$3,299,659 in contract dollars, fiscal year 2027Confirmed from the official record
Unique Entity ID (UEI)
JDKYAKDT4TT6
Parent company
CREARE LLC (this vendor is its own parent)
Registered address
HANOVER, NH, district NH-02
Other names on record
CREARE INC; CREARE INCORPORATED; CREARE, INC
Dollars are contract obligations in the fiscal year, as USAspending adds them up from each award's transactions. A contract's full value can be larger and run over several years. A figure below zero is money taken back from contracts signed earlier.
Source: USAspending.gov, the Treasury’s public record of federal spending. Our copy was saved November 19, 2026.
The largest contract awards with activity from October 1, 2025 to September 30, 2027, by each award's total amount over its whole life. 0 rows of the answer belong to related companies and are left out.
Largest contract awards, by each award's total over its life
Award
Agency
Where the work is done
Award total
Start
N0042126C1004HGU-99/P HELMETS SYSTEM
Department of DefenseDepartment of the Navy
PATUXENT RIVER, MD-05
$20,598,942.23
Ends May 3, 2028
N0042124C0006PROGRAM MANAGEMENT/ENGINEERING AND HPH ASSETS
Department of DefenseDepartment of the Navy
PATUXENT RIVER, MD-05
$14,870,229.06
Ends May 1, 2026
N0042123C0016FRP TIME CRITICAL ITEMS & PROGRAM MGT
Department of DefenseDepartment of the Navy
PATUXENT RIVER, MD-05
$14,416,047.81
Ends April 1, 2025
80NSSC25C0441SBIR PHASE III - CREARE LLC - 90 K 30 W CRYOCOOLER DESIGN AND DEMONSTRATION
National Aeronautics and Space Administration
HANOVER, NH-02
$13,367,984
Ends October 16, 2028
N0042125C0002HELMETS, ACCESSORIES AND SPARE PARTS
Department of DefenseDepartment of the Navy
PATUXENT RIVER, MD-05
$9,762,431.52
Ends March 31, 2027
80GSFC22CA001WIDE RANGE PUMP
National Aeronautics and Space Administration
HANOVER, NH-02
$9,098,144.49
Ends January 31, 2027
NNC14CA15CIGF::OT::IGF PHASE III SBIR CONTRACT FOR THE PROCUREMENT OF A 20 WATT 20 KELVIN CRYOCOOLER FOR THERMAL CONTROL OF SPACE-BASED LIQUID HYDROGEN. THIS IS A CONTINUATION OF WORK DEVELOPED BY THE CONTRACTOR UNDER PREVIOUS SBIR PHASE II CONTRACTS.
National Aeronautics and Space Administration
HANOVER, NH-02
$8,992,147.99
Ends August 1, 2026
W56HZV20C0003SBIR PH II DC-DC CONVERTOR PROTOTYPE
Department of DefenseDepartment of the Army
HANOVER, NH-02
$4,322,310.33
Ends February 14, 2027
80NSSC25CA011PHASE III - CRYOCOOLER CONTROL ELECTRONICS (CCE) DEMONSTRATION PHASE
National Aeronautics and Space Administration
HANOVER, NH-02
$2,981,593
Ends May 14, 2027
HQ014718C7017STTR PHASE II R&D; MULTI-PHYSICS ANALYSIS TOOL FOR HIGH-ENERGY GAS LASERS
Department of DefenseMissile Defense Agency
HANOVER, NH-02
$2,534,344.45
Ends March 2, 2024
N6833523C0039RESEARCH AND DEVELOPMENT
Department of DefenseDepartment of the Navy
HANOVER, NH-02
$1,999,911
Ends February 25, 2027
80GSFC26C0029VENUS MASS SPECTROMETER (VMS) WIDE RANGE PUMP (WRP) FOR DAVINCI
National Aeronautics and Space Administration
HANOVER, NH-02
$1,800,000
Ends July 28, 2028
FA233025CB005PHASE II SBIR FOR TOPIC AF233-0033
Department of DefenseDepartment of the Air Force
HANSCOM AFB, MA-05
$1,799,959.47
Ends June 18, 2027
FA910126PB03424.2B_PHII_SBIR_F2-19409_AFTC/AEDC SBIR PHASE II AF242-0007 F2-19409 -ROTOR SYNCHRONIZED IMAGING SYSTEM FOR ROTORCRAFT WIND TUNNEL TESTING (CREARE)
Department of DefenseDepartment of the Air Force
HANOVER, NH-02
$1,799,781.65
Ends June 8, 2028
N6833524C0481RESEARCH AND DEVELOPMENT
Department of DefenseDepartment of the Navy
HANOVER, NH-02
$1,799,735
Ends February 17, 2027
N6833520C0093RESEARCH AND DEVELOPMENT
Department of DefenseDefense Contract Management Agency
HANOVER, NH-02
$1,797,547.20
Ends July 31, 2024
6913G626C100011FY26 PHASE II AWARD WITH CREARE LLC UNDER TOPIC AI FOR TRANSPORTATION PLANNING AND DESIGN (AI TPD).
