Public Law 119-60 · S. 1071

National Defense Authorization Act for Fiscal Year 2026: dollars in this law

The text of this law states 442 dollar amounts. 35 are counted as appropriated or authorized, $12,794,305,000 in all.

Not checked yet

Go to the page of National Defense Authorization Act for Fiscal Year 2026

Every amount, in the order the law prints them

Each row is one dollar amount copied from our saved text of the law, with the words printed around it and the rule that sorted it. Only appropriated and authorized amounts count in the total.

AmountKind, and the rule that sorted itSectionWords around it
$66,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2301: AUTHORIZED AIR FORCE CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... Eglin Air Force Base.......................... $182,000,000 Hurlburt Field................................ $66,000,000 MacDill Air Force Base........................ $74,000, ...”

$74,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2301: AUTHORIZED AIR FORCE CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... Hurlburt Field................................ $66,000,000 MacDill Air Force Base........................ $74,000,000 Georgia....................................... Moody Air Force Base.......................... $35,000, ...”

$35,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2301: AUTHORIZED AIR FORCE CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... MacDill Air Force Base........................ $74,000,000 Georgia....................................... Moody Air Force Base.......................... $35,000,000 Robins Air Force Base......................... $28,000, ...”

$28,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2301: AUTHORIZED AIR FORCE CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... .. Moody Air Force Base.......................... $35,000,000 Robins Air Force Base......................... $28,000,000 Louisiana..................................... Barksdale Air Force Base...................... $116,000, ...”

$116,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2301: AUTHORIZED AIR FORCE CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... Robins Air Force Base......................... $28,000,000 Louisiana..................................... Barksdale Air Force Base...................... $116,000,000 Massachusetts................................. Hanscom Air Force Base........................ $55,000, ...”

$55,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2301: AUTHORIZED AIR FORCE CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... .. Barksdale Air Force Base...................... $116,000,000 Massachusetts................................. Hanscom Air Force Base........................ $55,000,000 Mississippi................................... Columbus Air Force Base....................... $14,200, ...”

$14,200,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2301: AUTHORIZED AIR FORCE CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... .. Hanscom Air Force Base........................ $55,000,000 Mississippi................................... Columbus Air Force Base....................... $14,200,000 Missouri...................................... Whiteman Air Force Base....................... $127,600, ...”

$127,600,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2301: AUTHORIZED AIR FORCE CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... ... Columbus Air Force Base....................... $14,200,000 Missouri...................................... Whiteman Air Force Base....................... $127,600,000 New Mexico.................................... Cannon Air Force Base......................... $169,000, ...”

$169,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2301: AUTHORIZED AIR FORCE CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... ... Whiteman Air Force Base....................... $127,600,000 New Mexico.................................... Cannon Air Force Base......................... $169,000,000 Kirtland Air Force Base....................... $200,000, ...”

$200,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2301: AUTHORIZED AIR FORCE CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... ... Cannon Air Force Base......................... $169,000,000 Kirtland Air Force Base....................... $200,000,000 North Carolina................................ Seymour Johnson Air Force Base................ $95,000, ...”

$95,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2301: AUTHORIZED AIR FORCE CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... Kirtland Air Force Base....................... $200,000,000 North Carolina................................ Seymour Johnson Air Force Base................ $95,000,000 Ohio.......................................... Wright-Patterson Air Force Base............... $45,000, ...”

$45,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2301: AUTHORIZED AIR FORCE CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... .. Seymour Johnson Air Force Base................ $95,000,000 Ohio.......................................... Wright-Patterson Air Force Base............... $45,000,000 Oklahoma...................................... Tinker Air Force Base......................... $497,000, ...”

$497,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2301: AUTHORIZED AIR FORCE CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... ... Wright-Patterson Air Force Base............... $45,000,000 Oklahoma...................................... Tinker Air Force Base......................... $497,000,000 South Dakota.................................. Ellsworth Air Force Base...................... $378,000, ...”

