[Congressional Bills 119th Congress]
[From the U.S. Government Publishing Office]
[H.R. 10989 Introduced in House (IH)]
<DOC>
119th CONGRESS
2d Session
H. R. 10989
To amend the Federal Power Act to provide that activities to maintain
or increase the capacity of the electric grid within certain areas are
a category of actions designated as being categorically excluded from
the preparation of an environmental assessment or an environmental
impact statement under the National Environmental Policy Act of 1969,
and for other purposes.
_______________________________________________________________________
IN THE HOUSE OF REPRESENTATIVES
November 10, 2026
Mr. Vindman introduced the following bill; which was referred to the
Committee on Energy and Commerce
_______________________________________________________________________
A BILL
To amend the Federal Power Act to provide that activities to maintain
or increase the capacity of the electric grid within certain areas are
a category of actions designated as being categorically excluded from
the preparation of an environmental assessment or an environmental
impact statement under the National Environmental Policy Act of 1969,
and for other purposes.
Be it enacted by the Senate and House of Representatives of the
United States of America in Congress assembled,
SECTION 1. SHORT TITLE.
This Act may be cited as the ``Smart Transmission Line Placement
Act''.
SEC. 2. CATEGORICAL EXCLUSION FOR RECONDUCTORING.
The Federal Power Act is amended by inserting after section 216 (16
U.S.C. 824p) the following:
``SEC. 216A. GRID CAPACITY EXPANSION IN EXISTING RIGHTS-OF-WAY.
``(a) Definitions.--In this section:
``(1) Applicable electrical standard.--The term `applicable
electrical standard' includes--
``(A) a reliability standard (as defined in section
215(a)); and
``(B) an applicable standard of the National
Electrical Safety Code published by the Institute of
Electrical and Electronics Engineers Standards
Association.
``(2) Covered area.--The term `covered area' means an
area--
``(A) within an existing right-of-way; or
``(B) within the minimum additional area adjacent
to an existing right-of-way that is necessary--
``(i) to comply with applicable electrical
standards; or
``(ii) to complete an activity described in
subsection (b).
``(3) Covered facility.--The term `covered facility' means
an existing electric transmission or distribution facility or
associated infrastructure (including an electrical substation)
that is located within a covered area.
``(b) Exemptions.--
``(1) In general.--Activities to maintain or increase the
capacity of the electric grid within a covered area, and any
Federal agency action authorizing such activities--
``(A) are a category of actions designated as being
categorically excluded from the preparation of an
environmental assessment or an environmental impact
statement under the National Environmental Policy Act
of 1969 (42 U.S.C. 4321 et seq.); and
``(B) shall not be considered to be--
``(i) a major Federal action for purposes
of that Act; or
``(ii) an undertaking for purposes of
section 306108 of title 54, United States Code.
``(2) Inclusions.--The activities described in paragraph
(1) include--
``(A) any repair, maintenance, replacement,
upgrade, rebuilding, modification, optimization, minor
relocation of, or addition to, a covered facility,
including--
``(i) reconductoring;
``(ii) an increase in operating voltage;
``(iii) a circuit addition or adjustment;
and
``(iv) installation of advanced
transmission technologies (as defined in
section 1223(a) of the Energy Policy Act of
2005 (42 U.S.C. 16422(a)));
``(B) any minimum widening of an existing right-of-
way associated with an activity described in
subparagraph (A) that--
``(i) is necessary to comply with
applicable electrical standards; or
``(ii) remains within a covered area;
``(C) an addition of energy storage at or near a
covered facility; and
``(D) the addition of a parallel circuit within an
existing right-of-way.''.
SEC. 3. ELECTRIC GRID PROJECTS.
(a) Definition of Previously Disturbed or Developed.--In this
section, the term ``previously disturbed or developed'' has the meaning
given the term in section 1021.410(g)(1) of title 10, Code of Federal
Regulations (or successor regulations).
(b) Rulemaking.--Not later than 180 days after the date of
enactment of this Act, to facilitate timely permitting, the Secretary
of the Interior and the Secretary of Agriculture shall each develop or
adopt 1 or more categorical exclusions, including allowing for
extraordinary circumstances under which the categorical exclusion shall
not be available, under the National Environmental Policy Act of 1969
(42 U.S.C. 4321 et seq.) for the following activities:
(1) Placement of an electric transmission or distribution
facility in an approved right-of-way corridor, including a
corridor designated under section 368 of the Energy Policy Act
of 2005 (42 U.S.C. 15926).
(2) Any repair, maintenance, replacement, upgrade,
modification, optimization, or minor relocation of, or addition
to, an existing electric transmission or distribution facility
or associated infrastructure, including electrical substations,
within an existing right-of-way or on otherwise previously
disturbed or developed land, including reconductoring and
installation of grid-enhancing technologies.
(3) Construction, operation, upgrade, or decommissioning of
a battery or other energy storage technology on previously
disturbed or developed land.
<all>