Department of TransportationImmediate Office of the Secretary of Transportation
HANOVER, NH-02
$1,712,463.30
Ends June 7, 2028
N6833524C0260RESEARCH AND DEVELOPMENT
Department of DefenseDepartment of the Navy
HANOVER, NH-02
$1,593,577
Ends September 30, 2027
80NSSC25C0442FY25 SBIR PHASE III - CREARE LLC - DEVELOPMENT OF AN ADVANCED RECUPERATOR
National Aeronautics and Space Administration
HANOVER, NH-02
$1,504,578
Ends February 28, 2027
N6833520C0112RESEARCH AND DEVELOPMENT
Department of DefenseDefense Contract Management Agency
HANOVER, NH-02
$1,499,026
Ends November 10, 2020
N6833520C0320RESEARCH AND DEVELOPMENT
Department of DefenseDefense Contract Management Agency
HANOVER, NH-02
$1,499,011
Ends March 1, 2022
HQ086021C7104SBIR/STTR PHASE II R&D: MODELING OF HIGH-POWER FIBER LASER PERFORMANCE
Department of DefenseMissile Defense Agency
HANOVER, NH-02
$1,485,242.26
Ends April 25, 2024
W911SR24C0017SEQUENTIAL SBIR PHASE II CREARE LOW-SWAP POWERED AIR PURIFYING RESPIRATOR (PAPR)
Department of DefenseDepartment of the Army
HANOVER, NH-02
$1,315,154.78
Ends August 22, 2026
W9132V25C0003STTR PHASE II FOR THE PROJECT ENTITLED EXTENDING THE ANALOG ENSEMBLE METHOD FOR SATELLITE OBSERVATIONS
Department of DefenseDepartment of the Army
ALEXANDRIA, VA-08
$1,314,932.83
Ends August 20, 2027
HT942523C0060DHA PH II SEQL PROPOSAL H2S-0044 TITLED: AUTOMATED VESTIBULAR REHABILITATION MANAGEMENT SYSTEM. MEDICAL R & D EGS: 23000509
Department of DefenseDefense Health Agency
HANOVER, NH-02
$1,299,959.86
Ends August 24, 2027
HT942525CE024DEVELOPMENT OF AN AUTOMATED NEEDLE DECOMPRESSION DEVICE
Department of DefenseDefense Health Agency
HANOVER, NH-02
$1,299,857.86
Ends January 21, 2028
80NSSC27C0035SBIR PHASE II IN-SUIT DETECTION OF VENOUS GAS EMBOLI
National Aeronautics and Space Administration
HANOVER, NH-02
$1,274,989
Ends November 9, 2028
80NSSC26C0184SBIR PHASE II
National Aeronautics and Space Administration
HANOVER, NH-02
$1,274,858
Ends September 28, 2028
80NSSC27C0036SBIR PHASE II LOW VIBRATION COOLING TECHNOLOGY FOR IR DETECTORS
National Aeronautics and Space Administration
HANOVER, NH-02
$1,274,670
Ends October 5, 2028
N0002424CS167BASE
Department of DefenseDepartment of the Navy
HANOVER, NH-02
$1,266,645
Ends October 25, 2026
SPRPA126CYA15PRESS ASSEMBLY
Department of DefenseDefense Logistics Agency
HANOVER, NH-02
$1,264,691.50
Ends June 2, 2027
N6833521C0315RESEARCH AND DEVELOPMENT
Department of DefenseDepartment of the Navy
HANOVER, NH-02
$1,156,763
Ends June 15, 2026
N6833526F0013HARDWARE
Department of DefenseDepartment of the Navy
HANOVER, NH-02
$1,149,600.90
Ends January 9, 2027
80NSSC23CA010CONTINUOUS CORRELATIONS FOR COMPLETE BOILING CURVES OF CRYOGENIC FLUIDS
National Aeronautics and Space Administration
HANOVER, NH-02
$1,124,986
Ends October 7, 2027