$378,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2301: AUTHORIZED AIR FORCE CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... ... Tinker Air Force Base......................... $497,000,000 South Dakota.................................. Ellsworth Air Force Base...................... $378,000,000 Texas......................................... Dyess Air Force Base.......................... $90,800, ...”

$90,800,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2301: AUTHORIZED AIR FORCE CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... .. Ellsworth Air Force Base...................... $378,000,000 Texas......................................... Dyess Air Force Base.......................... $90,800,000 Goodfellow Air Force Base..................... $112,000, ...”

$112,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2301: AUTHORIZED AIR FORCE CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... ... Dyess Air Force Base.......................... $90,800,000 Goodfellow Air Force Base..................... $112,000,000 Utah.......................................... Hill Air Force Base........................... $250,000, ...”

$250,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2301: AUTHORIZED AIR FORCE CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... Goodfellow Air Force Base..................... $112,000,000 Utah.......................................... Hill Air Force Base........................... $250,000,000 ------------------------------------------------------------------------------------------------------------- ...”

$29,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2301: AUTHORIZED AIR FORCE CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... -------------------------------------------------------------------- Diego Garcia.................................. Naval Support Facility Diego Garcia............. $29,000,000 Germany....................................... Ramstein Air Base............................... $44,000, ...”

$44,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2301: AUTHORIZED AIR FORCE CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... .. Naval Support Facility Diego Garcia............. $29,000,000 Germany....................................... Ramstein Air Base............................... $44,000,000 Greenland..................................... Pituffik Space Base............................. $32,000, ...”

$32,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2301: AUTHORIZED AIR FORCE CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... .. Ramstein Air Base............................... $44,000,000 Greenland..................................... Pituffik Space Base............................. $32,000,000 Norway........................................ Royal Norwegian Air Force Base Rygge............ $72,000, ...”

$72,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2301: AUTHORIZED AIR FORCE CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... .. Pituffik Space Base............................. $32,000,000 Norway........................................ Royal Norwegian Air Force Base Rygge............ $72,000,000 United Kingdom................................ Royal Air Force Feltwell........................ $20,000, ...”

$20,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2301: AUTHORIZED AIR FORCE CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... .. Royal Norwegian Air Force Base Rygge............ $72,000,000 United Kingdom................................ Royal Air Force Feltwell........................ $20,000,000 Royal Air Force Lakenheath...................... $253,000, ...”

$253,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2301: AUTHORIZED AIR FORCE CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... ... Royal Air Force Feltwell........................ $20,000,000 Royal Air Force Lakenheath...................... $253,000,000 ------------------------------------------------------------------------------------------------------------- ...”

$12,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2304: EXTENSION OF AUTHORITY TO CARRY OUT FISCAL YEAR 2017 PROJECT AT SPANGDAHLEM AIR BASE, GERMANY

“... -------------------------------------------------------------------- Germany............................... Spangdahlem Air Base...... ERI: F/A-22 Low $12,000,000 Observable/Comp Repair ...”

$87,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2305: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2019 PROJECTS

“... -------------------------------------------------------------------- United Kingdom........................ Royal Air Force Fairford.. EDI: Construct DABS-FEV $87,000,000 Storage................. ...”

$19,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2305: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2019 PROJECTS

“... Storage................. .......................... EDI: Munitions Holding $19,000,000 Area.................... --------------- ...”

$43,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2306: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2020 PROJECTS

“... -------------------------------------------------------------------- Florida............................... Tyndall Air Force Base.... Deployment Center/Flight $43,000,000 Line Dining/AAFES....... Georgia........ ...”

$12,500,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2306: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2020 PROJECTS

“... Line Dining/AAFES....... Georgia............................... Moody Air Force Base...... 41 RQS HH-60W Apron...... $12,500,000 ------------------------------------------------------------------------------------------------------------- ...”

$66,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2307: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2022 PROJECTS

“... -------------------------------------------------------------------- Massachusetts......................... Hanscom Air Force Base.... NC3 Acquisitions $66,000,000 Management Facility..... United Kingdom. ...”

