Bills · 119th Congress · H.Res. 290

Recognizing that the retirement of nonintermittent electric generation facilities, before facilities with equal or greater reliability attributes are available, is a threat to the reliability of the United States electric grid.

IntroducedConfirmed from the official record

Sponsored by Julie Fedorchak RRepublican, introduced . Policy area, as Congress files it: Energy.

Status is read from the official actions by their Library of Congress codes: Became Public Law (36000) or a law number on the bill reads "Became law"; Vetoed (31000) reads "Vetoed"; Presented to President (28000) reads "Sent to the President"; passed or agreed to in the House (8000) and in the Senate (17000) reads "Passed both chambers"; one of them alone reads "Passed the House" or "Passed the Senate" ("Agreed to" for a resolution); reported to the House (5000) or the Senate (14000) reads "Reported by committee"; anything else reads "Introduced".

Source: Congress.gov data service (Library of Congress). Text versions: our copies of govinfo.gov’s files. Our copy was saved October 15, 2026.

Every bill introduced

Cosponsors

1 cosponsor.

Cosponsors
MemberJoined
Laurel M. Lee RRepublicanOriginal cosponsor

Text

Versions of the text
VersionDateOur copy
Introduced in HouseRead our copyThe official file

Actions

  1. Referred to the House Committee on Energy and Commerce.
  2. Submitted in House
  3. Submitted in House

Committees

  • Energy and Commerce Committee (House)Referred To, April 2, 2025

Hearings

We hold hearing records only for bills that became law.

Who lobbied on this bill

Not checked yet

No lobbying report we hold names H.Res. 290.

Suggest a tool

Suggest a tool

A person reads each idea before it appears. Links are not accepted. Do not include personal information.

See all ideas and vote