ARCADIS U.S., INC.
- Unique Entity ID (UEI)
- MNG1DTKJ1LZ3
- Parent company
- ARCADIS N.V. (UEI E5KJTZ64SP97)
- Registered address
- HIGHLANDS RANCH, CO, district CO-04
- Other names on record
- ARCADIS G&M INCORPORATED; ARCADIS G&M, INC; ARCADIS G&M, INC.; ARCADIS U S INC; ARCADIS U.S. INC.; ARCADIS US INCORPORATED; G & M ARCADIS
Dollars are contract obligations in the fiscal year, as USAspending adds them up from each award's transactions. A contract's full value can be larger and run over several years. A figure below zero is money taken back from contracts signed earlier.
Source: USAspending.gov, the Treasury’s public record of federal spending. Our copy was saved November 17, 2026.
Which agencies pay this vendor, and where the work is done
Fiscal year 2027: $926,609
| Agency | Contract dollars |
|---|---|
| Department of Defense | $926,609 |
| District where the work is done | Contract dollars |
|---|---|
| NJ-05Josh Gottheimer | $926,609 |
Fiscal year 2026: $9,458,689.89
| Agency | Contract dollars |
|---|---|
| Department of Defense | $5,221,943.89 |
| Department of Homeland Security | $2,830,347 |
| Department of State | $1,353,894 |
| Consumer Product Safety Commission | $36,991 |
| Department of Commerce | $15,514 |
| District where the work is done | Contract dollars |
|---|---|
| NJ-05Josh Gottheimer | $2,384,074.95 |
| TX-34Vicente Gonzalez | $1,353,894 |
| CO-04Lauren Boebert | $1,268,306.46 |
| LA-01Steve Scalise | $1,208,322.71 |
| NC-01Donald G. Davis | $1,044,226 |
| SC-02Joe Wilson | $1,001,463 |
| AK-00Nicholas J. Begich III | $727,513 |
| TX-30Jasmine Crockett | $542,861.20 |
| VA-01Robert J. Wittman | $471,280 |
| NC-02Deborah K. Ross | $390,338 |
| NJ-12Bonnie Watson Coleman | $285,177 |
| MD-07Kweisi Mfume | $264,925 |
| MS-02Bennie G. Thompson | $260,859.28 |
| KS-03Sharice Davids | $204,742 |
| AR-01Eric A. "Rick" Crawford | $185,502.34 |
| NJ-01Donald Norcross | $167,019.18 |
| NY-26Timothy M. Kennedy | $146,859 |
| FL-24Frederica S. Wilson | $127,620 |
| CA-02Jared Huffman | $47,924 |
| RI-02Seth Magaziner | $38,938.49 |
| MD-08Jamie Raskin | $36,991 |
| MD-06April McClain Delaney | $15,514 |
| WA-07Pramila Jayapal | $2,500 |
| DC-98Eleanor Holmes Norton | $0 |
| TX-16Veronica Escobar | $0 |
| TX-23 | $0 |
| CA-12Lateefah Simon | $0 |
| NC-07David Rouzer | $0 |
| NJ-02Jefferson Van Drew | $0 |
| VA-03Robert C. "Bobby" Scott | $0 |
| PR-98Pablo José Hernández | -$2,718,160.72 |
Largest awards
The largest contract awards with activity from October 1, 2025 to September 30, 2027, by each award's total amount over its whole life. 0 rows of the answer belong to related companies and are left out.
