MW SERVICES INC
- Unique Entity ID (UEI)
- MC6NZVFUVLZ2
- Parent company
- MW SERVICES INC (this vendor is its own parent)
- Registered address
- TEMECULA, CA, district CA-48
- Other names on record
- MW SERVICES INC.; MW SERVICES INCORPORATED
Dollars are contract obligations in the fiscal year, as USAspending adds them up from each award's transactions. A contract's full value can be larger and run over several years. A figure below zero is money taken back from contracts signed earlier.
Source: USAspending.gov, the Treasury’s public record of federal spending. Our copy was saved November 17, 2026.
Which agencies pay this vendor, and where the work is done
Fiscal year 2027
USAspending lists no contract dollars for this vendor in fiscal year 2027 yet.
Fiscal year 2026: $4,538,466.21
| Agency | Contract dollars |
|---|---|
| Department of Defense | $4,538,466.21 |
| District where the work is done | Contract dollars |
|---|---|
| TX-19Jodey C. Arrington | $4,384,187.84 |
| CA-50Scott H. Peters | $154,278.37 |
Largest awards
The largest contract awards with activity from October 1, 2025 to September 30, 2027, by each award's total amount over its whole life. 0 rows of the answer belong to related companies and are left out.
| Award | Agency | Where the work is done | Award total | Start |
|---|---|---|---|---|
| FA466122F0101THIS IS A TASK ORDER OFF THE SABER CONTRACT FA466117D0003 FOR REPAIR WATER TOWER, 6221 TOPR #114. $500 HAS BEEN SUBTRACTED FROM THE PROPOSED PRICE OF $1,535,938.76 DUE TO THE $500 PAID ON TASK ORDER FA466121F0058 | Department of DefenseDepartment of the Air Force | DYESS AFB, TX-19 | $1,751,040.83 | Ends June 17, 2026 |
| FA466126F0037THE CONTRACTOR WILL DESIGN, CONSTRUCT, AND INSTALL A 100X75 FT PRE-FABRICATED OVERHEAD SUN SHADE FOR THE MUNITIONS ASSEMBLY PAD AT DYESS AFB. | Department of DefenseDepartment of the Air Force | DYESS AFB, TX-19 | $1,379,705.14 | Ends June 10, 2027 |
| FA466126F0029REMOVE AND REPLACE THE AIR HANDLERS, BOILERS, CHILLED WATER PUMPS, AND THE YORK CHILLER LOCATED AT BUILDING 8202. | Department of DefenseDepartment of the Air Force | DYESS AFB, TX-19 | $1,303,178.24 | Ends April 23, 2027 |
| FA466124F0114THE PURPOSE OF THIS TASK ORDER IS FOR THE REPAIR OF THE CCU FUEL CELL VENTILATION SYSTEM IN BUILDING 4230. | Department of DefenseDepartment of the Air Force | DYESS AFB, TX-19 | $1,288,170.04 | Ends May 11, 2026 |
| N6247324F5118NBPL-23 PROCURE & INSTALL 1EA GANGWAY INBOARD SIDE FUEL PIER | Department of DefenseDepartment of the Navy | SAN DIEGO, CA-50 | $1,200,617.45 | Ends October 5, 2026 |
| FA466126F0008THIS TASK ORDER IS TO PERFORM MOLD REMEDIATION IAW SOO FOR DORM ROOMS. | Department of DefenseDepartment of the Air Force | DYESS AFB, TX-19 | $886,449.59 | Ends October 27, 2026 |
| N6247324F5225X060 NBPL-47. UPGRADE EXISTING LOCKER AND SHOWER ROOM | Department of DefenseDepartment of the Navy | SAN DIEGO, CA-50 | $723,934.90 | Ends September 22, 2026 |
| FA466125F0033RENOVATE B4314 BATHROOMS IN ACCORDANCE WITH THE SOO. | Department of DefenseDepartment of the Air Force | DYESS AFB, TX-19 | $662,334.55 | Ends December 1, 2026 |
| FA466124F0038THE PURPOSE OF THIS TASK ORDER IS TO REPAIR THE DEFICIENT HVAC SYSTEM IN BUILDING 5013, FIRE STATION. | Department of DefenseDepartment of the Air Force | DYESS AFB, TX-19 | $607,597.83 | Ends October 6, 2026 |
| FA466125F0026REMOVE EXISTING FLOOR PANELS AND INSTALL NEW RAISED FLOORING WITHIN THE SERVER ROOM, SECURE SERVER ROOM AND STORAGE AREA. | Department of DefenseDepartment of the Air Force | DYESS AFB, TX-19 | $601,946.37 | Ends March 7, 2027 |
| FA466125F0064BUILDING 9304, TO RENOVATE THE CARBON MONOXIDE AND NITROGEN OXIDES (CO/NOX) VENTILATION EXHAUST SYSTEM. | Department of DefenseDepartment of the Air Force | DYESS AFB, TX-19 | $597,650.58 | Ends August 22, 2026 |
| FA466126F0027THIS TASK ORDER IS TO REPLACE HVAC IN DORMS B6126/6127 | Department of DefenseDepartment of the Air Force | DYESS AFB, TX-19 | $487,826.58 | Ends March 6, 2027 |
