ECLIPSE COMPANIES, LLC
- Unique Entity ID (UEI)
- RMCMTCKHMFH9
- Parent company
- ECLIPSE COMPANIES, LLC (this vendor is its own parent)
- Registered address
- CHAGRIN FALLS, OH, district OH-14
- Other names on record
- ECLIPSE COMPANIES LLC; ECLIPSE COMPANIES LLC
Dollars are contract obligations in the fiscal year, as USAspending adds them up from each award's transactions. A contract's full value can be larger and run over several years. A figure below zero is money taken back from contracts signed earlier.
Source: USAspending.gov, the Treasury’s public record of federal spending. Our copy was saved November 16, 2026.
Which agencies pay this vendor, and where the work is done
Fiscal year 2027: $0
| Agency | Contract dollars |
|---|---|
| Department of Transportation | $0 |
| District where the work is done | Contract dollars |
|---|---|
| GA-06Lucy McBath | $0 |
| IN-01Frank J. Mrvan | $0 |
| MS-03Michael Guest | $0 |
Fiscal year 2026: $57,759,817.99
| Agency | Contract dollars |
|---|---|
| Department of Transportation | $57,759,817.99 |
| Department of Agriculture | $0 |
| Department of Defense | $0 |
| District where the work is done | Contract dollars |
|---|---|
| NC-11Chuck Edwards | $48,709,374.74 |
| AR-04Bruce Westerman | $5,734,999.50 |
| AR-02J. French Hill | $2,144,404.76 |
| TN-01Diana Harshbarger | $1,189,000 |
| GA-06Lucy McBath | $98,772.90 |
| KY-02Brett Guthrie | $93,291 |
| MS-01Trent Kelly | $0 |
| AL-02Shomari Figures | $0 |
| KY-05Harold Rogers | $0 |
| LA-02Troy A. Carter | $0 |
| NH-02Maggie Goodlander | $0 |
| PA-08Robert P. Bresnahan, Jr. | $0 |
| TN-07Matt Van Epps | $0 |
| MS-03Michael Guest | -$210,024.91 |
Largest awards
The largest contract awards with activity from October 1, 2025 to September 30, 2027, by each award's total amount over its whole life. 0 rows of the answer belong to related companies and are left out.
| Award | Agency | Where the work is done | Award total | Start |
|---|---|---|---|---|
| 693C7326F00012NPROJECT NC NP BLRI 2M31; NC NP BLRI 2N24; NC NP BLRI 2M26, 2N22: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 344.3 TO 351.9. THE WORK INCLUDES SLIDE REPAIRS, CULVERT CLEANING, CULVERT INSTALLATION, STONE MASONRY HEADWALL INSTALLATION, D | Department of TransportationFederal Highway Administration | OLD FORT, NC-11 | $29,755,767.56 | Ends June 21, 2027 |
| 693C7326F00006NPROJECT NC NP BLRI 2M28; NC NP BLRI 2M29: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 336.7, 336.75, 336.85, 336.95, 337.2, 338.2 AND MP 338.4. THE WORK INCLUDES SLIDE REPAIRS, CULVERT CLEANING, CULVERT INSTALLATION, STONE MASONRY HEADWAL | Department of TransportationFederal Highway Administration | SPRUCE PINE, NC-11 | $18,953,607.61 | Ends June 21, 2027 |
| 693C7326F00001NAR ERFO FS OZSTF810 2022-1(1): THE PROJECT CONSISTS OF THE PERMANENT SLIDE REPAIR OF WHITE ROCK ROAD (NFSR 1003) AND EAST FLY GAP ROAD (NFSR 1503). THE WORK INCLUDES ROADWAY RECONSTRUCTION AND RECONDITIONING, EMBANKMENT STABILIZATION, CULVERT REPLAC | Department of TransportationFederal Highway Administration | ALIX, AR-04 | $5,734,999.50 | Ends May 10, 2027 |