| Award | Agency | Where the work is done | Award total | Start |
|---|---|---|---|---|
| W912DQ21F3052ARCHITECT AND ENGINEERING SERVICES FOR PROPERTY INVESTIGATIONS AND REMEDIAL DESIGNS FOR WELSBACH/GENERAL GAS MANTLE SUPERFUND SITE IN CAMDEN & GLOUSCESTER CITY, NJ | Department of DefenseDepartment of the Army | FAIR LAWN, NJ-05 | $15,727,531 | Ends February 28, 2027 |
| 0002IGF::OT::IGF THE CONTRACTOR SHALL PERFORM ALL THE NECESSARY WORK AND SERVICES IN PERFORMING A REMEDIAL DESIGN AND RELATED STUDIES FOR THE WELSBACH&GENERAL GAS MANTLE SUPERFUND SITE, CAMDEN AND GLOUCESTER CITY, NEW JERSEY IN ACCORDANCE WITH THE SCOPE OF WORK DATED 08 SEPTEMBER 2015. | Department of DefenseDepartment of the Army | FAIR LAWN, NJ-05 | $13,153,304.95 | Ends September 15, 2021 |
| HSCCG8307J3CL158GROUNDWATER MONITORING | Department of Homeland SecurityU.S. Coast Guard | ELIZABETH CITY, NC-01 | $11,616,700 | Ends April 1, 2008 |
| W912EP19F0095MAIN CHANNEL DESIGN CONTRACT NO. 2D/2E | Department of DefenseDepartment of the Army | SAN JUAN, PR-98 | $7,360,521.63 | Ends July 31, 2026 |
| W9124J24F0138PBA FOR RESTORATION SIRES AT FORT JACKSON, SC | Department of DefenseDepartment of the Army | COLUMBIA, SC-02 | $5,877,695 | Ends September 26, 2029 |
| W912P821F0090ENGINEERING SERVICES, DESIGN OF SELA 76 PUMPING STATION #13 EXPANSION, ORLEANS PARISH, LOUISIANA. | Department of DefenseDepartment of the Army | HIGHLANDS RANCH, CO-04 | $4,986,193.45 | Ends November 30, 2026 |
| 70Z08823FESDV0027TRACEN PETALUMA SKEET RANGE PILOT TESTING AND DECISION DOCUMENTS | Department of Homeland SecurityU.S. Coast Guard | PETALUMA, CA-02 | $3,702,629.85 | Ends August 3, 2026 |
| W912DQ20F3030REMEDIAL INVESTIGATION/ FEASIBILITY STUDY VINELAND CHEMICAL COMPANY SUPERFUND SITE. | Department of DefenseDepartment of the Army | VINELAND, NJ-02 | $3,000,052 | Ends December 31, 2026 |
| 70Z08721FPXA10100ENVIRONMENTAL SERVICES FOR USCG BASE KODIAK | Department of Homeland SecurityU.S. Coast Guard | KODIAK, AK-00 | $2,971,731 | Ends April 8, 2028 |
| W9126G24C0019ARCHITECT-ENGINEER (A-E) SERVICES REQUIRED FOR THE CONTINUED FULL DESIGN SERVICES BY DESIGNER OF RECORD, CADILLAC HEIGHTS AT DALLAS, TX. | Department of DefenseDepartment of the Army | DALLAS, TX-30 | $2,629,669.07 | Ends December 31, 2026 |
| W912DQ24F3066MIDDLESEX SAMPLING PLANT VP A-E | Department of DefenseDepartment of the Army | MIDDLESEX, NJ-12 | $2,285,177 | Ends September 19, 2029 |
| W912P824F0027LOW SILL UNWATERING EDC | Department of DefenseDepartment of the Army | NEW ORLEANS, LA-01 | $2,090,147.86 | Ends September 30, 2026 |
| W912DQ24F3060CDE OU4 PHASE 4 REACHES 2,3,&4 EDC | Department of DefenseDepartment of the Army | FAIR LAWN, NJ-05 | $2,000,000 | Ends September 12, 2031 |
| W912P824F0200AVONDALE LEVEE & FLOODWALL A/E TO | Department of DefenseDepartment of the Army | NEW ORLEANS, LA-01 | $1,972,135.20 | Ends August 15, 2026 |