$24,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2307: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2022 PROJECTS

“... Management Facility..... United Kingdom........................ Royal Air Force Lakenheath F-35A Child Development $24,000,000 Center.................. ...”

$31,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2307: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2022 PROJECTS

“... Center.................. F-35A Munition Inspection $31,000,000 Facility................ ...”

$49,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2307: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2022 PROJECTS

“... Facility................ F-35A Weapons Load $49,000,000 Training Facility....... --------------- ...”

$97,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2308: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2023 PROJECTS

“... -------------------------------------------------------------------- Florida............................... Patrick Space Force Base.. Consolidated $97,000,000 Communications Center... Norway......... ...”

$8,200,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2308: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2023 PROJECTS

“... Communications Center... Norway................................ Rygge Air Station......... EDI: Base Perimeter $8,200,000 Security Fence.......... Oklahoma....... ...”

$30,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2308: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2023 PROJECTS

“... Security Fence.......... Oklahoma.............................. Tinker Air Force Base..... Facility And Land $30,000,000 Acquisition (MROTC)..... Texas.......... ...”

$29,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIII, Section 2308: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2023 PROJECTS

“... Acquisition (MROTC)..... Texas................................. Joint Base San Antonio- Child Development Center. $29,000,000 Randolph................. ------------------------------------------ ...”

$32,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2401: AUTHORIZED DEFENSE AGENCIES CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... -------------------------------------------------------------------- Alabama........................................ DLA Distribution Center Anniston.............. $32,000,000 California..................................... Naval Base Coronado........................... $75,900, ...”

$75,900,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2401: AUTHORIZED DEFENSE AGENCIES CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... ... DLA Distribution Center Anniston.............. $32,000,000 California..................................... Naval Base Coronado........................... $75,900,000 Travis Air Force Base......................... $49,980, ...”

$49,980,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2401: AUTHORIZED DEFENSE AGENCIES CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... ... Naval Base Coronado........................... $75,900,000 Travis Air Force Base......................... $49,980,000 Florida........................................ Homestead Air Reserve Base.................... $33,000, ...”

$33,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2401: AUTHORIZED DEFENSE AGENCIES CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... Travis Air Force Base......................... $49,980,000 Florida........................................ Homestead Air Reserve Base.................... $33,000,000 Georgia........................................ Fort Benning.................................. $127,375, ...”

$127,375,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2401: AUTHORIZED DEFENSE AGENCIES CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... .... Homestead Air Reserve Base.................... $33,000,000 Georgia........................................ Fort Benning.................................. $127,375,000 Maryland....................................... Fort Meade.................................... $26,600, ...”

$26,600,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2401: AUTHORIZED DEFENSE AGENCIES CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... ... Fort Benning.................................. $127,375,000 Maryland....................................... Fort Meade.................................... $26,600,000 North Carolina................................. Fort Bragg.................................... $333,200, ...”

$333,200,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2401: AUTHORIZED DEFENSE AGENCIES CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... .... Fort Meade.................................... $26,600,000 North Carolina................................. Fort Bragg.................................... $333,200,000 Marine Corps Base Camp Lejeune................ $306,400, ...”

$306,400,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2401: AUTHORIZED DEFENSE AGENCIES CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... .... Fort Bragg.................................... $333,200,000 Marine Corps Base Camp Lejeune................ $306,400,000 Pennsylvania................................... Defense Distribution Depot New Cumberland..... $90,000, ...”

$90,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2401: AUTHORIZED DEFENSE AGENCIES CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... Marine Corps Base Camp Lejeune................ $306,400,000 Pennsylvania................................... Defense Distribution Depot New Cumberland..... $90,000,000 Harrisburg Air National Guard Base............ $13,400, ...”

$13,400,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2401: AUTHORIZED DEFENSE AGENCIES CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... ... Defense Distribution Depot New Cumberland..... $90,000,000 Harrisburg Air National Guard Base............ $13,400,000 Puerto Rico.................................... Punta Borinquen............................... $155,000, ...”