| 693C7325F00037NPROJECT NC ERFO NP BLRI 2024-1(4) THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN | Department of TransportationFederal Highway Administration | CANTON, NC-11 | $3,777,134.10 | Ends June 30, 2027 |
| 693C7325F00006NPROJECT MS NP NATR 3P28: THE PROJECT CONSISTS OF MILLING AND ROAD OVERLAY OF ACCESS RAMPS TO INTERSTATE 55. THE WORK ALSO INCLUDES BRIDGE REPAIR, SIGNING, PAVEMENT STRIPING AND OTHER MISCELLANEOUS WORK. | Department of TransportationFederal Highway Administration | MADISON, MS-03 | $3,088,624.78 | Ends September 25, 2025 |
| 693C7323F00012NPROJECT NP-CHAT 102(1), 906(1), 907(1), 908(1): THE PROJECT CONSISTS OF REHABILITATION/RECONSTRUCTION OF THE ROADWAY AND PARKING AREAS, MILLING AND ASPHALT OVERLAY, INSTALLATION OF NEW SIGNS, PAVEMENT MARKING, DEVELOPMENT AND IMPLEMENTATION OF A TRA | Department of TransportationFederal Highway Administration | MARIETTA, GA-06 | $3,063,807.45 | Ends May 7, 2026 |
| 693C7325F00044NPROJECT TN ERFO FS CHRKE804 2020-1(1) THE PROJECT CONSISTS OF REPAIRS TO ROCKY TOP ROAD (FS 402) FOR A LENGTH OF 3.43 MILES, INCLUDING ROADWAY AND DITCH RECONDITIONING, AGGREGATE SURFACING, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK. | Department of TransportationFederal Highway Administration | DEL RIO, TN-01 | $2,754,992.15 | Ends October 31, 2027 |
| 693C7326F00036NPROJECT AR FW BLD 11(1): THE PROJECT CONSISTS OF ROADWAY RECONSTRUCTION AND RESURFACING OF GRANARY SOUTH ROAD (ROUTE 011). THE WORK INCLUDES BANK STABILIZATION, AGGREGATE BASE (LIMESTONE), AGGREGATE SURFACE COURSE (LIMESTONE), PIPE CULVERT REPLACEME | Department of TransportationFederal Highway Administration | JUDSONIA, AR-02 | $2,144,404.76 | Ends March 9, 2027 |
| 693C7325F00105NPROJECT TN NP GRSM 10N(5) THE PROJECT CONSISTS OF REPAIRING STORM DAMAGE ON NEWFOUND GAP ROAD WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES CONSTRUCTING A REINFORCED ROCKERY WALL, CONSTRUCTING AN AGGREGATE-TOPSOIL COURSE SHOULD | Department of TransportationFederal Highway Administration | GATLINBURG, TN-01 | $2,072,575 | Ends May 31, 2027 |
| 693C7325F00108NKY NP MACA 16(1), 200(1): THE PROJECT CONSISTS OF RECONFIGURATION OF THE INTERSECTION OF CAVE CITY ROAD AND FROZEN NIAGARA ROAD. THE WORK INCLUDES INTERSECTION AND ROADWAY REALIGNMENT, ROADWAY OBLITERATION, CLEARING AND GRUBBING, DRAINAGE IMPROVEMEN | Department of TransportationFederal Highway Administration | MAMMOTH CAVE, KY-02 | $1,729,584.48 | Ends January 21, 2027 |
| W912EE24C0014MDHP RP-18-03, CONSTRUCTION OF FIVE RISER PIPE GRADE CONTROL STRUCTURES. | Department of DefenseDepartment of the Army | CALHOUN CITY, MS-01 | $1,659,000 | Ends September 28, 2029 |
| 693C7326F00073NPROJECT TN ERFO FS CHRKE804 2021-1(1): THE PROJECT CONSISTS OF REPAIRING STORM AND FLOOD DAMAGE ON HURRICANE GAP ROAD (FS 31). THE SCOPE OF WORK INCLUDES DESIGN SERVICES, SLOPE STABILIZATION, ROADWAY RECONSTRUCTION, ASPHALT CONCRETE PAVEMENT, AND OT | Department of TransportationFederal Highway Administration | GREENEVILLE, TN-01 | $1,189,000 | Ends November 22, 2027 |
| 693C7325F00119NKY NP CUGA BRG(1) THE WORK INCLUDES REPLACING SUPERSTRUCTURE, CLEANING AND PAINTING RUSTED AREAS OF STEEL ARCH ALONG THE FOUNDATIONS, REMOVING FLOOD DEBRIS AND FALLEN TREES, REPAIRING SCOUR ALONG FOUNDATIONS, MILL AND OVERLAY OF BRIDGE APPROACHES, A | Department of TransportationFederal Highway Administration | MIDDLESBORO, KY-05 | $1,146,990.50 | Ends August 31, 2028 |