| IBM17T0010IGF::OT::IGF DESIGN FOR THE SUNLAND PARK LEVEE REPAIR | Department of StateInternational Boundary and Water Commission: U.S.-Mexico | EL PASO, TX-16 | $1,836,901.91 | Ends December 31, 2026 |
| W912DQ21F3050ARCHITECT & ENGINEERING SERVICES-ENGINEERING DURING CONSTRUCTION (EDC) FOR THE WELSBACH/GENERAL GAS MANTLE SUPERFUND SITE. | Department of DefenseDepartment of the Army | FAIR LAWN, NJ-05 | $1,756,982 | Ends February 28, 2027 |
| 70Z08323FABCD0001COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION LIABILITY ACT (CERCLA) SUPERFUND ACTIVITIES LONG TERM MONITORING & PFAS SAMPLING @ U.S. COAST GUARD YARD, BALTIMORE, MD | Department of Homeland SecurityU.S. Coast Guard | CURTIS BAY, MD-07 | $1,577,489 | Ends April 30, 2029 |
| W912HQ22C0059ESTCP PROJECT ER22-7226 | Department of DefenseDepartment of the Army | SEATTLE, WA-07 | $1,358,083 | Ends August 5, 2026 |
| 191BWC26F0075---------- COMMENTS: REMOVED THE "S" FOR THIS PR IS BEING FULLY FUNDED, IT IS NOT SAF! THIS TASK ORDER IS FOR THE DESIGN SERVICES OF A NEW ADMINISTRATION BUILDING AT MERCEDES FIELD OFFICE. THE EXISTING ADMINISTRATION BUILDING IS NO LONGER FUNCTIONAL | Department of StateInternational Boundary and Water Commission: U.S.-Mexico | MERCEDES, TX-34 | $1,353,894 | Ends May 31, 2028 |
| FA890322C0034TEMPE CELL METHOD FOR PFAS LEACHING | Department of DefenseDepartment of the Air Force | LACKLAND AFB, TX-23 | $1,219,156 | Ends December 27, 2026 |
| 70Z05326FENVI0014RCRA COMPLIANCE ROUNDWATER MONITORING ELIZABETH CITY, NORTH CAROLINA | Department of Homeland SecurityU.S. Coast Guard | ELIZABETH CITY, NC-01 | $1,044,226 | Ends July 31, 2028 |
| W912HQ24C0058ESTCP ER24-8144 FIELD DEMONSTRATION OF PILE CLOTH MEDIA FILTRATION AND MICROSORBENTS TO REMOVEPFAS AND SEDIMENT FROM SURFACE WATER AND STORMWATER RUNOFF | Department of DefenseDepartment of the Army | HIGHLANDS RANCH, CO-04 | $978,692 | Ends May 20, 2028 |
| W912HQ25C0006ER24-8160 ARCADIS FRAMEWORK FOR SITE SPECIFIC SOURCE STRENGTH AND LEACHING AT AFFF (AQUEOUS FILM-FORMING FOAM) SOURCES | Department of DefenseDepartment of the Army | HIGHLANDS RANCH, CO-04 | $962,657 | Ends November 20, 2028 |
| W912HQ24C0045ESTCP ER23-7696 OSORB PASSIVE SAMPLER FOR DETERMINATION OF PFAS IN SEDIMENT PORE WATER | Department of DefenseDepartment of the Army | HIGHLANDS RANCH, CO-04 | $821,338 | Ends March 12, 2028 |
| 70Z08820FPXA00300FARALLON ISLANDS HHERA/FFS PSN 13347127 | Department of Homeland SecurityU.S. Coast Guard | OAKLAND, CA-12 | $813,554 | Ends September 30, 2027 |
| W912P826FA059A-E GEN DESIGN TASK ORDER - CADD SUPPORT | Department of DefenseDepartment of the Army | HIGHLANDS RANCH, CO-04 | $665,736.46 | Ends May 26, 2027 |
| W912P826FA005THE CONTRACTOR SHALL MONITOR THE VIBRATION DURING CONSTRUCTION FOR SELA 72.2 PROJECT IN ORLEANS PARISH. THE NUMBER OF HOURS ALLOWED FOR EACH CATEGORY OF PERSONNEL OR THETOTAL MONETARY AMOUNT OF THIS TASK ORDER CANNOT BE EXCEEDED AS STATED. | Department of DefenseDepartment of the Army | NEW ORLEANS, LA-01 | $646,185.80 | Ends November 1, 2026 |
