E CORP
- Unique Entity ID (UEI)
- CWVJEB454CR7
- Parent company
- E CORP (this vendor is its own parent)
- Registered address
- LAYTON, UT, district UT-01
- Other names on record
- E CORPORATION; E-CORP; E-CORP.
Dollars are contract obligations in the fiscal year, as USAspending adds them up from each award's transactions. A contract's full value can be larger and run over several years. A figure below zero is money taken back from contracts signed earlier.
Source: USAspending.gov, the Treasury’s public record of federal spending. Our copy was saved November 19, 2026.
Which agencies pay this vendor, and where the work is done
Fiscal year 2027: $402,330.83
| Agency | Contract dollars |
|---|---|
| Department of the Interior | $205,904 |
| Department of Transportation | $196,426.83 |
| District where the work is done | Contract dollars |
|---|---|
| NM-03Teresa Leger Fernandez | $205,904 |
| MN-05Ilhan Omar | $85,624 |
| UT-02Celeste Maloy | $70,047.58 |
| VT-00Becca Balint | $34,090 |
| CA-43Maxine Waters | $6,665.25 |
Fiscal year 2026: $23,313,313.73
| Agency | Contract dollars |
|---|---|
| Department of Transportation | $13,807,161.31 |
| Department of the Interior | $9,480,656.42 |
| Department of Defense | $25,496 |
| District where the work is done | Contract dollars |
|---|---|
| WY-00Harriet M. Hageman | $8,298,013 |
| OK-03Frank D. Lucas | $5,246,537 |
| MI-13Shri Thanedar | $4,177,355 |
| VT-00Becca Balint | $3,070,438.70 |
| CA-27George Whitesides | $2,296,678.51 |
| UT-01Blake D. Moore | $1,143,863 |
| MN-05Ilhan Omar | $484,764 |
| LA-03Clay Higgins | $211,903.51 |
| CA-43Maxine Waters | $64,548.88 |
| NM-02Gabe Vasquez | $28,827.24 |
| AZ-06Juan Ciscomani | $25,496 |
| KS-03Sharice Davids | $13,816 |
| TX-21Chip Roy | $8,770.57 |
| CA-14Aisha Wahab | $0 |
| CO-06Jason Crow | $0 |
| UT-02Celeste Maloy | -$1,757,697.68 |
Largest awards
The largest contract awards with activity from October 1, 2025 to September 30, 2027, by each award's total amount over its whole life. 0 rows of the answer belong to related companies and are left out.
| Award | Agency | Where the work is done | Award total | Start |
|---|---|---|---|---|
| W912PL24C0020DESIGN BUILD COMBAT RESCUE HELICOPTER (CRH) SIMULATOR | Department of DefenseDepartment of the Army | TUCSON, AZ-06 | $11,420,577.87 | Ends November 13, 2026 |
| 697DCK24F00705AIRPORT TRAFFIC CONTROL TOWER AND CAB MODERNIZATION MINNEAPOLIS-SAINT PAUL INTERNATIONAL AIRPORT (MSP), MINNEAPOLIS, MN BIPARTISAN INFRASTRUCTURE LAW FUNDING | Department of TransportationFederal Aviation Administration | MINNEAPOLIS, MN-05 | $10,922,502 | Ends January 15, 2027 |
| 697DCK24F01123DESIGN BUILD PROJECT TO MODERNIZE THE SLC ATCT, TRACON BUILDING AND BASE BUILDING. | Department of TransportationFederal Aviation Administration | SALT LAKE CITY, UT-02 | $10,910,140.24 | Ends September 30, 2027 |
