | |
| PROFESSIONALS HIR LLC | PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, AND INCIDENTALS TO FURNISH AND INSTALL METAL DOORS, OVERHEAD DOORS, FLOORING, AND INSULATION WORK AT THE MOCK-UP. RAILCAR AND CLEAN ENCLOSURES AT THE PROJECT SITE. | $1,526,273.46 | |
| A.R. CHESSON CONSTRUCTION COMPANY, INC. | PROVIDE ALL LABOR, EQUIPMENT, AND SUPERVISION, TO INSTALL INSULATED METAL PANELS AT THE PROJECT SITE. ALL WORK AND DELIVERABLES TO COMPLY WITH THE PRIME CONTRACT AND SUBCONTRACT DOCUMENTS, AND THE SUBCONTRACT PURCHASE ORDER. SCOPE INCLUDES, BUT IS NOT STRICTLY LIMITED TO, IMP PANEL INSTALLATION, INS | $941,724 |
More subcontracts are reported under this award; the 10 largest are listed.
Under award 140P2023C0037
| Subcontractor | What it is for, as reported | Amount | Date |
|---|---|---|---|
| MOTT MACDONALD, LLC | DESIGN AND ENGINEERING SERVICES | $7,788,122 | |
| EMPIRE LANDSCAPE, LLC | LANDSCAPING | $1,939,008.10 | |
| P & H FENCING, LLC | TEMP AND PERMANENT FENCING | $789,337 | |
| SEISMIC SURVEYS, LLC | VIBRATION MONITORING | $182,600 |
Lobbying reports and campaign receipts that name this vendor
No lobbying report, organization page or FEC receipt in our saved records has this vendor’s name or its parent company’s name.
A name is matched only when it is the same name under the exact-name rule: letters and numbers alike, "&" read as "and", a leading "the" and one closing legal form (Inc, LLC, Corp, Corporation, Co, LP, LLP) set aside. A near name is never a match. Each match says which name matched.