H.R. 10989: the bill

[Congressional Bills 119th Congress]
[From the U.S. Government Publishing Office]
[H.R. 10989 Introduced in House (IH)]

<DOC>






119th CONGRESS
  2d Session
                               H. R. 10989

 To amend the Federal Power Act to provide that activities to maintain 
or increase the capacity of the electric grid within certain areas are 
 a category of actions designated as being categorically excluded from 
  the preparation of an environmental assessment or an environmental 
 impact statement under the National Environmental Policy Act of 1969, 
                        and for other purposes.


_______________________________________________________________________


                    IN THE HOUSE OF REPRESENTATIVES

                           November 10, 2026

 Mr. Vindman introduced the following bill; which was referred to the 
                    Committee on Energy and Commerce

_______________________________________________________________________

                                 A BILL


 
 To amend the Federal Power Act to provide that activities to maintain 
or increase the capacity of the electric grid within certain areas are 
 a category of actions designated as being categorically excluded from 
  the preparation of an environmental assessment or an environmental 
 impact statement under the National Environmental Policy Act of 1969, 
                        and for other purposes.

    Be it enacted by the Senate and House of Representatives of the 
United States of America in Congress assembled,

SECTION 1. SHORT TITLE.

    This Act may be cited as the ``Smart Transmission Line Placement 
Act''.

SEC. 2. CATEGORICAL EXCLUSION FOR RECONDUCTORING.

    The Federal Power Act is amended by inserting after section 216 (16 
U.S.C. 824p) the following:

``SEC. 216A. GRID CAPACITY EXPANSION IN EXISTING RIGHTS-OF-WAY.

    ``(a) Definitions.--In this section:
            ``(1) Applicable electrical standard.--The term `applicable 
        electrical standard' includes--
                    ``(A) a reliability standard (as defined in section 
                215(a)); and
                    ``(B) an applicable standard of the National 
                Electrical Safety Code published by the Institute of 
                Electrical and Electronics Engineers Standards 
                Association.
            ``(2) Covered area.--The term `covered area' means an 
        area--
                    ``(A) within an existing right-of-way; or
                    ``(B) within the minimum additional area adjacent 
                to an existing right-of-way that is necessary--
                            ``(i) to comply with applicable electrical 
                        standards; or
                            ``(ii) to complete an activity described in 
                        subsection (b).
            ``(3) Covered facility.--The term `covered facility' means 
        an existing electric transmission or distribution facility or 
        associated infrastructure (including an electrical substation) 
        that is located within a covered area.
    ``(b) Exemptions.--
            ``(1) In general.--Activities to maintain or increase the 
        capacity of the electric grid within a covered area, and any 
        Federal agency action authorizing such activities--
                    ``(A) are a category of actions designated as being 
                categorically excluded from the preparation of an 
                environmental assessment or an environmental impact 
                statement under the National Environmental Policy Act 
                of 1969 (42 U.S.C. 4321 et seq.); and
                    ``(B) shall not be considered to be--
                            ``(i) a major Federal action for purposes 
                        of that Act; or
                            ``(ii) an undertaking for purposes of 
                        section 306108 of title 54, United States Code.
            ``(2) Inclusions.--The activities described in paragraph 
        (1) include--
                    ``(A) any repair, maintenance, replacement, 
                upgrade, rebuilding, modification, optimization, minor 
                relocation of, or addition to, a covered facility, 
                including--
                            ``(i) reconductoring;
                            ``(ii) an increase in operating voltage;
                            ``(iii) a circuit addition or adjustment; 
                        and
                            ``(iv) installation of advanced 
                        transmission technologies (as defined in 
                        section 1223(a) of the Energy Policy Act of 
                        2005 (42 U.S.C. 16422(a)));
                    ``(B) any minimum widening of an existing right-of-
                way associated with an activity described in 
                subparagraph (A) that--
                            ``(i) is necessary to comply with 
                        applicable electrical standards; or
                            ``(ii) remains within a covered area;
                    ``(C) an addition of energy storage at or near a 
                covered facility; and
                    ``(D) the addition of a parallel circuit within an 
                existing right-of-way.''.

SEC. 3. ELECTRIC GRID PROJECTS.

    (a) Definition of Previously Disturbed or Developed.--In this 
section, the term ``previously disturbed or developed'' has the meaning 
given the term in section 1021.410(g)(1) of title 10, Code of Federal 
Regulations (or successor regulations).
    (b) Rulemaking.--Not later than 180 days after the date of 
enactment of this Act, to facilitate timely permitting, the Secretary 
of the Interior and the Secretary of Agriculture shall each develop or 
adopt 1 or more categorical exclusions, including allowing for 
extraordinary circumstances under which the categorical exclusion shall 
not be available, under the National Environmental Policy Act of 1969 
(42 U.S.C. 4321 et seq.) for the following activities:
            (1) Placement of an electric transmission or distribution 
        facility in an approved right-of-way corridor, including a 
        corridor designated under section 368 of the Energy Policy Act 
        of 2005 (42 U.S.C. 15926).
            (2) Any repair, maintenance, replacement, upgrade, 
        modification, optimization, or minor relocation of, or addition 
        to, an existing electric transmission or distribution facility 
        or associated infrastructure, including electrical substations, 
        within an existing right-of-way or on otherwise previously 
        disturbed or developed land, including reconductoring and 
        installation of grid-enhancing technologies.
            (3) Construction, operation, upgrade, or decommissioning of 
        a battery or other energy storage technology on previously 
        disturbed or developed land.
                                 <all>