| HSCG8311JPCL164USCG LORSTA CAROLINA BEACH, NC CERCLA INVESTIGATION&DRUM CLEAN UP P/N 3291516 418 | Department of Homeland SecurityU.S. Coast Guard | WILMINGTON, NC-07 | $611,077 | Ends December 30, 2016 |
| HSCG8309J3CL160PN 2161101, CERCLA REMOVAL OU1 & OU2 (DOCS); FY09 | Department of Homeland SecurityU.S. Coast Guard | PORTSMOUTH, VA-03 | $606,927 | Ends April 29, 2016 |
| W912HQ25C0055ESTCP PROJECT EW25-8604 "DEMONSTRATION PROJECT FOR EVALUATION OF NON INVASIVE OF WATER DISTRIBUTION PIPE IDENTIFICATION TECHNOLOGIES" | Department of DefenseDepartment of the Army | RALEIGH, NC-02 | $538,768 | Ends June 11, 2029 |
| W912P824F0174VIBRATION MONITORING | Department of DefenseDepartment of the Army | NEW ORLEANS, LA-01 | $509,599.11 | Ends November 14, 2025 |
| W912DQ23F3031ARCHITECT AND ENGINEER SERVICES AT MATTEO SUPERFUND SITE OU1. | Department of DefenseDepartment of the Army | WEST DEPTFORD, NJ-01 | $500,000 | Ends July 6, 2028 |
| W912P825FA006MTG GIWW WEST FEA | Department of DefenseDepartment of the Army | HIGHLANDS RANCH, CO-04 | $499,561.80 | Ends July 31, 2026 |
| W912WJ25FA012ANNUAL SYSTEM SAMPLING AND OPERATIONS AND MAINTENANCE, GRAVEL ACCESS ROAD REPAIRS, AND FEASIBILITY STUDY, PROPOSED PLAN, AND RECORD OF DECISION AT FORMER NIKE PR-79 IN FOSTER, RHODE ISLAND. | Department of DefenseDepartment of the Army | FOSTER, RI-02 | $450,587.05 | Ends January 31, 2028 |
| 70Z08324FCLEV00592024 MS4 PROGRAM PLAN UPDATE @ U.S. COAST GUARD TRAINING CENTER YORKTOWN, YORKTOWN, VA. | Department of Homeland SecurityU.S. Coast Guard | YORKTOWN, VA-01 | $421,726 | Ends September 30, 2027 |
| FA890322C0030OSORB PASSIVE SAMPLERS FOR PFAS IN GROUNDWATER AND SURFACE WATER | Department of DefenseDepartment of the Air Force | LACKLAND AFB, TX-23 | $409,777 | Ends January 31, 2026 |
| W912HQ25C0064ESTCP PROJECT ER25-8685 CUSTOMER: ESTCP | Department of DefenseDepartment of the Army | LENEXA, KS-03 | $400,742 | Ends September 20, 2029 |
| W51DQV24C0001EDC SERVICES RIO PUERTO NUEVO CONTRACT 2 | Department of DefenseDepartment of the Army | SAN JUAN, PR-98 | $294,233.28 | Ends November 22, 2028 |
| W912DR23C0013AE (TITLE II) PHASE SERVICES | Department of DefenseDepartment of the Army | WASHINGTON, DC-98 | $281,304 | Ends October 30, 2026 |
| 70Z08326FYORK0005STUDY/DESIGN STORMWATER MANAGEMENT (SWM) BEST MANAGEMENT PRACTICE (BMP) FEATURES 3RD CYCLE CHESAPEAKE BAY TOTAL MAIMUM DAILY LOAD (TMDL) PN 29839955 | Department of Homeland SecurityU.S. Coast Guard | YORKTOWN, VA-01 | $261,926 | Ends March 24, 2027 |
Subcontracts it reported
A prime contractor reports the subcontracts it gives under an award (first-tier subawards). These are the largest it reported under its three largest awards, from every year of each award.