80NSSC18C0223THE ADVANCED SPACE SUIT CARRIES CONSUMABLE COOLING WATER MAINTAINED AT AMBIENT PRESSURE WITHIN A SOFT-WALLED, FLEXIBLE RESERVOIR. TO ENSURE UNINTERRUPTED THERMAL CONTROL IT IS CRITICAL TO MONITOR THE VOLUME OF WATER REMAINING, BUT NO KNOWN SENSOR IS SUITABLE FOR THIS TASK. EXISTING MEASUREMENT TECHN
National Aeronautics and Space Administration
HANOVER, NH-02
$1,122,003
Ends May 27, 2027
N6833524C0361SBIR PHASE II
Department of DefenseDepartment of the Navy
HANOVER, NH-02
$999,949
Ends February 3, 2027
N6833526C0176RESEARCH AND DEVELOPMENT
Department of DefenseDepartment of the Navy
HANOVER, NH-02
$999,910
Ends December 16, 2027
N6833524C0540RESEARCH AND DEVELOPMENT
Department of DefenseDepartment of the Navy
HANOVER, NH-02
$999,733
Ends September 30, 2026
N6833525C0520873AUTHORITY
Department of DefenseDepartment of the Navy
HANOVER, NH-02
$999,086
Ends July 28, 2027
6913G624C100011SMALL BUSINESS INNOVATION RESEARCH PHASE IIB ON U.S. DOT TOPIC 20-PH1 ROBUST, FIELD-READY, INLINE TOOL FOR THE ACCURATE MEASUREMENT OF PIPE BENDING STRESSES AND CRACK DETECTION
Department of TransportationImmediate Office of the Secretary of Transportation
HANOVER, NH-02
$985,138
Ends August 25, 2026
Subcontracts it reported
A prime contractor reports the subcontracts it gives under an award (first-tier subawards). These are the largest it reported under its three largest awards, from every year of each award.
Under award N0042126C1004
Subcontracts reported under award N0042126C1004
Subcontractor
What it is for, as reported
Amount
Date
EDARE LLC
UNDER THE 4TH YEAR OF FULL RATE PRODUCTION, EDARE SHALL PROVIDE THE REQUIRED PERSONNEL, SERVICES, EQUIPMENT, AND FACILITIES TO MANUFACTURE THE HPH AND DELIVER PRODUCTS IAW THE NAVY'S DETAILED REQUIREMENTS
$17,308,507.04
Under award N0042124C0006
Subcontracts reported under award N0042124C0006
Subcontractor
What it is for, as reported
Amount
Date
EDARE LLC
EDARE SHALL PROVIDE THE REQUIRED PERSONNEL, SERVICES, EQUIPMENT, AND FACILITIES TO MANUFACTURE THE PRODUCT AND DELIVER PRODUCTS IAW THE DETAILED REQUIREMENTS
$10,628,386.65
Under award N0042123C0016
Subcontracts reported under award N0042123C0016
Subcontractor
What it is for, as reported
Amount
Date
EDARE LLC
EDARE SHALL PROVIDE THE REQUIRED PERSONNEL, SERVICES, EQUIPMENT, AND FACILITIES TO MANUFACTURE THE PRODUCT AND DELIVER PRODUCTS IAW THE DETAILED REQUIREMENTS.
$6,972,376
Lobbying reports and campaign receipts that name this vendor
No lobbying report, organization page or FEC receipt in our saved records has this vendor’s name or its parent company’s name.
A name is matched only when it is the same name under the exact-name rule: letters and numbers alike, "&" read as "and", a leading "the" and one closing legal form (Inc, LLC, Corp, Corporation, Co, LP, LLP) set aside. A near name is never a match. Each match says which name matched.
Suggest a tool
Suggest a tool
A person reads each idea before it appears. Links are not accepted. Do not include personal information.