Money · Federal contracts

DEFENSE SYSTEMS AND SOLUTIONS

$1,164,330,947.98 in contract dollars, fiscal year 2026Confirmed from the official record
Unique Entity ID (UEI)
NWKQVQED4C81
Parent company
DEFENSE SYSTEMS AND SOLUTIONS (this vendor is its own parent)
Registered address
HUNTSVILLE, AL, district AL-05
Other names on record
None listed

Dollars are contract obligations in the fiscal year, as USAspending adds them up from each award's transactions. A contract's full value can be larger and run over several years. A figure below zero is money taken back from contracts signed earlier.

Source: USAspending.gov, the Treasury’s public record of federal spending. Our copy was saved November 19, 2026.

The largest vendors

Which agencies pay this vendor, and where the work is done

Fiscal year 2027

USAspending lists no contract dollars for this vendor in fiscal year 2027 yet.

Fiscal year 2026: $1,164,330,947.98

Contract dollars by awarding agency, Fiscal year 2026
AgencyContract dollars
Department of Defense$1,164,330,947.98
Contract dollars by House district, Fiscal year 2026
District where the work is doneContract dollars
AL-05Dale W. Strong$1,164,330,947.98

Largest awards

The largest contract awards with activity from October 1, 2025 to September 30, 2027, by each award's total amount over its whole life. 0 rows of the answer belong to related companies and are left out.