$155,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2401: AUTHORIZED DEFENSE AGENCIES CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... Harrisburg Air National Guard Base............ $13,400,000 Puerto Rico.................................... Punta Borinquen............................... $155,000,000 Texas.......................................... NSA Texas..................................... $500,000, ...”

$500,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2401: AUTHORIZED DEFENSE AGENCIES CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... .... Punta Borinquen............................... $155,000,000 Texas.......................................... NSA Texas..................................... $500,000,000 Virginia....................................... Pentagon...................................... $34,000, ...”

$34,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2401: AUTHORIZED DEFENSE AGENCIES CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... ... NSA Texas..................................... $500,000,000 Virginia....................................... Pentagon...................................... $34,000,000 Washington..................................... Fairchild Air Force Base...................... $85,000, ...”

$85,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2401: AUTHORIZED DEFENSE AGENCIES CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... ... Pentagon...................................... $34,000,000 Washington..................................... Fairchild Air Force Base...................... $85,000,000 Manchester Tank Farm.......................... $71,000, ...”

$71,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2401: AUTHORIZED DEFENSE AGENCIES CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... ... Fairchild Air Force Base...................... $85,000,000 Manchester Tank Farm.......................... $71,000,000 ------------------------------------------------------------------------------------------------------------- ...”

$16,700,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2401: AUTHORIZED DEFENSE AGENCIES CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... -------------------------------------------------------------------- Germany........................................ U.S. Army Garrison Rheinland-Pfalz............ $16,700,000 United Kingdom................................. Royal Air Force Lakenheath.................... $433,600, ...”

$433,600,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2401: AUTHORIZED DEFENSE AGENCIES CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... .... U.S. Army Garrison Rheinland-Pfalz............ $16,700,000 United Kingdom................................. Royal Air Force Lakenheath.................... $433,600,000 Royal Air Force Mildenhall.................... $45,000, ...”

$45,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2401: AUTHORIZED DEFENSE AGENCIES CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... ... Royal Air Force Lakenheath.................... $433,600,000 Royal Air Force Mildenhall.................... $45,000,000 ------------------------------------------------------------------------------------------------------------- ...”

$20,600,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2402: AUTHORIZED ENERGY RESILIENCE AND CONSERVATION INVESTMENT PROGRAM PROJECTS

“... -------------------------------------------------------------------- California..................................... Armed Forces Reserve Center Mountain View..... $20,600,000 Travis Air Force Base......................... $25,120, ...”

$25,120,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2402: AUTHORIZED ENERGY RESILIENCE AND CONSERVATION INVESTMENT PROGRAM PROJECTS

“... ... Armed Forces Reserve Center Mountain View..... $20,600,000 Travis Air Force Base......................... $25,120,000 Florida........................................ Marine Corps Support Facility Blount Island... $30,500, ...”

$30,500,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2402: AUTHORIZED ENERGY RESILIENCE AND CONSERVATION INVESTMENT PROGRAM PROJECTS

“... Travis Air Force Base......................... $25,120,000 Florida........................................ Marine Corps Support Facility Blount Island... $30,500,000 Guam........................................... Naval Base Guam............................... $63,010, ...”

$63,010,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2402: AUTHORIZED ENERGY RESILIENCE AND CONSERVATION INVESTMENT PROGRAM PROJECTS

“... ... Marine Corps Support Facility Blount Island... $30,500,000 Guam........................................... Naval Base Guam............................... $63,010,000 Massachusetts.................................. Cape Cod Space Force Station.................. $124,000, ...”

$124,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2402: AUTHORIZED ENERGY RESILIENCE AND CONSERVATION INVESTMENT PROGRAM PROJECTS

“... .... Naval Base Guam............................... $63,010,000 Massachusetts.................................. Cape Cod Space Force Station.................. $124,000,000 New Mexico..................................... White Sands Missile Range..................... $38,500, ...”