Under award W912DQ21F3052
| Subcontractor | What it is for, as reported | Amount | Date |
|---|---|---|---|
| SUMMIT DRILLING, LLC | TO PROVIDE DRILLING SERVICES AT THE WELSBACH SUPERFUND SITE IN SUPPORT OF INVESTIGATIONS, REMEDIAL DESIGNS AND RELATED STUDIES AT THE WELSBACH SUPERFUND SITE. | $737,500 | |
| SUMMIT DRILLING, LLC | TO PROVIDE DRILLING SERVICES AT SIX SEPARATE STUDY AREAS. DRILLING AND TESTING EQUIPMENT, BORING AND SOIL SAMPLING, CORE DRILLING IN ROCK, PROBING'S, MONITORING WELL AND PIEZOMETER INSTALLATION, SCREENED AUGER GROUNDWATER SAMPLING, PACKER TESTING | $262,350 | |
| TAYLOR, WISEMAN & TAYLOR, INC. | THE SCOPE OF TECHNICAL SERVICES FOR DESIGN TOPOGRAPHIC SURVEYS (SCOPE OF TECHNICAL SERVICES) ESTABLISHES THE PERFORMANCE AND QUALITY STANDARDS FOR MATERIALS, EQUIPMENT, AND QUALITY OF WORKMANSHIP. ANY QUESTIONS ON INTERPRETATION OF OR ANY CONFLICTS WITH ANY PORTION OF THE SCOPE OF TECHNICAL SERVICES | $228,225 | |
| MARSTEL-DAY, LLC | TO PROVIDE ARCHAEOLOGICAL MONITORING SERVICES. | $188,225.57 | |
| GROUND PENETRATING RADAR SYSTEMS, LLC | THE SCOPE OF TECHNICAL SERVICES FOR DESIGN TOPOGRAPHIC SURVEYS (SCOPE OF TECHNICAL SERVICES) ESTABLISHES THE PERFORMANCE AND QUALITY STANDARDS FOR MATERIALS, EQUIPMENT, AND QUALITY OF WORKMANSHIP. ANY QUESTIONS ON INTERPRETATION OF OR ANY CONFLICTS WITH ANY PORTION OF THE SCOPE OF TECHNICAL SERVICES | $161,900 | |
| SGS NORTH AMERICA INC. | TEMPORARY WELL POINT (TWP) PROFILE BORINGS SHALL BE DRILLED TO APPROXIMATELY 90 FEET BELOW GROUND SURFACE (BGS) USING SONIC DRILLING METHODS. A TOTAL OF 4 BORINGS WILL BE DRILLED AT THE HOLT CARGO (FORMER WELSBACH FACILITY), AND CONTINUOUS CORES WILL BE RETRIEVED FOR THE PURPOSES OF SOIL CORE LOGGIN | $144,685 | |
| COPHYSICS CORPORATION | ARCADIS REQUIRES THE SERVICES OF COPHYSICS CORPORATION TO PERFORM CERTAIN HEALTH PHYSICS AND INSTRUMENTATION SERVICES ON THE WELSBACH/GENERAL GAS MANTLE SUPERFUND SITE IN CAMDEN AND GLOUCESTER CITY, NEW JERSEY AS PART OF ARCADIS€„¢S WORK UNDER A U.S. ARMY CORPS OF ENGINEERS-KANSAS CITY DISTRICT | $110,000 | |
| PACE ANALYTICAL SERVICES, LLC | LABORATORY DATA PACKAGES AND THE VALIDATION OF ANALYTICAL RESULTS FOR ALPHA PARTICLE EMITTING FROM SAMPLES COLLECTED DURING THE WELSBACH/GENERAL GAS MANTLE SITE. | $86,800 |
Lobbying reports and campaign receipts that name this vendor
No lobbying report, organization page or FEC receipt in our saved records has this vendor’s name or its parent company’s name.
A name is matched only when it is the same name under the exact-name rule: letters and numbers alike, "&" read as "and", a leading "the" and one closing legal form (Inc, LLC, Corp, Corporation, Co, LP, LLP) set aside. A near name is never a match. Each match says which name matched.