SEDONA- NASCO JOINT VENTURE
- Unique Entity ID (UEI)
- GLSLZ75HV2T5
- Parent company
- SEDONA- NASCO JOINT VENTURE (this vendor is its own parent)
- Registered address
- LAS CRUCES, NM, district NM-02
- Other names on record
- None listed
Dollars are contract obligations in the fiscal year, as USAspending adds them up from each award's transactions. A contract's full value can be larger and run over several years. A figure below zero is money taken back from contracts signed earlier.
Source: USAspending.gov, the Treasury’s public record of federal spending. Our copy was saved November 17, 2026.
Which agencies pay this vendor, and where the work is done
Fiscal year 2027
USAspending lists no contract dollars for this vendor in fiscal year 2027 yet.
Fiscal year 2026: $9,621,555.87
| Agency | Contract dollars |
|---|---|
| Department of Defense | $9,621,555.87 |
| District where the work is done | Contract dollars |
|---|---|
| AL-03Mike Rogers | $9,621,555.87 |
Largest awards
The largest contract awards with activity from October 1, 2025 to September 30, 2027, by each award's total amount over its whole life. 0 rows of the answer belong to related companies and are left out.
| Award | Agency | Where the work is done | Award total | Start |
|---|---|---|---|---|
| W911KF26FA008MODERNIZATION OF BUILDING 114 FACILITIES IN CONJUNCTION WITH THE USEC PROJECT. | Department of DefenseDepartment of the Army | ANNISTON, AL-03 | $4,904,827 | Ends March 22, 2027 |
| W911KF24F0052FIRE SUPPRESSION REPAIR IN BLDG 1500 | Department of DefenseDepartment of the Army | ANNISTON, AL-03 | $3,373,788 | Ends August 31, 2026 |
| W911KF24F0100REPLACE CHILLER AND BOILERS AT BLDG 31 | Department of DefenseDepartment of the Army | ANNISTON, AL-03 | $2,219,000 | Ends August 31, 2026 |
| W911KF24F0084SATOC MINOR CONSTRUCTION 2ND OPTION YEAR | Department of DefenseDepartment of the Army | ANNISTON, AL-03 | $1,790,229 | Ends October 13, 2026 |
| W911KF24F0061QD66 BUILDING 130 RENOVATION | Department of DefenseDepartment of the Army | ANNISTON, AL-03 | $1,706,538 | Ends September 16, 2026 |
| W911KF24F0122QD22 BUILDING 104 AND 522 ROOF REPAIRS | Department of DefenseDepartment of the Army | ANNISTON, AL-03 | $1,620,545 | Ends January 31, 2026 |
| W911KF25F0022OVERHEAD DOORS | Department of DefenseDepartment of the Army | ANNISTON, AL-03 | $1,415,634 | Ends July 31, 2026 |
| W911KF26FA033CONTRACTOR SHALL PROVIDE ALL MATERIAL, TRANSPORTATION, LABOR, EQUIPMENT, COORDINATION, PLANNING, AND SUPERVISION NECESSARY TO REPAIR DAMAGED ROLLING SERVICE DOORS, ROLLING GRILLES, HIGH SPEED, AND FIRE DOORS ON DEPOT. | Department of DefenseDepartment of the Army | ANNISTON, AL-03 | $1,278,577.87 | Ends March 15, 2027 |
| W911KF25F0061QE43-25 REPLACE WATER MAIN FEED LINE | Department of DefenseDepartment of the Army | ANNISTON, AL-03 | $1,098,135 | Ends March 31, 2026 |
| W911KF26FA053REPAIRS TO INCLUDE ASPHALT AND CONCRETE ROADWAY REPAIRS, SLOPE STABILIZATION, EROSION REPAIRS, AGGRADATION AND SEDIMENT REMOVAL, PLACEMENT OF RIP RAP, VEGETATION AND DEBRIS REMOVAL, CONCRETE PATCHING, CONCRETE CRACK FILLING, PAINTING AND ETC. | Department of DefenseDepartment of the Army | ANNISTON, AL-03 | $1,023,501 | Ends March 22, 2027 |
| W911KF26FA003DPW, SATOC, QD40-23, FY25 IGLOO GRUBBING, | Department of DefenseDepartment of the Army | ANNISTON, AL-03 | $748,749 | Ends December 14, 2026 |
| W911KF26FA042REPLACE EMERGENCY POWER AT ACCESS CONTROL POINTS AND VISITOR CONTROL CENTER. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS, THIS STATEMENT OF WORK, CONTRACT DRAWINGS, AND TECHNICAL REQUIREMENTS. | Department of DefenseDepartment of the Army | ANNISTON, AL-03 | $464,499 | Ends September 14, 2026 |
| W911KF26FA010THE WORK SHALL BE PERFORMED UNDER THIS CONTRACT CONSISTS OF FURNISHING ALL MATERIAL, TRANSPORTATION, LABOR, EQUIPMENT, COORDINATION, PLANNING, AND SUPERVISION NECESSARY TO UPGRADE. | Department of DefenseDepartment of the Army | ANNISTON, AL-03 | $416,340 | Ends October 18, 2026 |
| W911KF26FA012CONTRACTOR SHALL PROVIDE ALL MATERIAL, TRANSPORTATION, LABOR, EQUIPMENT, COORDINATION, PLANNING, AND SUPERVISION NECESSARY TO PERFORM THE REPAIR WATER LINE NEAR BUILDING 502 IN THE CONTRACT DRAWINGS, F.E.-002-24, 6 SHEETS. | Department of DefenseDepartment of the Army | ANNISTON, AL-03 | $359,620 | Ends May 22, 2026 |
| W911KF25F0054REPLACE GENERATORS, BUILDINGS 2 AND 107 | Department of DefenseDepartment of the Army | ANNISTON, AL-03 | $301,387 | Ends February 13, 2026 |
| W911KF26FA005THE VISUAL, NON-DESTRUCTIVE, ROOF WOOD TRUSS STRUCTURAL CONDITION INSPECTIONS AND RECOMMEND REPAIRS AT 27 BUILDINGS AND THE CDC BUILDING 1500. | Department of DefenseDepartment of the Army | ANNISTON, AL-03 | $100,096 | Ends May 20, 2026 |
| W911KF26FA051QE66-25 ELECTRICAL REPAIRS BLDG 129 | Department of DefenseDepartment of the Army | ANNISTON, AL-03 | $81,944 | Ends December 7, 2026 |
| W911KF26FA002QD06-23 EC UNIT CONTROL UPGRADE | Department of DefenseDepartment of the Army | ANNISTON, AL-03 | $52,314 | Ends September 30, 2026 |
Subcontracts it reported
A prime contractor reports the subcontracts it gives under an award (first-tier subawards). These are the largest it reported under its three largest awards, from every year of each award.
No subcontract is reported under this vendor’s largest awards.
Lobbying reports and campaign receipts that name this vendor
No lobbying report, organization page or FEC receipt in our saved records has this vendor’s name or its parent company’s name.
A name is matched only when it is the same name under the exact-name rule: letters and numbers alike, "&" read as "and", a leading "the" and one closing legal form (Inc, LLC, Corp, Corporation, Co, LP, LLP) set aside. A near name is never a match. Each match says which name matched.