$38,500,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2402: AUTHORIZED ENERGY RESILIENCE AND CONSERVATION INVESTMENT PROGRAM PROJECTS

“... ... Cape Cod Space Force Station.................. $124,000,000 New Mexico..................................... White Sands Missile Range..................... $38,500,000 North Carolina................................. Fort Bragg.................................... $80,000, ...”

$80,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2402: AUTHORIZED ENERGY RESILIENCE AND CONSERVATION INVESTMENT PROGRAM PROJECTS

“... ... White Sands Missile Range..................... $38,500,000 North Carolina................................. Fort Bragg.................................... $80,000,000 Texas.......................................... Camp Swift.................................... $19,800, ...”

$19,800,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2402: AUTHORIZED ENERGY RESILIENCE AND CONSERVATION INVESTMENT PROGRAM PROJECTS

“... ... Fort Bragg.................................... $80,000,000 Texas.......................................... Camp Swift.................................... $19,800,000 Fort Hood..................................... $34,500, ...”

$34,500,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2402: AUTHORIZED ENERGY RESILIENCE AND CONSERVATION INVESTMENT PROGRAM PROJECTS

“... ... Camp Swift.................................... $19,800,000 Fort Hood..................................... $34,500,000 Utah........................................... Camp Williams................................. $28,500, ...”

$28,500,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2402: AUTHORIZED ENERGY RESILIENCE AND CONSERVATION INVESTMENT PROGRAM PROJECTS

“... Fort Hood..................................... $34,500,000 Utah........................................... Camp Williams................................. $28,500,000 ------------------------------------------------------------------------------------------------------------- ...”

$73,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2402: AUTHORIZED ENERGY RESILIENCE AND CONSERVATION INVESTMENT PROGRAM PROJECTS

“... -------------------------------------------------------------------- Germany........................................ United States Army Garrison Ansbach (Storck $73,000,000 Barracks). Japan.......................................... ...”

$146,800,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2402: AUTHORIZED ENERGY RESILIENCE AND CONSERVATION INVESTMENT PROGRAM PROJECTS

“... ,000,000 Barracks). Japan.......................................... Marine Corps Air Station Iwakuni.............. $146,800,000 ------------------------------------------------------------------------------------------------------------- ...”

$33,200,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2404: EXTENSION OF AUTHORITY TO CARRY OUT FISCAL YEAR 2019 PROJECT AT IWAKUNI, JAPAN

“... ------------------------------------------------------------------------------- Japan................................ Iwakuni................ Fuel Pier.............. $33,200,000 ------------------------------------------------------------------------------------------------------------- ...”

$17,593,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2405: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2022 PROJECTS

“... tor Plant and Microgrid Controls........ Georgia Fort Benning..... 4.8 MW Generation $17,593,000 and Microgrid... Fort Stewart..... 10 MW Generation ...”

$22,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2405: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2022 PROJECTS

“... a Fort Benning..... 4.8 MW Generation $17,593,000 and Microgrid... Fort Stewart..... 10 MW Generation $22,000,000 Plant, with Microgrid ...”

$27,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2405: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2022 PROJECTS

“... Plant, with Microgrid Controls........ New York Fort Drum........ Wellfield Field $27,000,000 Expansion Project......... North Ca ...”

$7,705,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2405: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2022 PROJECTS

“... $27,000,000 Expansion Project......... North Carolina Fort Bragg....... Emergency Water $7,705,000 System.......... Ohio Springfiel ...”

$4,700,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2405: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2022 PROJECTS

“... . Emergency Water $7,705,000 System.......... Ohio Springfield- Base-Wide $4,700,000 Beckley Microgrid With Municipal Natural Gas ...”

$4,780,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2405: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2022 PROJECTS

“... rator, Photovoltaic and Battery Storage. Tennessee Memphis PV Arrays and $4,780,000 International Battery Storage. Airport......... -------------------- ...”