| FA466125F0075THE USER AT B4216 WANTS TO RENOVATE THEIR AUDITORIUM. THEIR MAIN FOCUSES INCLUDE NEW SEATING, NEW CARPET, UPDATED PAINT AND WALL FIXTURES, AND RENOVATING THE STAGE. | Department of DefenseDepartment of the Air Force | DYESS AFB, TX-19 | $478,495.14 | Ends August 10, 2026 |
| FA466124F0078THIS SABER TASK ORDER IS TO REPLACE CHILLER (PIO HVAC) IN B7206. | Department of DefenseDepartment of the Air Force | DYESS AFB, TX-19 | $415,339.66 | Ends June 29, 2026 |
| FA466124F0115THIS PROJECT ENTAILS THE INSTALLATION OF GENERATORS TO EACH OF THE BUILDINGS LISTED, 5225, 9330, 6030, AND 6122, TO INCLUDE ACCOMPANYING PANEL BOARDS, AUTOMATIC TRANSFER SWITCHES, BYPASSES,AND COOLING UNITS. | Department of DefenseDepartment of the Air Force | DYESS AFB, TX-19 | $395,122.54 | Ends April 26, 2027 |
| FA466125F0066THE CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, TOOLS, MATERIAL, SUPERVISION, AND ALL OTHER NECESSARY ITEMS TO DEMO AND DISPOSE OF EXISTING LIGHT POLES, WIRING AND LIGHTS AND REPLACE WITH SAME HEIGHT LIGHT POLES, NEW WIRING AND LIGHTS. | Department of DefenseDepartment of the Air Force | DYESS AFB, TX-19 | $289,769 | Ends March 7, 2027 |
| FA466125F0059REPLACE AIR HANDLER, CHILLED WATER PUMP, AND PIPING IN B8030. REPLACE DIRECT EXPANSION UNIT AND AIR HANDLER IN B11955 | Department of DefenseDepartment of the Air Force | DYESS AFB, TX-19 | $249,011.72 | Ends July 13, 2026 |
| FA466125F0031EXTEND B4216 SEWER LIFE BY CLEANING PIPES, REPAIRING LINING, AND INSTALLING NEW CONNECTION TO MAIN LINE SOUTH OF BUILDING. REPLACE CHIPPED/BROKEN CORRIDOR TILE NEAR ROOM 325 RESTROOMS WITH RESILIENT EPOXY CONCRETE FLOORING. | Department of DefenseDepartment of the Air Force | DYESS AFB, TX-19 | $239,879.06 | Ends June 22, 2026 |
| FA466126F0039CHILLER REPLACEMENT FOR BUILDING 5005. | Department of DefenseDepartment of the Air Force | DYESS AFB, TX-19 | $500 | Ends August 28, 2026 |
| FA466126F0028PROPOSAL FEE TO REPLACE FIREHOUSE DOORS/AIR HOSES AT B5013. TASK ORDER UTILIZES CLINS 3001 AND 3003. | Department of DefenseDepartment of the Air Force | DYESS AFB, TX-19 | $500 | Ends May 20, 2026 |
| FA466126F0016PROPOSAL FEE FOR 436 TRS CRASH PAD B8202 DESIGNS AND QUANTS. MAGNITUDE OF CONSTRUCTION: PURSUANT TO FAR 36.204(D) THE FOLLOWING IS PROVIDED: THE MAGNITUDE OF CONSTRUCTION IS BETWEEN $500,000 AND $1,000,000. THIS TASK ORDER IS UTILIZING CLIN 2003. | Department of DefenseDepartment of the Air Force | DYESS AFB, TX-19 | $500 | Ends July 9, 2026 |
| FA466126F0015PROPOSAL FEE FOR A SUNSHADE FOR B9111. MAGNITUDE OF CONSTRUCTION: PURSUANT TO FAR 36.204(E) THE FOLLOWING IS PROVIDED: THE MAGNITUDE OF CONSTRUCTION IS BETWEEN $500,000 AND $1,000,000. THIS TASK ORDER IS UTILIZING CLIN 2001 AND 2002 | Department of DefenseDepartment of the Air Force | DYESS AFB, TX-19 | $500 | Ends June 23, 2026 |
| FA466126F0004PROPOSAL FEE FOR HVAC REPLACEMENT FOR B6126 AND 6127. MAGNITUDE OF CONSTRUCTION: PURSUANT TO FAR 36.204(C) THE FOLLOWING IS PROVIDED: THE MAGNITUDE OF CONSTRUCTION IS BETWEEN $100,000 AND $250,000. THIS TASK ORDER IS UTILIZING CLIN 2001 AND 2002 | Department of DefenseDepartment of the Air Force | DYESS AFB, TX-19 | $500 | Ends March 13, 2026 |
| FA466126F0003THIS TASK ORDER IS UTILIZING CLIN 2001 AND 2002 TO PERFORM MOLD REMEDIATION IAW STATEMENT OF OBJECTIVES (SOO) FOR B6126 AND B6127. | Department of DefenseDepartment of the Air Force | DYESS AFB, TX-19 | $500 | Ends January 26, 2026 |
Subcontracts it reported
A prime contractor reports the subcontracts it gives under an award (first-tier subawards). These are the largest it reported under its three largest awards, from every year of each award.
No subcontract is reported under this vendor’s largest awards.
Lobbying reports and campaign receipts that name this vendor
No lobbying report, organization page or FEC receipt in our saved records has this vendor’s name or its parent company’s name.
A name is matched only when it is the same name under the exact-name rule: letters and numbers alike, "&" read as "and", a leading "the" and one closing legal form (Inc, LLC, Corp, Corporation, Co, LP, LLP) set aside. A near name is never a match. Each match says which name matched.