To direct the Secretary of the Interior to carry out a feasibility
study on a selective water withdrawal system at Glen Canyon Dam, and
for other purposes.
_______________________________________________________________________
IN THE SENATE OF THE UNITED STATES
January 29, 2026
Mr. Lee (for himself and Mr. Curtis) introduced the following bill;
which was read twice and referred to the Committee on Energy and
Natural Resources
September 17, 2026
Reported by Mr. Lee, with an amendment
[Strike out all after the enacting clause and insert the part printed
in italic]
_______________________________________________________________________
A BILL
To direct the Secretary of the Interior to carry out a feasibility
study on a selective water withdrawal system at Glen Canyon Dam, and
for other purposes.
Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,
<DELETED>SECTION 1. GLEN CANYON DAM SELECTIVE WATER WITHDRAWAL SYSTEM
FEASIBILITY STUDY.</DELETED>
<DELETED> (a) In General.--The Secretary of the Interior (acting
through the Commissioner of Reclamation) (referred to in this section
as the ``Secretary''), in consultation with the Secretary of Energy and
Colorado River Storage Project power contractors, shall carry out a
feasibility study (including all hydrological modeling) on a selective
water withdrawal system at Glen Canyon Dam to optimize hydropower
generation when releasing cold water from Glen Canyon Dam, while also
preventing entrainment of invasive species, pursuant to the 2016 Long-
Term Experimental and Management Plan Record of Decision and the 2024
Long-Term Experimental and Management Plan Supplemental Environmental
Impact Statement and Record of Decision.</DELETED>
<DELETED> (b) Feasibility Determination.--If the Secretary
determines that a selective water withdrawal system alternative studied
under subsection (a) is feasible under the reclamation laws, the
Secretary may, if the Colorado River Storage Project power contractors
concur with the alternative chosen, begin compliance with, and
construction of, the chosen alternative.</DELETED>
<DELETED> (c) Feasibility Study Deadline.--The Secretary shall
complete the feasibility study required under subsection (a) not later
than 18 months after the date of enactment of this Act.</DELETED>
<DELETED> (d) Funding.--</DELETED>
<DELETED> (1) In general.--The costs of the feasibility
study under subsection (a) shall be paid for by the Secretary
using appropriated funds.</DELETED>
<DELETED> (2) Treatment of funds.--Any Federal funds made
available to carry out this section shall be nonreimbursable
and nonreturnable to the United States.</DELETED>
<DELETED> (3) Identification of funds.--Not later than 90
days after the date of enactment of this Act, the Secretary, in
consultation with the Secretary of Energy and Colorado River
Storage Project power contractors, shall identify sources of
available funds to carry out this section.</DELETED>
<DELETED> (e) Effect.--Nothing in this section affects the post-2026
Colorado River reservoir operations guidelines and strategies for Lake
Powell and Lake Mead in effect before, on, or after the date of
enactment of this Act.</DELETED>
SECTION 1. GLEN CANYON DAM FEASIBILITY STUDY.
(a) In General.--The Secretary of the Interior (acting through the
Commissioner of Reclamation) (referred to in this section as the
``Secretary''), in consultation with the Secretary of Energy, the
Director of the United States Fish and Wildlife Service, the Director
of the United States Geological Survey, the Colorado River Basin
States, and Colorado River Storage Project power contractors, shall
carry out a feasibility study (including all hydrological modeling) to
analyze alternatives (including infrastructure upgrades) to address
downstream invasive species at Glen Canyon Dam.
(b) Included Alternatives.--The alternatives analyzed under
subsection (a) may include a thermal curtain or a selective water
withdrawal system at Glen Canyon Dam to optimize hydropower generation
when releasing cold water from Glen Canyon Dam, while also preventing
entrainment of invasive species, pursuant to the 2016 Long-Term
Experimental and Management Plan Supplemental Environmental Impact
Statement and Record of Decision and section 1802 of the Grand Canyon
Protection Act of 1992 (Public Law 102-575; 106 Stat. 4669).
(c) Feasibility Determination.--If the Secretary determines that an
alternative studied under subsection (a) is feasible under the
reclamation laws, the Secretary may initiate design, construction, and
associated activities of, as applicable, the recommended alternative,
including any necessary policy actions allowable under the reclamation
laws.
(d) Feasibility Report.--After completion of the feasibility study
required under subsection (a), the Secretary shall develop a summarized
feasibility study report that includes, at a minimum--
(1) an analysis of the alternatives analyzed and
identification of the recommended alternative;
(2) an allocation of the construction, operation,
maintenance, and replacement costs of the recommended
alternative to the authorized purposes of the Colorado River
Storage Project;
(3) the major structural features and nonstructural
features of the recommended alternative, any special
considerations for implementation of the recommended
alternative, and the estimated cost of implementation of the
recommended alternative;
(4) an analysis of the effects of the recommended
alternative on hydropower production and rates, which shall be
developed in consultation with the Western Area Power
Administration;
(5) a recommendation of the Secretary on whether--
(A) the recommended alternative is found to be
technically and financially feasible in accordance with
the reclamation laws; and
(B) the recommended alternative should be
authorized for construction; and
(6) any other recommendations determined to be necessary by
the Secretary.
(e) Feasibility Study and Feasibility Report Deadlines.--The
Secretary shall--
(1) not later than 18 months after the date of enactment of
this Act, complete the feasibility study required under
subsection (a); and
(2) not later than 90 days after the date on which the
Secretary completes the feasibility report required under
subsection (d), submit to the Committee on Energy and Natural
Resources of the Senate and the Committee on Natural Resources
of the House of Representatives the feasibility report required
under that subsection.
(f) Funding.--
(1) In general.--The costs of the feasibility study
required under subsection (a) shall be paid for by the
Secretary using appropriated funds.
(2) Treatment of funds.--Any Federal funds made available
to carry out this section shall be nonreimbursable and
nonreturnable to the United States.
(3) Identification of funds.--Not later than 90 days after
the date of enactment of this Act, the Secretary, in
consultation with the Secretary of Energy and Colorado River
Storage Project power contractors, shall identify sources of
available funds to carry out this section.
(g) Effect.--Nothing in this section affects the criteria for the
coordinated long-range operations of Colorado River reservoirs pursuant
to section 602 of the Colorado River Basin Project Act (Public Law 90-
537; 82 Stat. 900).
(h) Termination of Authority.--The authority provided by this
section expires on the date that is 5 years after the date of enactment
of this Act.
Calendar No. 653
119th CONGRESS
2d Session
S. 3743
_______________________________________________________________________
A BILL
To direct the Secretary of the Interior to carry out a feasibility
study on a selective water withdrawal system at Glen Canyon Dam, and
for other purposes.
_______________________________________________________________________
September 17, 2026
Reported with an amendment