$151,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2406: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2023 PROJECTS

“... Project Authorized Amount ------------------------------------------------------------------------ Alabama Redstone Arsenal. MSIC Advanced $151,000,000 Analysis Facility Phase 2 ...”

$25,560,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2406: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2023 PROJECTS

“... alysis Facility Phase 2 (INC)........... California Marine Corps Microgrid and $25,560,000 Mountain Warfare Backup Power.... Training Center. Florida Nav ...”

$2,400,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2406: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2023 PROJECTS

“... grid and $25,560,000 Mountain Warfare Backup Power.... Training Center. Florida Naval Air Station Facility Energy $2,400,000 Jacksonville.... Operations Center ...”

$25,400,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2406: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2023 PROJECTS

“... Center Renovation...... Georgia Fort Stewart- Power Generation $25,400,000 Hunter Army and Microgrid... Airfield........ Nav ...”

$11,200,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2406: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2023 PROJECTS

“... Generation $25,400,000 Hunter Army and Microgrid... Airfield........ Naval Submarine SCADA $11,200,000 Base Kings Bay.. Modernization... Hawaii Joint Base Pearl Primary ...”

$25,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2406: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2023 PROJECTS

“... Naval Submarine SCADA $11,200,000 Base Kings Bay.. Modernization... Hawaii Joint Base Pearl Primary $25,000,000 Harbor-Hickam... Electrical Distribution.... Kansas ...”

$25,780,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2406: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2023 PROJECTS

“... $25,000,000 Harbor-Hickam... Electrical Distribution.... Kansas Fort Riley....... Power Generation $25,780,000 and Microgrid... Texas Fort Cavazos..... Power Generation ...”

$31,500,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2406: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2023 PROJECTS

“... Fort Riley....... Power Generation $25,780,000 and Microgrid... Texas Fort Cavazos..... Power Generation $31,500,000 and Microgrid... U.S. Army Reserve Power Generation ...”

$9,600,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2406: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2023 PROJECTS

“... Fort Cavazos..... Power Generation $31,500,000 and Microgrid... U.S. Army Reserve Power Generation $9,600,000 Center, Conroe.. and Microgrid... Virginia Dam Neck......... SOF Operations ...”

$26,600,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXIV, Section 2406: EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2023 PROJECTS

“... U.S. Army Reserve Power Generation $9,600,000 Center, Conroe.. and Microgrid... Virginia Dam Neck......... SOF Operations $26,600,000 Building Addition........ --------- ...”

$531,832,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXV, Subtitle A, Section 2502: AUTHORIZATION OF APPROPRIATIONS, NATO

“... --------------------------------------------------------------------- Worldwide Unspecified.......................... NATO Security Investment Program.............. $531,832,000 ------------------------------------------------------------------------------------------------------------- ...”

$24,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXV, Subtitle B, Section 2511: REPUBLIC OF KOREA FUNDED CONSTRUCTION PROJECTS

“... -------------------------------------------------------------------------------- Army................................. Camp Humphreys......... Access Control Point... $24,000,000 Runway................. $180,000,000 Navy... ...”

$180,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXV, Subtitle B, Section 2511: REPUBLIC OF KOREA FUNDED CONSTRUCTION PROJECTS

“... ................. Camp Humphreys......... Access Control Point... $24,000,000 Runway................. $180,000,000 Navy................................. Pohang Air Base........ Replace Concrete Apron. $22,000,000 Navy.... ...”

$22,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXV, Subtitle B, Section 2511: REPUBLIC OF KOREA FUNDED CONSTRUCTION PROJECTS

“... Runway................. $180,000,000 Navy................................. Pohang Air Base........ Replace Concrete Apron. $22,000,000 Navy................................. Yecheon Air Base....... Replace Magazine $59,000,000 ...”

$59,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXV, Subtitle B, Section 2511: REPUBLIC OF KOREA FUNDED CONSTRUCTION PROJECTS

“... ................. Pohang Air Base........ Replace Concrete Apron. $22,000,000 Navy................................. Yecheon Air Base....... Replace Magazine $59,000,000 Munitions Supply Area. Air Force............ ...”