| DTFASA17C00201IGF::CT::IGF PERFORM ALL WORK FOR THE MAJOR MECHANICAL SUSTAINMENT (MMS) PROJECT AT THE SALT LAKE CITY AIR ROUTE TRAFFIC CONTROL CENTER (ARTCC) IN SALT LAKE CITY, UTAH. | Department of TransportationFederal Aviation Administration | SALT LAKE CITY, UT-02 | $10,061,952.78 | Ends June 5, 2020 |
| 697DCK24F00016ZLA HVAC REFURBISHMENT PROJECT (AHU 200, 300, AND 500) | Department of TransportationFederal Aviation Administration | PALMDALE, CA-27 | $8,546,047.86 | Ends August 16, 2027 |
| 140P1426C0005GRAND TETON NATIONAL PARK (GRTE), TAGGART LAKE AREA RENEWAL - PMIS 314711 | Department of the InteriorNational Park Service | MOOSE, WY-00 | $8,298,013 | Ends November 15, 2027 |
| 697DCK25F00685SALT LAKE CITY, UT AIR ROUTE TRAFFIC CONTROL CENTER (ZLC) UNDERGROUND UTILITIES MODERNIZATION. SCOPE: MODERNIZE THE FACILITY TO REPLACE UNDERGROUND UTILITIES, RENOVATE THE PAVED SURFACE PARKING LOTS AND REPAIR CONCRETE AND GRASS AREAS. THE PROJEC | Department of TransportationFederal Aviation Administration | SALT LAKE CITY, UT-02 | $5,470,473.48 | Ends August 31, 2027 |
| 6973GH26C00043TPS-027 REPLACE SWITCHGEAR MCC | Department of TransportationFederal Aviation Administration | OKLAHOMA CITY, OK-03 | $5,246,537 | Ends March 1, 2028 |
| 697DCK23F00653BUILDING ENVELOPE AND WATER LEAK REPAIRS SAN ANTONIO (SAT) AIRPORT | Department of TransportationFederal Aviation Administration | SAN ANTONIO, TX-21 | $5,070,685.18 | Ends December 18, 2025 |
| 697DCK25F00051AHU & CRAC UNIT REPLACEMENT PROJECT AT FAA'S OAKLAND AIR ROUTE TRAFFIC CONTROL FACILITY IN FREMONT, CA | Department of TransportationFederal Aviation Administration | FREMONT, CA-14 | $4,488,000 | Ends November 23, 2026 |
| 697DCK26F00387CHILLER REPLACEMENT AT DTW ATCT (DETROIT, MI): 1.) REPLACE HVAC COMPONENTS ASSOCIATED WITH THE CHILLER REPLACEMENT, INCLUDING THE FOUNDATIONS, AS SHOWN ON THE DRAWINGS AND OTHER COMPONENTS SHOWN ON THE DRAWINGS. 2.) REPLACE FACILITY BUILDING AUT | Department of TransportationFederal Aviation Administration | DETROIT, MI-13 | $4,177,355 | Ends January 8, 2033 |
| 140P2021C0058THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A NEW VISITOR CONTACT STATION AS A CENTRAL POINT OF SERVICES FOR PARK VISITORS. | Department of the InteriorNational Park Service | BRIAN HEAD, UT-02 | $4,040,131.18 | Ends January 7, 2026 |
| 140P1325C0001ELMA-CREATE UNIVESALLY ACCESSIBLE TRAIL & CAVE EXPERIENCE - THE WORK INCLUDES BUT IS NOT LIMITED TO: CONSTRUCTING .75 MILE IMPROVEMENTS ON EXISTING EL CALDERON TRAIL AND CONSTRUCTION OF A NEW TRAIL TO THE EXISTING VAULT RESTROOM FROM THE PARKING | Department of the InteriorNational Park Service | GRANTS, NM-02 | $3,754,784.85 | Ends November 30, 2026 |
| 697DCK26F00195ESTABLISH CONSTRUCTION CONTRACT FOR THE REPLACEMENT OF THE HVAC SYSTEM AT THE BURLINGTON, VT AIRPORT TRAFFIC CONTROL TOWER IN SOUTH BURLINGTON, VT. REPLACE HVAC SYSTEM AT BTV ATCT AND BASE BUILDING. "IN ACCORDANCE WITH EO 14222 "IMPLEMENTIN | Department of TransportationFederal Aviation Administration | BURLINGTON, VT-00 | $3,104,528.70 | Ends May 5, 2027 |