Largest contract awards, by each award's total over its life
AwardAgencyWhere the work is doneAward totalStart
W58RGZ19F0163THIS EFFORT IS TO PROVIDE PRODUCTION-REPRESENTATIVE HARDWARE KITS AND CORRESPONDING PRODUCTION SUPPORT FOR THE UH-60V PROGRAM.Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$220,430,020Ends November 30, 2027
W58RGZ23F0140REQUIREMENT TO PROVIDE FOR THE PERSONNEL, MATERIALS, FACILITIES, SERVICES, AND SUPPORT REQUIRED TO DESIGN, MODIFY, VERIFY, AND DOCUMENT SYSTEM PERFORMANCE AND AIRWORTHINESS TO DELIVER UH-60M AIRCRAFT FOR THE COMMONWEALTH OF AUSTRALIA.Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$149,605,186Ends February 28, 2031
W58RGZ24F0429V-22 MANAGEMENT.Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$134,093,627Ends February 11, 2031
W58RGZ23F0154MV-22 INVENTORY MANAGEMENT SUPPORT.Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$115,424,621Ends January 7, 2030
W58RGZ25F0212PERSONNEL, MATERIALS, FACILITIES, AND SERVICES REQUIRED TO PROCURE THE MODIFICATION KITS FOR UH-60M AIRCRAFT IN THE UNIQUE GREECE HELLENIC ARMY CONFIGURATION AND SHORT-TERM STORAGE FOR TWELVE (12) AIRCRAFT FOR UP TO SIX (6) MONTHS.Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$69,611,948Ends January 29, 2029
W58RGZ26F0026CONTRACTOR SUPPORT TO DELIVER REPUBLIC OF KOREA (ROK) CH-47F MULTIYEAR-TWO (MYII) BLOCK I AIRCRAFT.Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$49,753,729Ends December 31, 2029
W58RGZ25F0233BRAZIL UH-60M ACCELERATED AIRCRAFTDepartment of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$48,057,094Ends May 25, 2030
W58RGZ25F0413GAM 67 USDepartment of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$48,020,476Ends September 29, 2028
W58RGZ26F0135PERSONNEL, MATERIALS, FACILITIES, AND SERVICES REQUIRED TO PROCURE SELECTED COMPONENTS FOR UH-60M AIRCRAFT IN THE UNIQUE AUSTRIA CONFIGURATION AS DEFINEDDepartment of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$44,784,262Ends August 31, 2031
W58RGZ23F0423THE UNITED STATES AIR FORCE HAS A REQUIREMENT TO PROVIDE FIRST ARTICLE PROTOTYPES TO SUPPORT THE COMMON MUNITIONS BUILT-IN-TEST REPROGRAMMING EQUIPMENT CYBER ENHANCED EFFORT. KIT AND MISSION PROGRAMMER TO TEST AND REPROGRAM CAPABILITY OF MUNITIONS.Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$43,383,587Ends July 31, 2028
W58RGZ21F0253THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE PRODUCTION-REPRESENTATIVE HARDWARE KITS AND CORRESPONDING PRODUCTION SUPPORT FOR THE UH-60V PROGRAM. THE EFFORT INCLUDES A BASE EFFORT AND FOUR (4) OPTIONS.Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$38,756,793.19Ends March 31, 2027
W58RGZ26F0351PROVIDE SHOP SET SUPPORT IN SUPPORT OF AVIATION MISSION SYSTEMS AND ARCHITECTUREDepartment of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$37,916,608Ends July 22, 2029
W58RGZ26F0138DEFINES THE LOGISTICS, OPERATIONAL, TRAINING, AND MODIFICATION WORK ORDER (MWO) APPLICATION REQUIREMENTS FOR THE TECHNICAL SUPPORT SERVICES REQUIREMENTS OF UNITED ARAB EMIRATES (UAE) FOREIGN MILITARY SALES.Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$37,434,881Ends January 21, 2031
W58RGZ26F0352PROVIDE SHOP SET SUPPORT IN SUPPORT OF AVIATION MISSION SYSTEMS AND ARCHITECTURE (AMSA) FY 2026 FOREIGN MILITARY SALES (FMS).Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$35,467,737Ends July 20, 2029
W58RGZ25F0414GAM 67 US- CONTROL SECTIONDepartment of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$34,552,520Ends September 29, 2028
W58RGZ26F0343PROVIDE SHOP SET SUPPORT IN SUPPORT OF AVIATION MISSION SYSTEMS AND ARCHITECTURE (AMSA) FY 2026 FOREIGN MILITARY SALES (FMS).Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$34,142,370.50Ends July 22, 2029
W58RGZ25F0317PROVIDE APACHE SUPPORT KITS AND A SPARES PACKAGE FOR FOREIGN MILITARY SALES (FMS) POLAND.Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$34,095,220Ends May 9, 2029
W58RGZ25F0415SUPPORT THE GAM 67 US MISSILE DEVELOPMENT PROGRAM BEING EXECUTED BY THE AVIATION AND MISSILE CENTER AVMC ON BEHALF OF THE UNITED STATES AIR FORCE USAF AND THE OFFICE OF SECRETARY OF DEFENSE POLICY OSD-P.Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$33,672,805Ends September 30, 2028
W58RGZ22F0212PERSONNEL, MATERIALS, FACILITIES, AND SERVICES REQUIRED TO MODIFY, VERIFY, DOCUMENT, AND DELIVER UH-60M AIRCRAFT IN THE UNIQUE REPUBLIC OF LITHUANIA CONFIGURATION.Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$33,329,596Ends June 30, 2027
W58RGZ19F0483THE STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE MODERNIZATION AND FIELDING OF THE PITOT STATIC TEST SYSTEM (PSTS).Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$30,766,053.28Ends October 30, 2024
W58RGZ23F0374INTEGRATION OF KITS FOR ATTACK HELICOPTERS.Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$29,062,023Ends April 30, 2028
W58RGZ23F0376REQUIRED TO PROVIDE APACHE SUPPORT KITS AND A SPARES PACKAGE FOR FOREIGN MILITARY SALES (FMS) AUSTRALIA AND EGYPTDepartment of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$28,245,960Ends June 24, 2027
W58RGZ22F0274DEFINES THE REQUIREMENT TO MODIFY, VERIFY, DOCUMENT, AND DELIVER UH-60M AIRCRAFT IN THE JORDAN-UNIQUE CONFIGURATIONDepartment of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$27,518,428Ends March 31, 2029
W58RGZ23F0091AIRCRAFT SURVIVABILITY PRODUCT IMPROVEMENT (ASPI) AND APACHE SUPPORT.Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$27,450,626.52Ends April 30, 2027
W58RGZ26F0258NGB AIRCRAFT KITS AND INTEGRATIONDepartment of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$26,775,112Ends July 31, 2029
W58RGZ19F0650THIS STATEMENT OF WORK DEFINES THE EFFORT REQUIRED TO DEVELOP AND DELIVER THE TECHNICAL DATA TIME COMPLIANCE TECHNICAL ORDERS TCTOS ENGINEERING AND PROVISIONING RELATING TO THE ESTS AND ALLOW THE UPGRADE OF THE ESTS TO A31U182403 AND A31U182404Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$26,260,272Ends September 15, 2026
W58RGZ25F0302BALTICS COMMAND AND CONTROL SHELTER.Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$25,528,409Ends August 20, 2028
W58RGZ24F0078MV-22 STORAGE AND MAINTENANCE.Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$24,644,014Ends March 24, 2027
W58RGZ23F0135UH60A DOS EPMI AND MOD PROGRAMDepartment of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$23,876,893Ends July 31, 2027
W58RGZ22F0359C-130 IMPROVED MODULAR AIRBORNE FIRE FIGHTING SYSTEM (IMAFFS) PHASE IV.Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$23,339,041Ends February 1, 2028
W58RGZ24F0206APACHE MISSION SUPPORT.Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$20,593,531.72Ends July 1, 2027
W58RGZ19F0484THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE INTEGRATION OF VERSION IV AH-64E (IMPROVED) MODIFICATION KITS, AIRCRAFT COMPONENTS/HARDWARE, AND INSPECTION/REPAIR OF AIRCRAFT PARTS.Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$20,455,845.06Ends October 31, 2024
W58RGZ20F0159REQUIRED FOR THE DESIGN, ENGINEERING, INTEGRATION, AND TESTS ASSOCIATED WITH THE AIR GROUND NETWORKING RADIO (AGNR) INTEGRATION TO THE UH/HH 60M HELICOPTERDepartment of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$20,280,344Ends October 31, 2026
W58RGZ20F0474REQUEST FOR NEW ORDER UNDER CONTRACT W58RGZ-18-D-0001, MULTI-FUNCTION CONTROL UNIT INTEGRATION FOR UH-60M/HH-60M AIRCRAFT.Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$20,183,280Ends August 1, 2027
W58RGZ25F0345UAS INTERNATIONAL UNCREWED AIRCRAFT SYSTEM FMS (FOREIGN MILITARY SALES) GHANA (PB-B-WLK), NIGERIA (PB-B-WMB), BULGARIA (PB-B-VLN), LITHUANIA (LH-B-UAG), AND SEYCHELLES (PB-B-VLI)Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$19,249,069Ends July 29, 2028
W58RGZ25F0075CH-47F NEW EQUIPMENT TRAINING (NET) AND TECHNICAL SUPPORTDepartment of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$18,641,682.01Ends June 26, 2029
W58RGZ23F0068COMMON INFRARED COUNTERMEASURE (CIRCM) & BLUE FORCE TRACKER (BFT) 2.Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$18,294,162Ends June 16, 2027
W58RGZ24F0015C-130 IMPROVED MODULAR AIRBORNE FIRE FIGHTING SYSTEM (IMAFFS) PHASE V.Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$18,143,898Ends July 16, 2028
W58RGZ23F0156COMMON FIRE CONTROL SYSTEM (CFCS) LAUNCH ADAPTER GROUP (LAG).Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$18,109,739Ends November 30, 2027
W58RGZ25F0078TREX T&I.Department of DefenseDepartment of the ArmyHUNTSVILLE, AL-05$17,795,375Ends December 15, 2026