$86,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXV, Subtitle B, Section 2511: REPUBLIC OF KOREA FUNDED CONSTRUCTION PROJECTS

“... Munitions Supply Area. Air Force............................ Gimhae Air Base........ Repair Contingency $86,000,000 Hospital. Air Force......................... ...”

$57,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXV, Subtitle B, Section 2511: REPUBLIC OF KOREA FUNDED CONSTRUCTION PROJECTS

“... 0,000 Hospital. Air Force............................ Gwangju Air Base....... Hydrant Fuel System.... $57,000,000 Air Force............................ Osan Air Base.......... Aircraft Corrosion $25,000,000 ...”

$25,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXV, Subtitle B, Section 2511: REPUBLIC OF KOREA FUNDED CONSTRUCTION PROJECTS

“... ................. Gwangju Air Base....... Hydrant Fuel System.... $57,000,000 Air Force............................ Osan Air Base.......... Aircraft Corrosion $25,000,000 Control Facility Part ...”

$6,200,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXV, Subtitle B, Section 2512: REPUBLIC OF POLAND FUNDED CONSTRUCTION PROJECTS

“... -------------------------------------------------------------------------------- Army................................. Drawsko Pomorskie Information Systems $6,200,000 Training Area (DPTA). Facility. Army.............................. ...”

$199,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXV, Subtitle B, Section 2512: REPUBLIC OF POLAND FUNDED CONSTRUCTION PROJECTS

“... 0,000 Training Area (DPTA). Facility. Army................................. Powdiz................. Barracks and Dining $199,000,000 Facility-Phase 2. ...”

$91,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXV, Subtitle B, Section 2512: REPUBLIC OF POLAND FUNDED CONSTRUCTION PROJECTS

“... Facility-Phase 2. Rotary Wing Aircraft $91,000,000 Maintenance Hangar. Air Force............... ...”

$18,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXV, Subtitle B, Section 2512: REPUBLIC OF POLAND FUNDED CONSTRUCTION PROJECTS

“... Maintenance Hangar. Air Force............................ Lask Air Base.......... Communication $18,000,000 Infrastructure. Air Force................... ...”

$111,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXV, Subtitle B, Section 2512: REPUBLIC OF POLAND FUNDED CONSTRUCTION PROJECTS

“... Infrastructure. Air Force............................ Wroclaw Air Base....... Combined Aerial Port $111,000,000 Facilities. ...”

$13,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXV, Subtitle B, Section 2512: REPUBLIC OF POLAND FUNDED CONSTRUCTION PROJECTS

“... 000 Facilities. Contingency Beddown $13,000,000 Area. ...”

$44,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXV, Subtitle B, Section 2512: REPUBLIC OF POLAND FUNDED CONSTRUCTION PROJECTS

“... 3,000,000 Area. Hot Cargo Pad/Munition $44,000,000 Handling/Holding Area. ...”

$22,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXV, Subtitle B, Section 2512: REPUBLIC OF POLAND FUNDED CONSTRUCTION PROJECTS

“... Handling/Holding Area. Railhead and Rail $22,000,000 Extension. --------------------------------- ...”

$55,000,000Not sortedThe words around this amount fit none of the rules.Division B, Title XXVI, Section 2601: AUTHORIZED ARMY NATIONAL GUARD CONSTRUCTION AND LAND ACQUISITION PROJECTS

“... -------------------------------------------------------------------- Guam........................................... Joint Forces Headquarters - Guam.............. $55,000,000 Indiana........................................ Shelbyville Armory............................ $55,000, ...”

Where this comes from

The amounts are read from our own saved copy of the official text. The code beside it is its fingerprint, a short code that changes if the file’s contents change.

Public Law 119-60, official text · Saved October 5, 2026 · Fingerprint 5656a3db271313ad

Suggest a tool

Suggest a tool

A person reads each idea before it appears. Links are not accepted. Do not include personal information.

See all ideas and vote