| 697DCK24F00146A CONTRACTOR WILL PROVIDE ALL SERVICES, SUPPLIES, EQUIPMENT, MATERIALS, LABOR, PERMITS, BONDS, AND TRANSPORTATION TO PERFORM THE WORK DETAILED IN THE SCOPE OF WORK AND APPLICABLE DOCUMENTS FOR THE CONSTRUCTION THE DENVER TECHNICAL OPERATIONS CENTER ( | Department of TransportationFederal Aviation Administration | DENVER, CO-06 | $2,408,443.96 | Ends September 30, 2025 |
| 697DCK23F01104PROVIDE ARCHITECTURAL ENGINEERING DESIGN, CONSTRUCTION DOCUMENTATION, AND SUPPORT DURING PROCUREMENT AS WELL AS ABATEMENT AND CONSTRUCTION SERVICES NECESSARY TO COMPLETELY RENOVATE ENTIRE MENS AND WOMENS MAIN FACILITY RESTROOMS AT ZLA. TO INCLUDE: LE | Department of TransportationFederal Aviation Administration | PALMDALE, CA-27 | $2,405,201.33 | Ends January 30, 2026 |
| 697DCK24F00462LCH ATCT ELECTRICAL UPGRADE | Department of TransportationFederal Aviation Administration | LAKE CHARLES, LA-03 | $1,988,979.80 | Ends October 8, 2026 |
| 697DCK24F00444REMOVE AND REPLACE ALL EXTERIOR CAULKING OF BASE BUILDING & TOWER OF ATCT. REPAIR AND INSTALL METAL FRAMING AND DRYWALL FROM THE FIRST LEVEL TO TENTH LEVEL OF ATCT. | Department of TransportationFederal Aviation Administration | LOS ANGELES, CA-43 | $1,909,397.48 | Ends May 27, 2027 |
| 140P2026C0049THE WORK INCLUDES PARKING LOT, DRIVE AISLE, AND ROADWAY IMPROVEMENTS AT FOUR (4) LOCATIONS WITHIN GOLDEN SPIKE NATIONAL HISTORIC PARK. WORK SPECIFICALLY INCLUDES: PAVEMENT REHABILITATION, NEW CONCRETE SIDEWALK AND ADA PARKING STALLS, CURBING REPAIR, | Department of the InteriorNational Park Service | CORINNE, UT-01 | $1,143,863 | Ends August 29, 2027 |
| 697DCK24F00519CONTRACTOR TO DESIGN-BUILD A STAGING AREA AS OUTLINED IN THE SCOPE OF WORK AND BY FAA APPROVED DESIGN AT THE KANSAS CITY (ZKC) AIR ROUTE TRAFFIC CONTROL CENTER IN OLATHE, KANSAS. | Department of TransportationFederal Aviation Administration | OLATHE, KS-03 | $769,086 | Ends April 10, 2026 |
| 140PP027F0030EO 14398 CAVO COMPLETE EXHIBIT PRE-INSTALL AT VISITOR CENTR | Department of the InteriorDepartmental Offices | CAPULIN, NM-03 | $205,904 | Ends June 18, 2027 |
Subcontracts it reported
A prime contractor reports the subcontracts it gives under an award (first-tier subawards). These are the largest it reported under its three largest awards, from every year of each award.
No subcontract is reported under this vendor’s largest awards.
Lobbying reports and campaign receipts that name this vendor
No lobbying report, organization page or FEC receipt in our saved records has this vendor’s name or its parent company’s name.
A name is matched only when it is the same name under the exact-name rule: letters and numbers alike, "&" read as "and", a leading "the" and one closing legal form (Inc, LLC, Corp, Corporation, Co, LP, LLP) set aside. A near name is never a match. Each match says which name matched.