Subcontracts it reported

A prime contractor reports the subcontracts it gives under an award (first-tier subawards). These are the largest it reported under its three largest awards, from every year of each award.

Under award W58RGZ19F0163

Subcontracts reported under award W58RGZ19F0163
SubcontractorWhat it is for, as reportedAmountDate
NORTHROP GRUMMAN SYSTEMS CORPORATIONUH-60V LRIP$19,180,481
NORTHROP GRUMMAN SYSTEMS CORPORATIONUH-60V LRIP (B-KITS CPFF BASE)$16,237,371
NORTHROP GRUMMAN SYSTEMS CORPORATIONUH-60V LOW RATE INITIAL PRODUCTION (LRIP)$12,934,246
NORTHROP GRUMMAN SYSTEMS CORPORATIONUH-60V LOW RATE INITIAL PRODUCTION (LRIP)$12,934,246
NORTHROP GRUMMAN SYSTEMS CORPORATIONUH-60V LRIP B-KITS$12,730,279
NORTHROP GRUMMAN SYSTEMS CORPORATIONUH-60V LOW RATE INITIAL PRODUCTION$12,600,996
NORTHROP GRUMMAN SYSTEMS CORPORATIONUH-60V LOW RATE INITIAL PRODUCTION (LRIP)$8,833,780
NORTHROP GRUMMAN SYSTEMS CORPORATIONUH-60 LRIP REV G$4,343,736
TELEDYNE FLIR DEFENSE, INC.MATERIALS IN SUPPORT OF PRIME CONTRACT W58RGZ-18-D-0001 FOR THE PROTOTYPE INTEGRATION FACILITY (PIF) AT REDSTONE ARSENAL, ALABAMA.​$1,647,904
NORTHROP GRUMMAN SYSTEMS CORPORATIONUH-60V LRIP, REV F, DATED 27 APRIL 2022$1,437,574

More subcontracts are reported under this award; the 10 largest are listed.