| 693C7325F00027NPROJECT PA ERFO FW CHV 2020-1(1): THE PROJECT CONSISTS OF THE REHABILITATION OF BACK NINE TRAIL, RIDGE NATURE TRAIL AND RIDGE NATURE PARKING AREA. THE WORK INCLUDES REMOVING AND REPLACING ASPHALT CONCRETE PAVEMENT, ROADWAY EXCAVATION, ROADBED RECOND | Department of TransportationFederal Highway Administration | STROUDSBURG, PA-08 | $961,796.59 | Ends July 31, 2027 |
| 693C7324F00062NPROJECT: MS NP NATR BMS FY23(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 14 BRIDGES ALONG THE NATCHEZ TRACE PARKWAY. THE WORK INCLUDES THE REPAIR OF DETERIORATED EXPANSION JOINTS, CLEANING AND RESEALING JOINTS, CONCRETE REP | Department of TransportationFederal Highway Administration | COLLINWOOD, TN-07 | $916,875.10 | Ends October 31, 2027 |
| 693C7325F00111NTHE PROJECT CONSISTS OF THE RECONSTRUCTION OF HATCHERY ENTRANCE ROAD (ROUTE 010), VISITOR OVERFLOW PARKING (ROUTE 900), VISITOR PARKING (ROUTE 903), AND 301AZ WITHIN THE NASHUA NATIONAL FISH HATCHERY. THE WORK INCLUDES ROADWAY EXCAVATION, AGGREGATE B | Department of TransportationFederal Highway Administration | NASHUA, NH-02 | $716,733 | Ends December 31, 2027 |
| 693C7325F00043NPROJECT MS NP NATR BMS FY24(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 14 BRIDGES ALONG THE NATCHEZ TRACE PARKWAY. THE WORK INCLUDES THE REPAIR OF DETERIORATED EXPANSION JOINTS, CLEANING AND RESEALING JOINTS, CONCRETE REPA | Department of TransportationFederal Highway Administration | PONTOTOC, MS-01 | $529,912 | Ends February 28, 2028 |
| 693C7322F00067NPROJECT IN NP INDU 0945(2): THE PROJECT CONSISTS OF BRIDGE SUPERSTRUCTURE REMOVAL, TEMPORARY TRAFFIC CONTROL, AND OTHER MISCELLANEOUS WORK. | Department of TransportationFederal Highway Administration | CEDAR LAKE, IN-01 | $398,739.40 | Ends May 1, 2023 |
| 693C7325F00005NPROJECT LA NP JELA 7530-001P THE PROJECT CONSISTS OF THE REHABILITATION OF STRUCTURE 7530-001P OVER BAYOU DES FAMILLES IN THE JEAN LAFITTE NATIONAL HISTORICAL PARK AND PRESERVE. THE WORK INCLUDES PERFORMING DESIGN SERVICES, REMOVING AND REPLACING BR | Department of TransportationFederal Highway Administration | MARRERO, LA-02 | $270,460 | Ends October 29, 2025 |
| 12445225F0055NRE-2926, DOGE APPROVED 7/15 080109 RHELM CON ROAD MAINTENANCE CONTRACT | Department of AgricultureForest Service | MONTGOMERY, AL-02 | $206,714.60 | Ends September 19, 2026 |
Subcontracts it reported
A prime contractor reports the subcontracts it gives under an award (first-tier subawards). These are the largest it reported under its three largest awards, from every year of each award.
No subcontract is reported under this vendor’s largest awards.
Lobbying reports and campaign receipts that name this vendor
No lobbying report, organization page or FEC receipt in our saved records has this vendor’s name or its parent company’s name.
A name is matched only when it is the same name under the exact-name rule: letters and numbers alike, "&" read as "and", a leading "the" and one closing legal form (Inc, LLC, Corp, Corporation, Co, LP, LLP) set aside. A near name is never a match. Each match says which name matched.