Under award W58RGZ23F0140

Subcontracts reported under award W58RGZ23F0140
SubcontractorWhat it is for, as reportedAmountDate
DILLON AERO, INC.MATERIALS IN SUPPORT OF THE REFERENCED PRIME CONTRACT.$6,454,066.98
BREEZE-EASTERN LLCMATERIALS IN SUPPORT OF THE DSS CONTRACT.$4,690,580.64
BREEZE-EASTERN LLCMATERIALS IN SUPPORT OF THE DSS CONTRACT.$3,101,856
MARTIN-BAKER AMERICA INCMATERIALS IN SUPPORT OF THE DSS CONTRACT.$1,955,131.88
HONEYWELL INTERNATIONAL, INCMATEIALSIN SUPPORT OF THE DSS CONTRACT.$1,850,603.17
ACQUISITION INTEGRATION LLCMATERIALS IN SUPPORT OF THE DSS CONTRACT.$1,440,000
POINT BLANK ENTERPRISES, INC.MATERIALS IN UPPORT OF THE DSS CONTRACT.$1,398,041.92
MARTIN-BAKER AMERICA INCMATERIALS IN SUPPORTOF THE DSS CONTRACT.$1,203,158.08
DONALDSON COMPANY, INC.MATERIALS IN SUPPORT OF THE REFERENCED PRIME CONTRACT.$1,105,670.28
DONALDSON COMPANY, INC.MATERIALS IN SUPPORT OF THE REFERENCED PRIME CONTRACT.$1,060,086.60

More subcontracts are reported under this award; the 10 largest are listed.

Under award W58RGZ24F0429

Subcontracts reported under award W58RGZ24F0429
SubcontractorWhat it is for, as reportedAmountDate
THE BOEING COMPANYMATERIALS IN SUPPORT OF PRIME CONTRACT W58RGZ-18-D-0001 FOR THE PROTOTYPE INTEGRATION FACILITY (PIF) AT REDSTONE ARSENAL, ALABAMA.$6,511,444.20
ELBITAMERICA, INC.MATERIALS INSUPPORT OF THE DSS CONTRACT.$5,632,421.47
SAFRAN ELECTRICAL AND POWER USA, LLCMATERIALS IN SUPPORT OF THE DSS CONTRACT$4,300,289.92
ELBITAMERICA, INC.MATERIALS IN SUPPORT OF THE REFERENCED PRIME CONTRACT.$3,705,913
SAFRAN ELECTRICAL AND POWER USA, LLCMATERIALS IN SUPPORT OF THE REFERENCED PRIME CONTRACT.$3,478,020.90
S3 AERODEFENSE LLCMATERIALS IN SUPPORT OF THE DSS CONTRACT$3,346,096.68
ELBITAMERICA, INC.MATERIALS IN SUPPORT OF PRIME CONTRACT W58RGZ-18-D-0001 FOR THE PROTOTYPE INTEGRATION FACILITY (PIF) AT REDSTONE ARSENAL, ALABAMA.​$3,071,275.89
SAFRAN ELECTRICAL & POWER USA, LLCMATERIALS IN SUPPORT OF THE REFERENCED PRIME CONTRACT.$2,964,913.61
S3 AERODEFENSE LLCMATERIALS IN SUPPORT OF THE REFERENCED PRIME CONTRACT.$2,561,034.96
SENIOR UK LIMITEDMATERIALS IN SUPPORT OF THE REFERENCED PRIME CONTRACT.$2,135,020.03

More subcontracts are reported under this award; the 10 largest are listed.

Lobbying reports and campaign receipts that name this vendor

No lobbying report, organization page or FEC receipt in our saved records has this vendor’s name or its parent company’s name.

A name is matched only when it is the same name under the exact-name rule: letters and numbers alike, "&" read as "and", a leading "the" and one closing legal form (Inc, LLC, Corp, Corporation, Co, LP, LLP) set aside. A near name is never a match. Each match says which name matched.

Suggest a tool

Suggest a tool

A person reads each idea before it appears. Links are not accepted. Do not include personal information.

See all ideas and vote